Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />168 <br />7.00 SPECIAL PROVISIONS - WATER MAIN IMPROVEMENTS <br />7.01 GENERAL <br />All equipment and materials used installed in the water system shall meet all state and <br />federal standards. All products in contact with drinking water shall be tested and certified <br />to meet NSF/ANSI standard 60 (Drinking Water Treatment Chemicals-Health Effects) <br />and NSF/ANSI 61 (Drinking Water System Components-Health Effects) <br />All materials coming in contact with potable water shall be lead free per California <br />Health & Safety Code Section 116875. <br />7.02 OPEN TRENCH OPERATIONS, EXCAVATION, BEDDING, AND BACKFILL <br />Open trench operations, excavation, bedding and backfill shall conform to the applicable <br />provisions of Section 306 of the Standard Specifications and these Special Provisions. <br />Contractor shall excavate open trench 100 feet ahead of pipe laying operations to allow <br />for any adjustments in grade necessary to resolve unforeseen utility conflicts. <br /> All trenches shall be base paved with hot mix or covered with steel traffic plates recessed <br />and flushed with existing pavement at the end of each working day. No temporary <br />pavement will be allowed. <br />Trenching operations shall not be allowed on more than one street at any time. Work <br />shall not be allowed in more than one intersection at any one time. <br />The third paragraph of Subsection 306-1.1.1 of the Standard Specifications is hereby <br />deleted and replaced as follows: <br />Excavation shall include the removal of all excess excavated materials and all <br />water and materials of any nature, which interfere with the construction work. <br />All pavement removals shall be sawcut unless, approved otherwise by the Engineer prior <br />to commencement of work. <br />All removed pavement and excess excavated material shall be immediately disposed of <br />off the project site at a legal dumpsite at the Contractor's expense. <br />Pipe bedding and trench backfill shall be accomplished in accordance with the City of <br />Santa Ana Standard Plan No. 1150, these Special Provisions, and the trench details on the <br />construction drawings. The pipe zone and bedding material for water mains shall be <br />imported SE-30 sand. The trench zone backfill shall be Class II aggregate base. <br />All material tickets (i.e. Sand, Class II Base, Asphalt, Concrete, etc.) shall be given to the <br />City Inspector on a daily basis. <br />505 E Central Ave <br />#B11/6/2024