Laserfiche WebLink
Be am ID: 30 Fl Bm @ M AU1 <br />Section type:Douglas Fir-Larch No.2 <br />Section name:4x8 <br />Fb(+)/Fb(-) (psi): 900/900 Fv (psi): 180 <br />E (psi): 1600000 Lu (ft): 0 <br />Ignore shear within (d): True Repetitive member : False <br />Applie d Loads: <br />Load_Roof 235.625PLF =7.25 x (45+20)/2 @ 0' to 3.25' <br />SELF WEIGHT 5.95PLF From 0' to 3.25' <br />Factors: <br />Ct = 1 Cm = 1 CL = 1.00 CF = 1.3 Cfu = 1 Ci = 1 Cr = 1 CT = 1 <br />Re actions: <br />Support D L Lr S WSN WWE ESN EWE M ax. LC (Down/Up) <br />1 275 0 118 0 0 0 0 0 393/0 <br />2 275 0 118 0 0 0 0 0 393/0 <br />Code che ck: <br />Actual Loc.(ft)Allowe d Ratio (%)CD <br />Moment (lbs-ft)319 1.62 3737 9 1.25 <br />Shear (lbs)235 0 3806 6 1.25 <br />Live Deflection 0.001 1.62 0.108 1 - <br />Total Deflection 0.003 1.62 0.162 2 - <br />Passe d <br />Max Moment: D + Lr <br />Max Shear: D + Lr <br />Max Deflection: D + Lr <br />Be am ID: GT-31 G. Truss @ RTU Truss De signe d by Othe rs <br />Applie d Loads: <br />Load_Roof 52.5PLF =3 x (15+20)/2 @ 0' to 15.75' <br />POINT supp#2 of Beam 27 @ 0.75ft, (D=415 Lr=174) <br />POINT supp#2 of Beam 27 @ 5.25ft, (D=415 Lr=174) <br />SELF WEIGHT 30PLF From 0' to 15.75' <br /> Point Load Location <br />Re actions:Supp. #1 Supp. #2 <br />Down (D+Lr+L/Max. Load Comb.)1255/1255 1224/1224 <br />Up (D+Lr+L/Max. Load Comb.)0/0 0/0 <br />Be am ID: GT-32 G. Truss @ RTU2 Truss De signe d by Othe rs <br />Applie d Loads: <br />Load_Roof 52.5PLF =3 x (15+20)/2 @ 0' to 34.75' <br />POINT supp#2 of Beam 28 @ 7.25ft, (D=363 Lr=148) <br />POINT supp#2 of Beam 28 @ 13ft, (D=363 Lr=148) <br />POINT supp#1 of Beam 29 @ 16.25ft, (D=188 Lr=77) <br />POINT supp#1 of Beam 29 @ 19.5ft, (D=188 Lr=77) <br />SELF WEIGHT 40PLF From 0' to 34.75' <br /> Point Load Location <br />Re actions:Supp. #1 Supp. #2 <br />Down (D+Lr+L/Max. Load Comb.)2589/2589 2177/2177 <br />Up (D+Lr+L/Max. Load Comb.)0/0 0/0 <br />vG23.06.30 <br />: <br />: <br />: <br />: <br />Com pany CORE STRUCTURE, INC. <br />Project Tom's Jr <br />Job No.23033 <br />Plan <br />: <br />: <br />: <br />: <br />Designed <br />Checked <br />Date 08/16/2024 <br />Client 0 <br />TIC Structure Design 2023 <br />22 <br />1430 E Edinger Ave <br />3/27/2025