My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Delhi Community Center Library Renovations 10/13/2023 <br />Santa Ana, California <br /> <br /> <br /> 01 56 39 - 1 Temporary Tree and Plant Protection <br />SECTION 01 56 39 <br />TEMPORARY TREE AND PLANT PROTECTION <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. This Section includes the protection and trimming and root pruning of trees that <br />interfere with, or are affected by, execution of the Work, whether temporary or new <br />construction. <br />1.2 SUBMITTAL <br />A. The Contractor's representatives and employees shall be experienced in landscape <br />maintenance. <br />B. Certification from a qualified arborist that trees indicated to remain have been <br />protected during construction according to recognized standards and that trees were <br />promptly and properly treated and repaired when damaged. <br />C. Maintenance recommendation from a qualified arborist for care and protection of <br />trees affected by construction during and after completing the Work. <br />1.3 QUALITY ASSURANCE <br />A. Arborist Qualifications: An arborist certified by the International Society of <br />Arboriculture or licensed in the jurisdiction where Project is located. <br />B. Tree Pruning Standards: Comply with ANSI A300, "Trees, Shrubs, and Other Woody <br />Plant Maintenance--Standard Practices," unless more stringent requirements are <br />indicated. <br />C. Pre-installation Conference: Before starting tree protection and trimming, meet with <br />representatives of authorities having jurisdiction, Owner, Landscape Architect, <br />consultants, and other concerned entities. Review tree protection and trimming <br />procedures and responsibilities. <br /> <br />PART 2 - PRODUCTS <br />2.1 MATERIALS <br />A. Drainage Fill: Selected crushed stone, or crushed or uncrushed gravel, washed, <br />ASTM D 448, Size 24, with 90 to 100 percent passing a 2-1/2-inch sieve and not <br />more than 10 percent passing a 3/4-inch sieve. <br />B. Topsoil: Fertile, friable, surface soil, containing natural loam and complying with <br />ASTM D 5268. Provide topsoil that is free of stones larger than 1 inch in any <br />dimension and free of other extraneous or toxic matter harmful to plant growth. <br />Obtain topsoil only from well-drained sites where soil occurs in depth of 4 inches or <br />more; do not obtain from bogs or marshes. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.