My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1430 E Edinger Ave-REV 1 - Plan
PBA
>
Building
>
ProjectDox
>
E
>
Edinger Ave
>
1430 E Edinger Ave
>
1430 E Edinger Ave-REV 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:02:00 AM
Creation date
2/24/2026 5:00:43 AM
Metadata
Fields
Template:
Plan
Permit Number
20183198
20186203
30147418
30148982
40139225
40140476
101119781
101119782
Full Address
1430 E Edinger Ave
Street Number
1430
Street Direction
E
Street Name
Edinger
Street Suffix
Ave
Document Relationships
101119781 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Edinger Ave\1430 E Edinger Ave
101119782 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Edinger Ave\1430 E Edinger Ave
20183198 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Edinger Ave\1430 E Edinger Ave
20186203 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Edinger Ave\1430 E Edinger Ave
30147418 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Edinger Ave\1430 E Edinger Ave
30148982 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Edinger Ave\1430 E Edinger Ave
40139225 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Edinger Ave\1430 E Edinger Ave
40140476 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Edinger Ave\1430 E Edinger Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
931
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fin. Floor <br />0' -0" <br />Roof <br />11' -2" <br />Fin Surface <br />-0' -6" <br />Clg. Height <br />10' -0" <br />2 <br />A-015 <br />16 <br />' <br /> <br />- <br /> <br />6 <br />" <br />2' <br /> <br />- <br /> <br />1 <br />0 <br />" <br />2' <br /> <br />- <br /> <br />2 <br />" <br />1' <br /> <br />- <br /> <br />6 <br />" <br />10 <br />' <br /> <br />- <br /> <br />0 <br />" <br />10 <br />' <br /> <br />- <br /> <br />0 <br />" <br />19 <br />' <br /> <br />- <br /> <br />0 <br />" <br />7' <br /> <br />- <br /> <br />6 <br />" <br />1' <br /> <br />- <br /> <br />6 <br />" <br />10 <br />' <br /> <br />- <br /> <br />0 <br />" <br />CE <br />I <br />L <br />I <br />N <br />G <br /> <br />H <br />E <br />I <br />G <br />H <br />T <br />9' <br />- <br />1 <br />0 <br />" <br /> <br />T <br />O <br /> <br />F <br />I <br />N <br />I <br />S <br />H <br />EXISTING CONCRETE <br />SLAB TO REMAIN <br />PROPOSED NEW SLAB AT <br />EXTERIOR WALKWAY. <br />SEE CIVIL PLANS. <br />PROPOSED NEW SLAB AT <br />DRIVE-THRU. SEE CIVIL <br />PLANS. <br />PROPOSED NEW PLANTER. <br />SEE CIVIL PLANS. <br />A-022 <br />3 <br />A-019 <br />4 <br />A-021 <br />2 <br />EXTEND EXISTING <br />PARAPETS, REFER TO <br />STRUCTURAL PLANS. <br />FILL IN ATTIC WITH INSULATION <br />OR PROVIDE ATTIC VENTILATION <br />PER 2022 CBC <br />2 <br />A-022 <br />2 <br />A-022 <br />2 <br />A-022 <br />A-021 <br />2 <br />A-019 <br />4 <br />PROPOSED ROOF TRUSS <br />SYSTEM REFER TO <br />STRUCTURAL & TRUSS PLANS. <br />PROPOSED MULTI PLY BUILT <br />UP ROOFING SYSTEM OVER <br />PLYWOOD, REFER TO ROOF <br />PLAN & S.E. FOR TRUSS <br />PROPOSED ROOF MOUNTED <br />MECHANICAL EQUIPMENT ON <br />RAISED WOOD PLATFORM PER <br />STRUCTURAL ENGINEER <br />Top of Parapet <br />15' -6" <br />SLOPED <br />DRIVE-THRU <br />REFER TO <br />CIVIL PLANS <br />Fin. Floor <br />0' -0" <br />Roof <br />11' -2" <br />Fin Surface <br />-0' -6" <br />Clg. Height <br />10' -0" <br />1 <br />A-015 <br />1' <br /> <br />- <br /> <br />6 <br />" <br />10 <br />' <br /> <br />- <br /> <br />0 <br />" <br />7' - 0" <br />13 <br />' <br /> <br />- <br /> <br />6 <br />" <br />CE <br />I <br />L <br />I <br />N <br />G <br /> <br />H <br />E <br />I <br />G <br />H <br />T <br />9' <br />- <br />1 <br />0 <br />" <br /> <br />T <br />O <br /> <br />F <br />I <br />N <br />I <br />S <br />H <br />2' <br /> <br />- <br /> <br />8 <br />" <br />2' <br /> <br />- <br /> <br />4 <br />" <br />A-022 <br />3 <br />2 <br />A-022 <br />2 <br />A-022 <br />2 <br />A-022 <br />A-019 <br />4A-021 <br />1 <br />1 <br />A-022 <br />EXISTING CONCRETE SLAB <br />TO REMAIN. REFER TO <br />STRUCTURAL <br />EXISTING EXTERIOR <br />WALLS TO REMAIN <br />PROPOSED ROOF TRUSS <br />STRUCTURE, REFER TO <br />STRUCTURAL PLANS. <br />MECHANICAL SCREEN <br />REFER TO ROOF PLAN <br />PROPOSED NEW SLAB AT EXTERIOR <br />DINING. SEE CIVIL PLANS. <br />PROPOSED NEW SLAB AT <br />DRIVEWAY. SEE CIVIL PLANS. <br />PROPOSED NEW SLAB AT <br />DRIVEWAY. SEE CIVIL PLANS. <br />PROPOSED MULTI PLY BUILT UP <br />ROOFING SYSTEM OVER <br />PLYWOOD, REFER TO ROOF <br />PLAN & S.E. FOR TRUSS <br />GENERAL FINISHES NOTE: <br />SEE COLOR & MATERIAL BOARD FOR ALL <br />EXTERIOR COLORS AND MATERIALS INCLUDING <br />EXTERIOR FINISHES. AS WELL REFER TO 3D VIEWS <br />SHEETS A-8.0 SERIES FOR DIAGRAMATIC <br />SKETCH RENDERINGS SHOWING COLOR & MATERIALS. <br />SLOPE 1/4":12" <br />Top of Parapet <br />15' -6" <br />1/4" <br />12" <br />9' <br /> <br />- <br /> <br />0 <br />" <br /> <br />T <br />O <br /> <br />F <br />I <br />N <br />I <br />S <br />H <br /> <br />S <br />O <br />F <br />F <br />I <br />T <br />CE <br />I <br />L <br />I <br />N <br />G <br /> <br />H <br />E <br />I <br />G <br />H <br />T <br />9' <br />- <br />1 <br />0 <br />" <br /> <br />T <br />O <br /> <br />F <br />I <br />N <br />I <br />S <br />H <br />@ <br />P <br />A <br />R <br />K <br />I <br />N <br />G <br />0' <br /> <br />- <br /> <br />6 <br />" <br /> <br /> <br />C <br />U <br />R <br />B <br />@ <br />D <br />R <br />I <br />V <br />E <br />- <br />T <br />H <br />R <br />U <br />0' <br /> <br />- <br /> <br />6 <br />" <br /> <br /> <br />C <br />U <br />R <br />B <br />PROPOSED NEW SLAB AT <br />DRIVEWAY. SEE CIVIL PLANS. <br />Fin. Floor <br />0' -0" <br />Roof <br />11' -2" <br />Clg. Height <br />10' -0" <br />3' - 6" <br />16 <br />' <br /> <br />- <br /> <br />0 <br />" <br />4' <br /> <br />- <br /> <br />6 <br />" <br />1' <br /> <br />- <br /> <br />6 <br />" <br />10 <br />' <br /> <br />- <br /> <br />0 <br />" <br />A-021 <br />2 <br />A-022 <br />2 <br />9' <br />- <br />1 <br />0 <br />" <br /> <br />T <br />O <br /> <br />F <br />I <br />N <br />I <br />S <br />H <br />1' <br /> <br />- <br /> <br />0 <br />" <br />0' <br /> <br />- <br /> <br />2 <br /> <br />1 <br />/ <br />2 <br />" <br />1' <br /> <br />- <br /> <br />1 <br /> <br />1 <br />/ <br />2 <br />" <br />0' <br /> <br />- <br /> <br />2 <br /> <br />1 <br />/ <br />2 <br />" <br />7' <br /> <br />- <br /> <br />6 <br />" <br />PROPOSED SOLID BACKER AT <br />PROPOSED BUILDING SIGNAGE PER <br />CITY REGULATIONS. ALL SIGNAGE <br />SHALL BE SEPARATE DEFERRED <br />SUBMITTAL <br />SIGNAGE PER SEPARATE DEFERRED <br />SUBMITTAL, SEE ELEVATIONS A-3.0 SERIES <br />Top of Parapet <br />15' -6" <br />Scale <br />Date <br />Drawn By <br />Checked By <br />Project Number <br />14 <br />3 <br />0 <br /> <br />E <br /> <br />E <br />D <br />I <br />N <br />G <br />E <br />R <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />NOVUM <br />A R C H I T E C T U R E, Inc <br />www.novumarchitecture.com <br />OFFICES: SOUTH BAY / ORANGE COUNTY <br />116 S CATALINA AVE. STE. 122, <br />REDONDO BEACH, CA 90277 <br />TEL: 310-383-1827 / 310-709-4476 <br />N <br />DARIAN <br />RADAC <br />NO. C-33451 <br />RENEWAL DATE <br />LICENSED <br />STA <br />OE <br />CETIHCRA <br />T <br />T <br />F <br />INR <br />I O <br />CALF <br />A2-28-2025 <br />Darian Radac <br />As indicated <br />A-015 <br />TO <br />M <br />' <br />S <br /> <br />J <br />R <br />Checker <br />Author <br />11-20-2024 <br />tom's2023 <br />Bu <br />i <br />l <br />d <br />i <br />n <br />g <br /> <br />S <br />e <br />c <br />t <br />i <br />o <br />n <br />s <br />Mr <br />. <br /> <br />S <br />p <br />i <br />r <br />o <br />s <br /> <br />P <br />o <br />l <br />i <br />t <br />i <br />s <br />1/4" = 1'-0"1 Section 1 <br />1/4" = 1'-0"2 Section 2 <br />3/4" = 1'-0"3 Section 3 <br />FU <br />R <br />R <br /> <br />C <br />E <br />I <br />L <br />I <br />N <br />G <br /> <br />A <br />T <br /> <br />I <br />N <br />T <br />E <br />R <br />I <br />O <br />R <br /> <br />9 <br />' <br />- <br />1 <br />0 <br />" <br />3 <br />No. Description Date <br />3 BLDG Revision 3 11.20.24 <br />1430 E Edinger Ave <br />3/27/2025
The URL can be used to link to this page
Your browser does not support the video tag.