My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />146 <br />Local Streets: <br />Deep lift asphalt concrete pavement consisting of an asphalt concrete Base Course <br />and 2” asphalt concrete Surface Course. Thickness of entire section and base <br />course shall be as shown on plans. In the absence of a detail on the plans, a 6” <br />thick deep lift asphalt concrete pavement consisting of 4” thick asphalt concrete <br />Base Course and 2” asphalt concrete Surface Course shall be constructed. <br />The required asphalt concrete mix designs shall be as follows: <br /> Base Course III-B3-AR-4000 or PG 64-10 <br /> Overlay/Surface Course III-C3-AR-4000 or PG 64-10 <br /> Crack Filler III-F-AR-4000 or PG 64-10 <br />6.08 PERMANENT PORTLAND CEMENT CONCRETE (PCC) TRENCH PAVEMENT <br />AND BUS PAD REPLACEMENT <br />PCC pavement replacement shall be at least 6 inches thick and shall be 1 inch thicker <br />than the existing pavement. <br />Existing concrete pavement adjacent to trench operations shall be sawcut and drilled with <br />#4 dowel bars epoxy coated and or approved. <br />Construction and installation of dowels shall be per City of Santa Ana Standard Plan No. <br />1428A, the construction plans, and these specifications. <br />PCC pavement replacement and bus pad replacement shall conform to Sections, 400, <br />200, 201, and 302 of the Standard Specifications and these Special Provisions. <br />PCC used for street pavement and bus pad construction shall be minimum class 560-A- <br />3250. In addition to these minimum requirements, the concrete shall possess the <br />following characteristics: <br /> Flexural strength at 28 days: 550 p.s.i. min. <br /> Flexural strength at 7 days: 430 p.s.i. min. <br /> Compressive strength at 7 days: 2500 p.s.i. min. <br />All cement to be used or furnished on this Project shall be Type II low alkaline Portland <br />cement conforming to ASTM C150. <br />Prior to the start of construction, the Contractor shall furnish to the Engineer laboratory <br />test data for the particular mix design he will use. The data will include the following: <br />A. A detailed concrete mix design including the type and amount of cement used; <br />complete gradation and source of the aggregate used; the amount of water used; and <br />any proposed admixtures. <br />B. Flexural strength test data for the same batch of concrete used in A above showing <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.