My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 11 00 - 2 Summary of Work <br />C. Site improvements <br />1. Construction of a new shade structure as indicated in the contract documents. <br />2. Construction of a new fence lining the east lawn of the site as indicated in the <br />contract documents. <br />3. Construction of a new walking path as indicated in the contract documents. <br />4. Construction of a new tot lot as indicated in the contract documents. <br />5. Construction of a new gathering area as indicated in the contract documents. <br />6. Install new bollard lighting as indicated in the contract documents. <br />7. Improve site lighting as indicated in the contract documents. <br />D. Miscellaneous improvements <br />1. I.T. Improvements to connect the new library into the existing infrastructure as <br />indicated in the contract documents. <br />2. Install a new book drop in the parking/drive isle as indicated in the contract <br />documents. <br />3. Install new signage above the new shade structure as indicated in the contract <br />documents. <br />4. Renovate existing marquee signage facing E. Central Ave as indicated in the <br />contract documents. <br />1.3 REQUIREMENTS INCLUDED <br />A. This section includes administrative provisions: <br />1. Work sequence. <br />2. Contractors use of premises. <br />3. Building occupancy. <br />4. Field engineering. <br />5. Lines and levels. <br />6. Regulatory requirements and reference standards. <br />7. Owner furnished Contractor installed products (OFCI). <br />8. Owner pre-ordered products. <br />1.4 WORK SEQUENCE <br />A. Coordinate construction schedule and operations with Owner and Architect. <br />1. Construct Work to accommodate Owner's occupancy requirements during <br />construction period. <br />B. Perform construction in phases as indicated. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.