My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1506 1%2 W 7th St - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Seventh St
>
1506 1/2 W Seventh St
>
1506 1%2 W 7th St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:23 AM
Creation date
2/24/2026 5:00:44 AM
Metadata
Fields
Template:
Plan
Permit Number
20185406
101122883
Full Address
1506 1/2 W Seventh St
Street Number
1506
Partial
1/2
Street Direction
W
Street Name
Seventh
Street Suffix
St
Document Relationships
101122883 - Permit
(Permit - Plan)
Path:
\Building\Permits\S\Seventh St\1506 1/2 W Seventh St
20185406 - Permit
(Permit - Plan)
Path:
\Building\Permits\S\Seventh St\1506 1/2 W Seventh St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/ce/ <br />Astra v.2.080 <br />2/14/2025 04:22 PM CAT 1 <br />#AStamp <br />Subject : Structural Certification for Proposed Residential Solar Installation. <br />Job Number: 109R-506COUG; Rev A <br />Client: KEVIN COUGHLIN <br />Address: 1506 W 7th St, Santa Ana, CA 92703 <br />Attn: To Whom It May Concern Signed on: 2/14/2025 <br />A field observation of the existing structure at the address indicated above was performed. Structural evaluation of the loading was based on <br />the site observations and the design criteria listed below. <br />Design Criteria: <br /> • 2022 CRC/CBC/CEBC, 7-16 ASCE & 2018 NDS <br /> • Basic (Category II) Wind Speed V=96 mph, Exposure B <br /> • Ground Snow Load = 0 psf <br />Based on this evaluation, I certify that the alteration to the existing structure by the installation of the PV system meets the requirements of the <br />applicable existing and/or new building code provisions referenced above. <br />Additionally, I certify that the PV module assembly including all attachments supporting it have been reviewed to be in accordance with the <br />manufacturer's specifications. <br />Results Summary (Hardware Check Includes Uplift Check on Attachments/Fastener, Structure Check Considers Main Structure) <br />AR-01 <br />Orientation Attachment Spacing/Cantilever Configuration Max DCR Result <br />Landscape 64 / 25 Stacked 36%Pass <br />Portrait 64 / 25 Stacked 24%Pass <br />Roofing Material Pitch Structure Check <br />Comp Shingle 18°Pass <br />AR-02 <br />Orientation Attachment Spacing/Cantilever Configuration Max DCR Result <br />Landscape 64 / 25 Stacked 36%Pass <br />Portrait 64 / 25 Stacked 24%Pass <br />Roofing Material Pitch Structure Check <br />Comp Shingle 18°Pass <br />225 Bush St. Suite 1400 San Francisco, CA 94104 <br />Exp. 12/31/2026 <br />Digitally Signed On: 02/14/25
The URL can be used to link to this page
Your browser does not support the video tag.