My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovation 9/29/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 30 00 - 1 Information and Procedures <br /> <br />SECTION 01 31 10 <br />INFORMATION AND PROCEDURES INSTRUCTIONS (RFI) <br />PART 1 – GENERAL <br />1.1 SUMMARY <br />A. This Section contains procedures to be followed by Contractor upon discovery of any <br />apparent conflicts, omissions, or errors in Contract Documents or upon having any <br />question concerning interpretation. <br />B. Alternate: At the Owners option, Utilize the standard forms, procedures, contracts <br />and / or agreements, preferred by the owner, in lieu of the methods described herein. <br /> <br />1.2 PROCEDURES <br />A. Requests for clarification or additional information shall be submitted in writing to <br />Architect using a Request for Information (RFI) form approved by Architect. <br />B. RFIs shall be numbered sequentially. RFI number shall be followed by a <br />sequential numerical suffix as necessary for each resubmission. For example, <br />first RFI would be 001. Second RFI would be 002 and first resubmittal of RFI 002 <br />would be 002.1. <br /> <br />C. Each RFI shall be limited to ONE subject. <br />D. An RFI shall be submitted if one of following conditions occur: <br />1. Contractor discovers an unforeseen condition or circumstance that is not <br />described in Contract Documents. <br />2. Contractor discovers an apparent conflict or discrepancy between <br />portions of Contract Documents that appears to be inconsistent or is not <br />reasonably inferred from intent of Contract Documents. <br />3. Contractor discovers what appears to be an omission from Contract <br />Documents that cannot be reasonably inferred from intent of Contract <br />Documents. <br /> <br />E. Contractor shall not: <br />1. Submit an RFI as a request for substitution. <br />2. Submit an RFI as a submittal. <br />3. Submit an RFI under pretense of a Contract Documents discrepancy or <br />omission without thorough review of documents. <br /> <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.