Laserfiche WebLink
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 30 00 - 3 Administrative Requirements <br />1. Manufacturer installation instructions and recommendations shall be considered <br />information submittals. <br />F. Design/Build Submittals: Where portion of Work requires design by specialized <br />professionals submit information necessary to ensure work complies with Contract <br />Documents along with certifications signed by qualified professional. <br />1. Calculations: Do not submit calculations unless specifically required by Contract <br />Documents; submit calculations required by applicable authorities directly to <br />applicable authorities; <br />a. Submit certification by qualified professional indicating required calculations <br />have been prepared and work conforms to Contract Documents and <br />applicable codes and regulations. <br />G. Maintenance Materials Submittals: Compile maintenance information and materials <br />during Work to ensure complete set of documents, maintenance manuals, and <br />operation instructions. <br />H. Closeout Submittals: Compile closeout submittals, organize, and submit to Owner <br />prior to or at time of Substantial Completion. Project will not be considered <br />Substantially Complete until closeout submittals have been received by Owner. <br />I. Material Safety Data Sheets (MSDS): MSDS will only be reviewed by Architect when <br />submitted to show compliance with LEED certification requirements. <br />1. Non-LEED submittals that include material safety data sheets will be returned for <br />resubmittal. <br />1.4 SCHEDULE OF VALUES <br />A. Submit typed schedule on AIA Form G703 or another Owner and Architect pre- <br />approved 8-1/2" by 11" paper format; Contractor's standard media-driven printout will <br />be considered on request. Submit within 15 days after award of Contract. <br />B. Format: Table of Contents of this Project Manual, with modifications as pre-approved <br />by Owner and Architect; identify each line item with number and title of major <br />Specification sections. <br />C. Include in each line item a directly proportional amount of Contractor overhead and <br />profit. <br />D. Revise schedule to list change orders for each Application for Payment. <br />1. Submit subschedule for each phase of Work. <br />1.5 PRODUCT DATA/MANUFACTURERS' LITERATURE <br />A. Action Submittals: Mark each copy to identify applicable Products, models, options, <br />and other data; supplement manufacturers' standard data to provide information <br />unique to the Work. <br />505 E Central Ave <br />#B11/6/2024