PROJECT NOTES LEGEND AND ABBREVIATIONSPLUMBING SPECIFICATIONS <br />IDENTIFICATION SYMBOLS <br />PART 1 - GENERAL: <br />1.THE CONTRACTOR SHALL FURNISH ALL MATERIAL, LABOR, EQUIPMENT, <br />APPURTENANCES, AND OTHER CONTRACTUAL EXPENSES REQUIRED FOR <br />THE COMPLETE INSTALLATION OF THE PLUMBING WORK TO THE <br />SATISFACTION OF THE OWNER, ENGINEER, AND ARCHITECT. <br />2.ALL ROOF MOUNTED EQUIPMENT WEIGHING OVER 500 LBS REQUIRES <br />BUILDING AND STRUCTURAL PLAN CHECK APPROVAL. VERIFY EQUIPMENT <br />SIZE, LOCATION, WEIGHT, AND ROOF OPENING WITH STRUCTURAL <br />ENGINEER. <br />3.THE PLUMBING WORK SHALL COMPLY WITH AND BE INSTALLED IN <br />ACCORDANCE WITH ALL LEGALLY CONSTITUTED AUTHORITIES AND CODES <br />HAVING JURISDICTION. ALL FIXTURES IN ACCESSIBLE (ADA) RESTROOMS <br />SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE <br />STATE OF CALIFORNIA HANDICAP CODE, FEDERAL AND LOCAL HANDICAP <br />CODES HAVING JURISDICTION. <br />4.THE CONTRACTOR SHALL GUARANTEE ALL EQUIPMENT, APPARATUS, <br />ACCESSORIES (I.E., THE ENTIRE INSTALLATION) AS FURNISHED BY HIM FOR A <br />PERIOD OF ONE YEAR. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY <br />ITEM WHICH MAY PROVE DEFECTIVE WITHIN ONE (1) YEAR FROM THE DATE <br />THE APPARATUS IS ACCEPTED AND PLACED IN OPERATION WITHOUT ANY <br />ADDITIONAL COST TO THE OWNER. <br />5.THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES, <br />AND INSPECTIONS REQUIRED TO COMPLETE THE PLUMBING WORK. <br />6.THE DRAWING INDICATES IN DIAGRAMMATIC FORM ARRANGEMENTS <br />DESIRED FOR PRINCIPAL APPARATUS, PIPING, ETC., AND SHALL BE <br />FOLLOWED AS CLOSELY AS POSSIBLE. SCALED AND FIGURED DIMENSIONS <br />ARE APPROXIMATE AND ARE GIVEN FOR ESTIMATE PURPOSES ONLY. <br />BEFORE PROCEEDING WITH ANY WORK, CHECK AND VERIFY EXISTING <br />CONDITIONS, DIMENSIONS, SIZES AND ASSUME FULL RESPONSIBILITY FOR <br />FITTING-IN OF EQUIPMENT AND MATERIALS, (INCLUDING PROVISION FOR <br />OFFSETS, BENDS, ELBOWS, ETC.). <br />7.BEFORE SUBMITTING BIDS FOR THE WORK, THE CONTRACTOR SHALL MAKE <br />A THOROUGH FIELD SURVEY OF THE WORK TO DETERMINE ANY EXISTING <br />INTERFERENCES THAT MAY AFFECT THE INSTALLATION OF THE WORK. BY <br />THE ACT OF SUBMITTING A BID, THE CONTRACTOR IS DEEMED TO HAVE <br />MADE FIELD SURVEY AND HAS ACCEPTED THE EXISTING CONDITIONS THAT <br />MAY AFFECT HIS WORK. APPOINTMENTS FOR FIELD SURVEY SHALL BE MADE <br />THROUGH THE OWNER. <br />8.SHOP DRAWINGS AND MATERIAL LISTS SHALL BE SUBMITTED TO THE <br />ENGINEER AND OWNER FOR REVIEW AT LEAST THIRTY (30) DAYS PRIOR TO <br />THE START OF ANY WORK. NO WORK INDICATED ON ANY OF THE PLANS OR <br />SHOP DRAWINGS SHALL BE PERFORMED, UNTIL THE SHOP DRAWINGS HAVE <br />BEEN REVIEWED BY THE ENGINEER AND OWNER. <br />9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, TRENCHING, <br />BACKFILLING AND PATCHING TO COMPLETE THE INSTALLATION OF THE <br />PLUMBING WORK. ALL EXPOSED FINISHED AREAS THAT ARE DAMAGED AS A <br />RESULT OF THIS WORK SHALL BE REPAIRED TO MATCH THE EXISTING <br />CONDITIONS AT NO ADDITIONAL COST TO THE OWNER. <br />10.VERIFY SIZES AND LOCATIONS OF ALL OPENINGS OR HOLES, SAWCUT OR <br />CORE DRILLED THROUGH EXISTING BUILDING STRUCTURE WITH <br />STRUCTURAL ENGINEER. THE CONTRACTOR SHALL CONSIDER ALL <br />CONCRETE ROOF OR FLOOR SLABS TO BE PRESTRESSED CONCRETE <br />CONSTRUCTION UNLESS OTHERWISE NOTED. SUCH ROOF OR FLOOR SLABS <br />MAY BE REQUIRED TO BE X-RAYED OR OTHERWISE VERIFIED BY <br />STRUCTURAL ENGINEER BEFORE ANY SAWCUTTING OR CORE DRILLING IS <br />PERFORMED. THE PLUMBING DRAWINGS ONLY INDICATE IN DIAGRAMATIC <br />FORM THE APPROXIMATE SIZE AND LOCATION OF OPENINGS OR HOLES TO <br />BE MADE IN BUILDING STRUCTURE TO PROVIDE FOR EQUIPMENT AND <br />PIPING. THE ACTUAL SIZE AND LOCATION OF OPENINGS OR HOLES TO BE <br />MADE IN BUILDING STRUCTURE SHALL CONFORM TO THE STRUCTURAL <br />ENGINEER'S REQUIREMENTS WITHOUT EXCEPTION. <br />11.ALL CONSTRUCTION SITES SHALL BE PROPERLY PROTECTED WITH <br />BARRICADES, WARNING FLAGS, FENCING, AND LIGHTS AS REQUIRED BY <br />CODE AND THE OWNER'S SECURITY DEPARTMENT. PROVIDE SHORING, <br />BRACING, AND ACCESS LADDERS AS REQUIRED BY CODE. TAKE EXTRA <br />CARE TO INSTRUCT ALL PERSONNEL ON SAFETY PROCEDURES. TAKE CARE <br />TO AVOID DAMAGE TO ADJACENT PIPING AND ELECTRIC SERVICES. <br />12.ALL UTILITY SHUT-DOWNS SHALL BE SCHEDULED AT LEAST TWO (2) DAYS IN <br />ADVANCE THROUGH THE OWNER. PROVIDE CONTINUOUS "FIRE WATCH <br />GUARD" TO ALL AREAS AFFECTED BY SHUT-DOWN OF ANY FIRE PROTECTION <br />WATER SERVICE. THE CONTRACTOR'S OPERATION SHALL CAUSE NO <br />UNNECESSARY INCONVENIENCE TO THE OWNER'S PREMISES. THE ACCESS <br />RIGHTS TO THE PUBLIC SHALL BE CONSIDERED AT ALL TIME <br />13.THE CONTRACTOR SHALL SUBMIT TWO (2) COMPLETE SETS OF AS-BUILT <br />DRAWINGS, AND OPERATIONAL AND MAINTENANCE MANUALS TO THE <br />OWNER AS PERMANENT RECORDS WITHIN THIRTY (30) DAYS OF THE <br />SUCCESSFUL COMPLETION OF THE WORK. <br />1.ALL FIXTURES, EQUIPMENT, PIPING, AND MATERIAL SHALL BE LISTED <br />2.ALL PLUMBING FIXTURES SHALL MEET THE FLOW REQUIREMENTS SPECIFIED <br />IN THE CALIFORNIA PLUMBING CODE. <br />3.ALL FAUCETS IN PUBLIC RESTROOMS SHALL BE SELF-CLOSING OR <br />SELF-CLOSING METERING FAUCET. <br />4.PUBLIC LAVATORIES SHALL HAVE CONTROLS TO LIMIT THE WATER <br />TEMPERATURE TO 105°F. <br />5.WATER PIPE AND FITTING WITH A LEAD CONTENT WHICH EXCEEDS 0.25% <br />SHALL BE PROHIBITED IN SYSTEMS CONVEYING POTABLE WATER. <br />6.REQUEST STRUCTURAL ENGINEER APPROVAL WHEN PIPE PENETRATES <br />THROUGH JOISTS. PRIOR TO ANY WORK. <br />NOTE TO ALL BIDDERS,:THE PROJECT IS NOT READY TO ISSUE (RTI). <br />SOME ITEMS ARE SUBJECT TO CHANGE TO PLANCHECK COMMENTS AND <br />CONTINUING COORDINATION. <br />PIPE INSULATION <br />PLUMBING SCOPE OF WORK <br />PART 2 - EXECUTION: <br />1.PROVIDE PIPE HANGERS TO SUPPORT PIPING. PIPE HANGER CONSTRUCTION, <br />MATERIALS, ATTACHMENT TO THE STRUCTURE, AND OVERALL INSTALLATION <br />SHALL BE IN ACCORDANCE WITH THE PLUMBING CODE, IAPMO, AND SMACNA <br />"GUIDELINES FOR THE RESTRAINT OF MECHANICAL SYSTEMS AND PLUMBING <br />PIPING SYSTEMS". <br />2.FIXTURES AND PIPING SHALL BE INSTALLED TO RUN PARALLEL OR <br />PERPENDICULAR TO THE BUILDING STRUCTURE AND SHALL BE TO FORM NEAT <br />SYMMETRICAL PATTERNS TO ASSURE THE BEST POSSIBLE APPEARANCE. <br />HANGERS ON PARALLEL ADJACENT SERVICE LINES SHALL BE IN LINE WITH <br />EACH OTHER AND PARALLEL TO THE LINES OF THE BUILDING STRUCTURE. <br />ALL PIPING SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE ONLY, NO <br />PIPING SHALL BE SUPPORTED FROM OTHER PIPING OR AIR CONDITIONING <br />DUCTWORK. C-CLAMPS ARE NOT ACCEPTABLE FOR ATTACHING HANGER <br />RODS TO STRUCTURAL STEEL. <br />3.PROVIDE SNAP-OVER-PIPE PIPING IDENTIFICATION MARKERS TO IDENTIFY CW, <br />HW, 140F HW, GAS PIPING BY SETON. WASTE AND VENT, AND DRAIN PIPING <br />IDENTIFICATION IS NOT REQUIRED. SELF ADHESIVE TAPE MARKERS ARE NOT <br />ACCEPTABLE. <br />4.PROVIDE SIGNAGE FOR SAFETY HAZARDS OR EMERGENCY SHUT-OFF VALVES. <br />ALL SIGNAGE SHALL BE IN ACCORDANCE WITH CAL-OSHA, FIRE DEPARTMENT, <br />AND ALL OTHER CODE ENFORCEMENT AGENCIES. SELF ADHESIVE TAPE <br />MARKERS ARE NOT ACCEPTABLE. <br />5.PIPING AND COMPONENTS SHALL BE SPACED SO THAT A THREADED PIPE <br />FITTING MAY BE REMOVED BETWEEN ADJACENT PIPES. NOT LESS THAN <br />1/2-INCH OF CLEAR SPACE SHALL EXIST BETWEEN THE FINISHED SURFACE <br />AND OTHER WORK, AND BETWEEN FINISHED SURFACE OF PARALLEL <br />ADJACENT PIPING. <br />6.PIPE ENDS SHALL BE REAMED BEFORE JOINT CONNECTIONS ARE MADE. <br />SCREWED JOINTS SHALL BE MADE UP WITH TFE JOINT COMPOUND OR TEFLON <br />TAPE. NOT MORE THAN THREE THREADS SHALL SHOW AFTER THE JOINT IS <br />MADE UP. JOINT COMPOUND OR TAPE SHALL BE APPLIED TO THE MALE <br />THREADS ONLY. TAKE CARE TO PREVENT JOINT COMPOUND FROM REACHING <br />THE INTERIOR OF THE PIPE. <br />7.ESCUTCHEONS SHALL BE PROVIDED AT ALL PENETRATIONS INTO FINISHED <br />AREAS. WHERE FINISHED AREAS ARE SEPARATED BY PARTITIONS, <br />ESCUTCHEONS SHALL BE PROVIDED ON BOTH SIDES OF THE PARTITION. FOR <br />INSULATED PIPES, THE ESCUTCHEONS SHALL BE LARGE ENOUGH TO FIT <br />AROUND THE INSULATION.ALL ESCUTCHEONS SHALL BE FIRMLY ANCHORED <br />WITH SETSCREWS. <br />8.ALL HOT WATER PIPING SUBJECT TO EXPANSION AND CONTRACTION BE <br />INSTALLED WITH EXPANSION LOOPS, SWING JOINTS, OR APPROVED METHODS <br />OR DEVICES. BRANCH LINES FROM TO EXPANSION OR CONTRACTION SHALL <br />HAVE A SWING JOINT AT THE CONNECTION TO THE MAIN. ALL LINES SUBJECT <br />TO EXPANSION AND CONTRACTION SHALL BE PROVIDED WITH ANCHORS TO <br />RESTRICT MOVEMENT, EXCEPT IN THE DESIRED DIRECTION. <br />9.TEST ALL HOT AND COLD WATER PIPING HYDROSTATICALLY AT 125 PSI FOR <br />8-HOURS WITH NO LOSS OF PRESSURE. TEST DRAINAGE AND VENT PIPING <br />HYDROSTATICALLY BY TIGHTLY CLOSING ALL OPENINGS AND APPLYING A <br />10-FOOT HEAD OF WATER PRESSURE FOR 2-HOURS, MEASURED AT THE <br />HIGHEST POINT OF THE VENT SYSTEM. RESEAL AND RETEST ALL PIPING <br />SYSTEM UNTIL THEY PASS. <br />10.AT THE COMPLETION OF THE WORK, ALL PARTS OF THE INSTALLATION SHALL <br />BE THOROUGHLY CLEANED. ALL FIXTURES, VALVES, PIPES, AND FITTINGS <br />SHALL BE CLEANED OF GREASE, METAL CUTTINGS, SLUDGE, AND OTHER <br />DEBRIS THAT MAY HAVE ACCUMULATED DURING INSTALLATION. ALL WATER <br />PIPING SHALL BE STERILIZED WITH A SOLUTION OF CHLORINE AND WATER. <br />THE SOLUTION SHALL NOT CONTAIN LESS THAN 50 PARTS PER MILLION OF <br />AVAILABLE CHLORINE. THE SOLUTION SHALL BE HELD FOR NOT LESS THAN <br />8-HOURS. AFTER SUCCESSFUL STERILIZATION, THE SHALL BE REPEATEDLY <br />FLUSHED WITH WATER UNTIL ALL TRACES OF CHLORINE TASTE AND ODOR <br />HAVE BEEN REMOVED. <br />11.AFTER TESTS HAVE BEEN COMPLETED AND SURFACES CLEANED, INSULATION <br />SHALL BE APPLIED ON HOT WATER PIPING, EXCEPT FOR CHROME PLATED <br />BRASS OR OTHER HOT WATER EXPOSED SUPPLIES TO FIXTURES. <br />12.EXPOSED HOT AND DRAIN PIPING BELOW HANDICAPPED LAVATORIES AND <br />SINKS SHALL BE WRAPPED WITH TRUEBRO HANDI LAV-GUARD # 102W OR <br />APPROVED EQUAL. <br />13.VENT THROUGH ROOF SHALL TERMINATE VERTICALLY NOT LESS THAN 1-FOOT <br />FROM ANY VERTICAL SURFACE AND NOT LESS THAN 10-FEET HORIZONTALLY <br />OR AT LEAST 3-FEET ABOVE ANY WINDOW, DOOR, <br />14.ALL PENETRATIONS OF FIRE RATED ASSEMBLES SHALL BE IN CONFORMANCE <br />WITH CBC CHAPTER 7 REQUIREMENTS SUCH THAT THE INTEGRITY OF THE <br />ASSEMBLY IS MAINTAINED FOR FIRE AND ACOUSTICAL RATING. <br />15.ABS AND PVC PIPING EXPOSED TO SUNLIGHT SHALL BE PROTECTED BY <br />WATER-BASED SYNTHETIC LATEX PAINTS. (CPC 906.1) <br />16.SUSPENDED PIPING SHALL BE SUPPORTED AT INTERVALS NOT TO EXCEED <br />THOSE SHOWN IN TABLE 313.3. 2022 CPC SEC.313.3. <br />17.ALL SANITARY WASTE PIPING MUST BE AT LEAST 2% SLOPE. <br />1.PLUMBING FIXTURES SHALL BE AS SCHEDULED ON PLANS. <br />2.PIPING SHALL BE PROVIDED AS FOLLOWS: <br />A.0 WASTE - CAST IRON <br />A.1 UNDER GROUND WASTE - SCHEDULE 40 <br />B. VENT - CAST IRON <br />C. COND.DRAIN - CPVC, SCHEDULE 80 (CORZAN) <br />D.HOT AND COLD WATER ABOVE/BELOW GROUND - COPPER TYPE 'L' <br />E. ESCUTCHEONS SHALL BE CHROME PLATED BRASS OR STAINLESS <br />STEEL. <br />F. WATER ANGLE STOPS SHALL BE CHROME PLATED BRASS BODY <br />WITH NON-REMOVABLE KEY BY BRASS CRAFT. <br />G.GAS - STANDARD WEIGHT SCHEDULE 40 WROUGHT IRON OR STEEL <br />(GALVANIZED OR BLACK) PIPE. <br />A.THE FIRST 5 FEET OF HOT AND COLD WATER PIPES FROM THE WATER <br />HEATER SHALL BE INSULATED WITH APPROVED INSULATION. <br />B.ALL HOT WATER PIPES 3/4" OR LARGER REQUIRES FULL AND <br />CONTINUOUS PIPE INSULATION. SECTION150.0(J)2AI AND SECTION <br />150.0(J)4. <br />C.ALL HOT WATER PIPING BETWEEN THE HEAT SOURCE TO THE KITCHEN <br />FIXTURES. CECSTDS AND CALGREEN. <br />PROVIDE 2" INSULATION ON THE FOLLOWING LOCATIONS (TITLE 24, 120.3): <br />A.RECIRCULATING SYSTEM PIPING, INCLUDING THE SUPPLY AND RETURN <br />PIPING TO THE WATER HEATER. <br />B.THE FIRST 8 FT OF HOT AND COLD OUTLET PPING INCLUDING PIPING <br />BETWEEN A STORAGE TANK AND A HEAT TRAP, FOR A <br />NONRECIRCULATING STORAGE SYSTEM. <br />C.PIPES THAT ARE EXTERNALLY HEATED. <br />HOT WATER PIPING INSULATION LIST: <br />PIPE SIZE, INCHES INSULATION THICKNESS <br />1/2" AND 3/4"1" <br />1" THRU 1-1/2" 1-1/2" <br />2" AND LARGER 2" <br />PIPE MATERIALS <br />SYMBOL ABBREVIATION DESCRIPTION <br />P.O.C.POINT OF CONNECTION <br />CFH <br />VTR <br />DTF <br />DTR <br />UTR <br />OD <br />BOT <br />CONC <br />DN <br />BEL <br />ABV <br />FS <br />FD <br />(N) <br />TDL <br />WHA <br />RI & C <br />WH <br />OPG <br />TYP <br />FU <br />IE <br />GPM <br />CLG <br />BWV <br />CUBIC FEET PER HOUR <br />VENT UP THRU ROOF <br />DOWN THRU FLOOR <br />DOWN THRU ROOF <br />UP THRU ROOF <br />OVERFLOW DRAIN <br />BOTTOM <br />CONCRETE <br />DOWN <br />BELOW <br />ABOVE <br />FLOOR SINK, 1/2 GRATE, 3/4 GRATE <br />FLOOR DRAIN <br />NEW <br />TOTAL DEVELOPED LENGTH <br />WATER HAMMER ARRESTOR <br />ROUGH IN AND CONNECT <br />WATER HEATER <br />OPENING <br />TYPICAL <br />FIXTURE UNIT <br />INVERT ELEVATION <br />GALLONS PER MINUTE <br />CEILING <br />BACKWATER VALVE <br />ED EMERGENCY DRAIN <br />WH <br />- <br />EQUIPMENT TAG <br />EQUIPMENT TAG <br />NUMBER <br />G <br />COLD WATER <br />HOT WATER SUPPLY <br />FILTERED WATER <br />VENT <br />WASTE & STORM DRAIN BELOW FLOOR <br />WASTE & STORM DRAIN ABOVE FLOOR <br />NATURAL GAS <br />SHUT-OFF VALVE <br />BALANCING VALVE <br />CLEAN OUT <br />FLOOR CLEAN OUT <br />WALL CLEAN OUT <br />CAP <br />UNION <br />RELIEF VALVE <br />PIPING ELBOW UP <br />PIPING ELBOW DOWN <br />CHECK VALVE <br />GAS COCK <br />BALL VALVE <br />CW <br />HW <br />FW <br />V <br />W <br />W <br />GAS <br />SOV <br />BV <br />CO <br />FCO <br />WCO <br />F <br />Scale <br />Date <br />Drawn By <br />Checked By <br />Project Number <br />14 <br />3 <br />0 <br /> <br />E <br /> <br />E <br />D <br />I <br />N <br />G <br />E <br />R <br /> <br />A <br />V <br />E <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />NOVUM <br />A R C H I T E C T U R E, Inc <br />www.novumarchitecture.com <br />OFFICES: SOUTH BAY / ORANGE COUNTY <br />116 S CATALINA AVE. STE. 122, <br />REDONDO BEACH, CA 90277 <br />TEL: 310-383-1827 / 310-709-4476 <br />N <br />AS SHOWN <br />TO <br />M <br />' <br />S <br /> <br />J <br />R <br />CAD <br />Author <br />9-01-2023 <br />tom's2023 <br />Mr <br />. <br /> <br />S <br />p <br />i <br />r <br />o <br />s <br /> <br />P <br />o <br />l <br />i <br />t <br />i <br />s <br />No.Description Date <br />1 PC Comments 07/16/2024 <br />2 HlthDep.Corr.2 09/03/2024 <br />3 PC Corr.2 07/01/2025 <br />PLUMBING <br />NOTES & <br />SYMBOLS <br />P-100 <br />COMPLETE PLUMBING SYSTEMS (WASTE/VENT, DOMESTIC COLD/HOT <br />WATER & GAS) FOR A RESTAURANT RENOVATION. <br />PLUMBING SHEET INDEX <br />SHEET#SHEET TITLE ISSUE TAG <br />P-100 PLUMBING NOTES & SYMBOLS PC.CORR.2 <br />P-101 PLUMBING SCHEDULES PC.CORR.2 <br />P-102 PLUMBING SITE PLAN PC.CORR.2 <br />P-103 PLUMBING FLOOR PLAN - WATER & GAS PC.CORR.2 <br />P-104 PLUMBING FLOOR PLAN - WASTE & VENT PC.CORR.2 <br />P-105 PLUMBING RISER DIAGRAM PC.CORR.2 <br />P-106 PLUMBING DETAILS PC.CORR.2 <br />1 <br />1 <br />23 <br />1430 E Edinger Ave <br />3/27/2025