My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />144 <br />Potholing of existing utilities, points of connection and service connections to determine <br />exact depth and field locations shall be the responsibility of the Contractor. <br />The Contractor shall determine the location and depth of all utilities including service <br />connections and points of connection, which may affect or be affected by its operation, <br />three (3) weeks in advance. In the event of any conflicts the Engineer shall be <br />immediately notified. <br />City owned utility frames and covers for survey monuments, water meter, water valves, <br />traffic signal and street light pull boxes, and manholes within the area to be paved or <br />graded, shall be set to finish grade by Contractor after construction of new pavement. In <br />Portland cement concrete pavement and sidewalk areas, City utility frames and covers <br />shall be adjusted to grade prior to placement of concrete. Contractor shall supply new <br />sewer manhole frame and covers, sewer cleanout frame and covers, concrete rings and <br />water valve pot frame, canister and lids per City of Santa Ana Standard Plans. <br />Prior to paving, an "I.D. Locator" shall be attached to each valve box or manhole cover. <br />An "ID Locator" is a rubberized marker approximately 4" high that adheres to the utility <br />cover and pops-up after paving for easy identification and location of the respective valve <br />box or manhole. Contractor shall measure and tie-out locations of manholes and water <br />valves prior to paving. <br />6.04 LANDSCAPING AND IRRIGATION REPAIR <br />This section shall conform to Sections 212 and 308 of the Standard Specifications and <br />these Special Provisions. <br />All lawn and landscaped areas disturbed by the Contractor as part of or as a result of the <br />work shall be prepared/brought to adjacent grade and restored to match existing <br />landscaping. If there are any existing sprinkler heads and irrigation lines in the <br />construction areas, whether on public or private property, they shall be replaced or <br />relocated by the Contractor. <br />6.05 PORTLAND CEMENT CONCRETE (PCC) CROSS GUTTER <br />This work shall consist of replacing PCC cross-gutter from the spandrel to street <br />centerline (cold joint to cold joint) to facilitate water main construction. All work shall <br />be accomplished in accordance with City of Santa Ana Standard Plan No. 1109. The <br />replacement areas are clearly indicated on the construction plans. <br />Concrete shall be high early strength concrete, treated in accordance with section <br />201-1 to obtain (7) day compressive strength in (3) days. <br />6.06 TEMPORARY PAVING (WHEN TRENCHING IN PCC STREETS) <br />In PCC streets, all trenches shall be backfilled and have temporary pavement installed or <br />covered with steel traffic plates at the end of each working day. All steel plates shall be <br />set flush with adjacent pavement. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.