Laserfiche WebLink
Ir <br />ninui <br />Omm <br />I <br />EXISTING 2X STUD WALL T <br />-- EXISTING TO BE REMOVED <br />NEW 2X STUD WALL <br />NOT IN SCOPE <br />nn1 n" <br />10'-4" 11'-8" <br />ol <br />2'-6" 1'-0" 6'-10" <br />1'-0" 6'-8" 1'-0" 2'-11" <br />O. <br />EXISTING <br />CORRIDOR <br />0 0 <br />iz 11 <br />0 <br />I <br />N <br />I <br />> <br />PEN TO <br />BELOW/N. <br />- <br />0 <br />I <br />V__ <br />XISTING CLOSET <br />LO <br />o <br />21 <br />XISTING <br />BEDR00 <br />0 <br />I <br />I <br />I <br />/I <br />� <br />Ln <br />O® E IST6I G J <br />BATHROOM <br />? <br />I <br />— <br />- <br />- o <br />O <br />m <br />I <br />00 <br />CN <br />1)0 <br />Q0 <br />I <br />00 <br />I <br />EXIST!NG rJ <br />00 BEDROOM <br />I <br />_ / <br />� � <br />o <br />I <br />I ! � <br />0 REMAIN <br />12'-7" <br />9'-3" <br />OR DEMOLISHED <br />22'—O" <br />BUILDING-4 ENLARGED 3RD FLOOR <br />DEMOLITION PLAN <br />3/8" = 1'-0" <br />u <br />0 <br />BUILDING-4 ENLARGED 3RD FLOOR <br />PROPOSED PLAN <br />3/8" = 1'-0" <br />A .A. <br />IM oxl%- <br />F 0 R I C <br />r7T <br />EXCEPT THE I,QRD BUILD THE NDUSIE, <br />THEY LABC 14 VAIN TNAT BUILD IT <br />M ter 16"P'MP0hV[,Sol 1E210 <br />CORMN <br />Date: lei. 0 560-1385 coIioeeriopoluHoos,iofo@Imoil.com <br />Drawings and written material appearing herein constitute <br />original and unpublished work of ES Egineering Solutions and <br />may not be duplicated used or disclosed without written <br />consent of ES Engineering Solutions. <br />Q�,OFESSIONq, <br />w George F Endrawes <br />rTi <br />n C9146�5 <br />1 � <br />PROJECT: <br />WATER HEATER AND <br />LAUNDRY RELOCATION <br />PROJECT ADDRESS: <br />1313 N. SPURGEON ST, <br />SAN TA AN A, CA 92701 <br />No. Date Issue <br />1 10/17/2025 REVISION 1 <br />Project No. 282023 <br />scale NOTED <br />Drawing T i t I e:BLD-4 ENLARGED 3RD FLR PLAN <br />DESIGNED BY: G.E. <br />CHECKED BY: <br />DATE: <br />10/17/2025 <br />Drawing No <br />GENERAL NOTES: <br />1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITION AND DIMENSIONS BEFORE ORDERING ANY MATERIALS <br />2. CONTRACTOR SHALL PROVIDE PROPER SHORING BEFORE ANY DEMOLITION <br />3. ALL PLANS ARE USED FOR CITY PERMIT ONLY AND SHALL NOT BE USED FOR CONSTRUCTION UNLESS PERMIT IS ISSUED <br />