My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 30 00 - 1 Administrative Requirements <br />SECTION 01 30 00 <br />ADMINISTRATIVE REQUIREMENTS <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. This section describes general procedural requirements for ongoing submittals. <br />1. Schedule of values. <br />2. Product data and manufacturer’s literature. <br />3. Shop drawings. <br />4. Samples. <br />5. Manufacturers' certificates. <br />6. Excess materials and attic stock. <br />7. Design build (delegated design) procedures. <br />8. Deferred approval requirements. <br />B. Related Requirements: <br />1. Section 01 31 00: Project management and coordination. <br />2. Section 01 32 10: Construction Schedule – Bar Chart. <br />3. Section 01 40 00: Test reports, manufacturer's field reports, and mock-ups. <br />4. Section 01 70 00: Manufacturers’ instructions. <br />5. Section 01 77 00: Closeout requirements including Project Record Documents. <br />6. Section 01 78 00: Warranties. <br />1.2 GENERAL SUBMITTAL PROCEDURES <br />A. Submittals: Transmit each item using form approved by Architect; submit sample to <br />Architect for approval prior to use. <br />1. Identify Project, Contractor, subcontractor, major supplier. <br />a. Attach sequential identification number for each new submittal. <br />b. Identify each resubmittal using original submittal number and sequential <br />identification clearly indicating item is resubmitted. <br />2. Identify pertinent Drawing sheet and detail number, and Specification section <br />number as appropriate. <br />3. Identify deviations from Contract Documents. <br />4. Provide space for Contractor and Architect review stamps. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.