Laserfiche WebLink
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 11 00 - 2 Summary of Work <br />C. Site improvements <br />1. Construction of a new shade structure as indicated in the contract documents. <br />2. Construction of a new fence lining the east lawn of the site as indicated in the <br />contract documents. <br />3. Construction of a new walking path as indicated in the contract documents. <br />4. Construction of a new tot lot as indicated in the contract documents. <br />5. Construction of a new gathering area as indicated in the contract documents. <br />6. Install new bollard lighting as indicated in the contract documents. <br />7. Improve site lighting as indicated in the contract documents. <br />D. Miscellaneous improvements <br />1. I.T. Improvements to connect the new library into the existing infrastructure as <br />indicated in the contract documents. <br />2. Install a new book drop in the parking/drive isle as indicated in the contract <br />documents. <br />3. Install new signage above the new shade structure as indicated in the contract <br />documents. <br />4. Renovate existing marquee signage facing E. Central Ave as indicated in the <br />contract documents. <br />1.3 REQUIREMENTS INCLUDED <br />A. This section includes administrative provisions: <br />1. Work sequence. <br />2. Contractors use of premises. <br />3. Building occupancy. <br />4. Field engineering. <br />5. Lines and levels. <br />6. Regulatory requirements and reference standards. <br />7. Owner furnished Contractor installed products (OFCI). <br />8. Owner pre-ordered products. <br />1.4 WORK SEQUENCE <br />A. Coordinate construction schedule and operations with Owner and Architect. <br />1. Construct Work to accommodate Owner's occupancy requirements during <br />construction period. <br />B. Perform construction in phases as indicated. <br />505 E Central Ave <br />#B11/6/2024