Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />170 <br />Prior to paving, an "I.D. Locator" shall be attached to each valve box or manhole cover. <br />An "ID Locator" is a rubberized marker approximately 4" high that adheres to the utility <br />cover and pops-up after paving for easy identification and location of the respective valve <br />box or manhole. Contractor shall measure and tie-out locations of manholes and water <br />valves prior to paving. <br />7.04 LANDSCAPING AND IRRIGATION REPAIR <br />This section shall conform to Sections 212 and 308 of the Standard Specifications and <br />these Special Provisions. <br />All lawn and landscaped areas disturbed by the Contractor as part of or as a result of the <br />work shall be prepared/brought to adjacent grade and restored to match existing <br />landscaping. <br />If there are any existing sprinkler heads and irrigation lines in the con struction areas, <br />whether on public or private property, they shall be replaced or relocated by the <br />Contractor. <br />7.05 PORTLAND CEMENT CONCRETE (PCC) CROSS GUTTER <br />This work shall consist of replacing PCC cross-gutter from the spandrel to street <br />centerline (cold joint to cold joint) to facilitate water main construction. All work shall <br />be accomplished in accordance with City of Santa Ana Standard Plan No. 1109. The <br />replacement areas are clearly indicated on the construction plans. <br />Concrete shall be high early strength concrete, treated in accordance with section <br />201-1 to obtain (7) day compressive strength in (3) days. <br />7.06 TEMPORARY PAVING <br />In PCC streets, all trenches shall be backfilled and have temporary pavement installed or <br />covered with steel traffic plates at the end of each working day. All steel plates shall be <br />set flush with adjacent pavement. <br />Within four consecutive calendar days following installation of the conduit, or after <br />compaction is approved by the Engineer, whichever comes first, steel traffic plates shall <br />be removed and three inches of temporary pavement installed. <br />Cross streets are to be paved with temporary pavement on the same day that excavation <br />and backfill are completed. Temporary pavement shall be maintained so that a smooth <br />traversable surface is available at all times for vehicular traffic, free from ruts, <br />depressions, and holes and loose gravel. Temporary paving shall be removed and <br />disposed of by the Contractor before the permanent resurfacing is placed. <br />505 E Central Ave <br />#B11/6/2024