Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />149 <br />bypass piping for the effluent during the construction of the sewer main between <br />manholes. The inlet of the downstream manhole and the outlet of the upstream manhole <br />shall be plugged. A portable pump shall be installed in the upstream manhole to <br />discharge the effluent from the upstream manhole to the downstream manhole through <br />the bypass piping. Pump and bypass piping shall be of adequate size and capacity to <br />handle the flow without sewage backup occurring to facilities connected to the sewer. <br />For sewers 12-inches in diameter and larger, or where deemed necessary by the City, the <br />following shall apply: <br />All pumps used shall be fully automatic self-priming units. All pumps used must be <br />constructed to allow dry running for long periods of time to accommodate the cyclical <br />nature of effluent flows. The Contractor shall provide the necessary stop/start controls <br />for each pump. The Contractor shall have adequate standby equipment available and <br />ready for immediate operation and use in the event of an emergency or breakdown. One <br />standby pump for each size pump utilized shall be installed at the mainline flow <br />bypassing locations, ready for use in the event of primary pump failure. The Contractor <br />shall continually monitor all pumping equipment. The Contractor shall perform leakage <br />and pressure tests of the bypass pumping discharge piping suing clean water prior to the <br />actual operation. The Water Resources Division shall be given 24 hours notice prior to <br />testing. <br />The Contractor shall be required to flow monitor for a two week period to assist in sizing <br />the pumps necessary for the sewer work and shall be considered included as part of the <br />work. The Contractor shall prepare, with the vendor, a flow monitoring map for key <br />manholes that will provide adequate data for the work subject to review and approval <br />from the Water Resources Division. Flow monitoring shall capture accurate <br />instantaneous depth, velocity and flow data in 15-minute increments or less, or as <br />otherwise approved by the Water Resources Division. The Contractor shall prepare with <br />the vendor a specific, detailed description of the proposed pumping system and submit it <br />and the vendor’s references to the City. The Contractor shall submit to the City detailed <br />descriptions outlining all provisions and precautions to be taken by the Contractor <br />regarding handling of existing sewage flows. The submit tal must be specific and <br />complete, including such items as schedules, capacities of equipment, materials, and all <br />other incidental protection of the access and bypass pumping locations from damage due <br />to the discharge flows. <br />The submittal shall include but not be limited to the following: <br />1. Sewer plugging method and types of plug. <br />2. Number, size, material, location and method of installation of suction piping. <br />3. Number, size, material, location and method of installation of discharge piping. <br />4. Bypass pump sizes, capacity, number of each size to be on-site and power <br />requirements. <br />505 E Central Ave <br />#B11/6/2024