GENERAL NOTES <br />GENERAL DEMOLITION NOTES <br />Ir <br />ningpffm� 8u <br />i <br />Omm <br />1. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION WITH AND BETWEEN SUB- <br />CONTRACTORS BASED ON THE COMPLETE SET OF CONSTRUCTION DOCUMENTS. NO <br />ADDITIONAL OR EXTRA COMPENSATION WILL BE AWARDED TO A SUPPLIER THAT HAS BID FROM <br />AND INCOMPLETE SET OF CONSTRUCTION DOCUMENTS. IN CASE OF INCONSISTENCIES AND/OR <br />DISCREPANCIES BETWEEN DOCUMENTS, THE MORE STRINGENT AND/OR DEFINITIVE DESRIPTION, <br />DEPICTION AND/OR INTERPRETATION SHALL APPLY AND THE CONTRACTOR SHALL NOTIFY THE <br />OWNER AND/OR ENGINEER IMMEDIATELY <br />2. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO FIELD VERIFY EXISTING SITE <br />CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. <br />3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A CURRENT SET OF <br />CONSTRUCTION DRAWINGS ON SITE, DURING CONSTRUCTION. THE GENERAL CONTRACTOR <br />SHALL INDICATE ON THESE PLANS, ALL APPROVED CHANGES TO THE WORK AND PROVIDED <br />TO THE PROJECT ENGINEER UPON COMPLETION OF THE PROJECT. <br />4. ANY ERRORS, DISCREPANCIES AND/OR OMISSIONS THAT APPEAR IN THE CONSTRUCTION <br />DRAWINGS, SPECIFICATIONS AND/OR OTHER CONTRACT DOCUMENTS SHALL BE <br />BROUGHT TO THE ATTENTION OF THE PROJECT ENGINEER IMMEDIATELY. <br />5. NO MATERIAL SUBSTITUTIONS WILL BE ALLOWED WITHOUT PRIOR APPROVAL OF THE <br />PROJECT ENGINEER. NOTIFICATION MUST BE SUBMITTED WITHIN TEN (10) WORKING DAYS <br />OF CONTRACT AWARD. <br />6. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEAN-UP OF ALL WORK FOR <br />ALL SUB -CONTRACTORS AND ALL TRADES. <br />7. DO NOT SCALE THESE DRAWINGS. DIMENSIONS AS INDICATED ARE THE DIMENSIONS TO BE USED <br />FOR CONSTRUCTION. DO NOT SCALE THE DRAWINGS. <br />8. THESE DRAWING ARE NOT TO BE ALTERED IN ANY WAY WITHOUT WRITTEN AUTHORIZATION <br />FROM THE PROJECT ENGINEER. NO CHANGES ARE TO BE MADE ON THESE PLANS WITHOUT THE <br />KNOWLEDGE OR CONSENT OF THE ENGINEER. <br />9. UPON COMPLETION OF CONSTRUCTION, IT SHALL BE THE RESPONSIBILITY OF THE GENERAL <br />CONTRACTOR TO CLEAN ALL FINISHED SURFACES AS PER MANUFACTURER'S INSTRUCTIONS AND EMPLOY <br />THE SERVICES OF A PROFESSIONAL CLEANING COMPANY TO ASSURE AN OCCUPYABLE, CUSTOMER <br />READY AND CLEAN SPACE THIS SHALL INCLUDE GLASS, CARPET AND ALL OTHER FINISHED SURFACES IN <br />A MANNER ACCEPTABLE TO THE OWNER. <br />10. THE GENERAL CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING OF ALL EXISTING <br />AND NEW EQUIPMENT, MERCHANDISE, AND FINISHES DURING CONSTRUCTION. <br />11. REFERENCES TO ANY DETAIL OR DRAWING IS FOR CONVENIENCE ONLY AND DOES NOT LIMIT THE <br />APPLICATION OF SUCH DETAIL OR DRAWINGS. <br />12. GENERAL CONTRACTOR TO PROVIDE FIRE EXTINGUISHERS AS REQUIRED. VERIFY QUANTITY AND <br />LOCATION WITH LOCAL OFFICIALS. <br />13. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING, PROVIDING AND <br />INSTALLING ALL BACKING AND SUPPORT FOR ALL LIGHT FIXTURES AS REQUIRED. <br />14. ALL SHOP DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL. <br />SHOP DRAWING CORRECTION AND/OR APPROVALS. <br />15. GENERAL CONTRACTOR SHALL ACQUIRE AS -BUILT DRAWINGS FROM ALL SUBCONTRACTORS <br />UPON COMPLETION OF THE PROJECT AND PROVIDE TO THE PROJECT ENGINEER. <br />16. THE GENERAL CONTRACTOR SHALL MAINTAIN FIVE FOOT CLEAR UNOBSTRUCTED ACCESS TO ANY <br />AND ALL WATER AND POWER DISTRIBUTION FACILITIES (POWER POLES, PULL BOXES, <br />TRANSRORMERS, VAULTS, PUMPS, VALVES, METERS, APPURTENANCES, ETC.); OR TO THE <br />LOCATION OF THE HOOK-UP. <br />17. CONSTRUCTION SHALL CONFORM WITH ALL CURRENT AND/OR APPLICABLE BUILDING CODES, <br />ORDINANCES, REGULATIONS AND ANY ASSOCIATED AMENDMENTS BY THE GOVERNING <br />ENFORCEMENT BODIES. ALL WORK, CONSTRUCTION AND MATERIALS SHALL COMPLY WITH ALL PROVISIONS <br />OF THE BUILDING CODE AND WITH OTHER RULES, REGULATIONS, AND ORDINANCES GOVERNING THE PLACE <br />OF THE CONSTRUCTION. IT IS THE RESPONSIBILITY OF ANYONE SUPPLYING LABOR OR BOTH TO BRING TO <br />THE ATTENTION OF THE ENGINEER AND THE OWNER ANY DISCREPANCIES OR CONFLICT BETWEEN THE <br />REQUIREMENTS OF THE CODE AND THE DRAWINGS. <br />18. DRAWING DETAILS ARE INTENDED TO SHOW METHOD AND MANNER OF ACCOMPLISHING WORK. <br />MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT EXISTING CONDITIONS AND SHALL BE <br />INCLUDED AS PART OF THE WORK. <br />19. VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE PRIOR TO THE COMMENCEMENT OF <br />ANY WORK. <br />20. VERIFY INSTALLATION LOCATIONS, SIZES AND REQUIRED OPENINGS WITH ALL AVAILABLE SHOP <br />DRAWINGS, SPECIFICATIONS, MANUALS AND/OR CUT -SHEETS FOR APPLICABLE PRE - <br />MANUFACTURED ITEMS PRIOR TO COMMENCEMENT OF ANY WORK. <br />21. LATHING, PLASTERING AND GYPSUM BOARD/DRYWALL SHALL CONFORM WITH ANY APPLICABLE <br />CODES, INCLUDING CHAPTER 25 OF THE CBC. GYPSUM BOARD/DRYWALL FASTENERS SHALL BE <br />INSPECTED AND APPROVED BY THE BUILDING OFFICIAL BEFORE JOINTS ARE TAPED. <br />22. EXTERIOR APPLICATION OF DRYWALL BACKING SHALL BE ACCORDING TO MANUFACTURER'S <br />RECOMMENDATION FOR EXPANSION AND CONTRACTION MOVEMENT AND SHALL BE ONLY OF <br />THE TYPE USED IN AN EXTERIOR APPLICATION. <br />23. PAINT ALL GRILLES, VENT SCREEN AND LOUVERS TO MATCH ADJACENT WALL COLOR <br />EXCEPT WHERE OTHERWISE NOTED. <br />24• PROVIDE ALL NECESSARY BACKING AND FRAMING FOR WALL -MOUNTED ITEMS, LIGHT <br />FIXTURES, INTERIOR AND EXTERIOR MALL SIGNAGE AND ALL OTHER ITEMS REQUIRING SAME. <br />25. CONSTRUCT NO TRENCHES OR EXCAVATIONS 5' OR MORE IN DEPTH INTO WHICH A PERSON IS <br />REQUIRED TO DESCEND, OR OBTAIN NECESSARY PERMIT FROM THE STATE OF CALIFORNIA DIVISION OF <br />INDUSTRIAL SAFETY PRIOR TO THE ISSUANCE OF A BUILDING OR GRADING PERMIT. <br />26. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS DIMENSIONS AND EXISTING CONDITIONS, <br />COORDINATE WITH ALL TRADES AND REPORT ANY DISCREPANCIES IN WRITING TO THE <br />ENGINEER PRIOR TO PROCEEDING WITH THE WORK. ANY WORK INSTALLED IN CONFLICT WITH <br />THE ARCHITECTURAL DRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR ENTIRELY AT <br />HIS EXPENSE. <br />27. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY OF ANY OMISSIONS OR <br />DISCREPANCIES BETWEEN THE ARCHITECTURAL DRAWINGS, CONSULTING PROFESSIONAL'S <br />DRAWINGS, SPECIFICATIONS OR EXISTING CONDITIONS. THIS NOTIFICATION SHALL BE MADE TO <br />THE ARCHITECT IN WRITING IMMEDIATELY. <br />28. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF INFORMATION IS NOT SHOWN OR IS <br />UNCLEAR. <br />29. THE EXTENT OF THE WORK IS ONLY INDICATED GENERALLY ON THE DRAWINGS AND SHALL NOT <br />BE CONSIDERED AS THE COMPLETE SCOPE. CONDITIONS INDICATED ARE BASED ON LIMITED <br />SURVEYS OF EXISTING CONDITIONS AND EXISTING DRAWINGS. <br />30. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING UTILITIES, <br />WHETHER SHOWN HEREON OR NOT, AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR <br />SHALL BEAR ALL EXPENSE OF REPAIR OR REPLACEMENT OF UTILITIES OR OTHER PROPERTY <br />DAMAGED BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF THE WORK. <br />31. CONTRACTOR SHALL PROVIDE PEDESTRIAN OR VEHICULAR PROTECTION BARRICADES, WARNING <br />SIGNS, PROTECTIVE DEVICES NECESSARY FOR PEDESTRIAN AND VEHICULAR SAFETY AS <br />REQUIRED BY THE LOCAL AUTHORITIES. <br />32. CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND COORDINATING THE WORK FOR ALL <br />UTILITIES AND SERVICES, <br />33. CONTRACTOR SHALL COORDINATE ALL SLEEVING FOR IRRIGATION LINES AND CONDUITS UNDER <br />SIDEWALKS ETC. PRIOR TO POURING CONCRETE. <br />34. ALL CEILING HEIGHTS SHOWN ON THE FLOOR PLANS AND HEAD HEIGHT DIMENSIONS ARE FROM <br />THE FINISHED FLOOR. <br />35. PENETRATIONS OF FIRE -RESISTIVE WALLS, FLOOR -CEILINGS AND ROOF -CEILINGS SHALL BE <br />PROTECTED AS REQUIRED IN CBC 2022. <br />36. ALL CONSTRUCTION FOR WHICH A PERMIT IS REQUIRED SHALL BE SUBJECT TO INSPECTION BY <br />THE BUILDING OFFICIAL AND ALL SUCH CONSTRUCTION SHALL REMAIN ACCESSIBLE AND EXPOSED <br />FOR INSPECTION PURPOSES UNTIL APPROVED BY THE BUILDING OFFICIAL. REQUIRED <br />INSPECTIONS SHALL INCLUDE BUT NOT LIMITED TO: <br />* FOUNDATION INSPECTION <br />* CONCRETE SLAB OR UNDER -FLOOR INSPECTION <br />* FRAME INSPECTION <br />* LATH OR GYPSUM BOARD INSPECTION <br />* ELECTRICAL INSPECTION <br />* MECHANICAL INSPECTION <br />* PLUMBING INSPECTION <br />* FINAL INSPECTION <br />* INSULATION INSPECTION <br />* DRYWALL INSPECTION <br />* OTHER INSPECTIONS AS REQUIRED BY THE BUILDING OFFICIAL. <br />37. CONTRACTOR TO FOLLOW ALL REQUIREMENTS / INSTRUCTIONS AS LISTED IN THE <br />NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) NOTES. <br />38. THE CONTRACTOR AND SUBCONTRACTORS SHALL PURCHASE AND MAINTAIN CERTIFICATIONS <br />OF INSURANCE WITH RESPECT TO WORKMAN'S COMPENSATION. PUBLIC LIABILITY AND <br />PROPERTY DAMAGE FOR THE LIMITS AS REQUIRED BY LAW. THE GENERAL CONTRACTOR <br />SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING, AND SUPERVISING ALL SAFETY <br />PRECAUTIONS IN CONNECTION WITH THE WORK. OTHER PARTIES. <br />39. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY OF PROJECT AND SHALL BE <br />RESPONSIBLE FOR DISCIPLINE OF ALL WORKERS ON THE PROJECT. <br />40. THE CONTRACTOR SHALL PROVIDE ALL SUPERVISION, ASSISTANCE, AND <br />COORDINATION OF VARIOUS TRADES. <br />41. MATERIALS SHALL BE JOINED TO UNIFORM, ACCURATE FITS, SO THEY MEET WITH NEAT, STRAIGHT <br />LINES, FREE OF SMEARS, OVERLAPS AND IMPERFECTIONS. INSTALL EXPOSED MATERIALS <br />APPROPRIATELY LEVEL, PLUMB AND AT ACCURATE RIGHT ANGLES OR FLUSH WITH ADJOINING <br />MATERIALS. WORK OF EACH TRADE SHALL MEET OR EXCEED ALL NATIONAL STANDARDS <br />PUBLISHED BY THAT TRADE EXCEPT WHERE THE CONTRACT DOCUMENTS ARE MORE STRINGENT; <br />IN SUCH CASES, WORK SHALL MEET OR EXCEED THE STANDARDS ESTABLISHED BY THE <br />CONTRACT DOCUMENTS. <br />42. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DISTRIBUTE ADEQUATE <br />COPIES OF ALL DRAWINGS TO ALL TRADES FALLING UNDER THEIR RESPONSIBILITY AT ALL TIMES <br />DURING THE PROGRESS OF THE JOB INCLUDING REVISIONS. <br />43. UPON COMPLETION OF THE JOB, THE CONTRACTOR SHALL SUBMIT CERTIFICATES OF <br />INSPECTION OR SATISFACTORY COMPLETION. <br />44. THE CONTRACTOR SHALL AT ALL TIMES KEEP PREMISES FREE FROM ACCUMULATION OF DEBRIS <br />CAUSED BY HIS OPERATIONS. <br />45. CONTRACTOR IS RESPONSIBLE FOR DISPOSING OF OFF SITE PACKAGING CARTONS OR <br />CONTAINERS, TRASH, AND DEBRIS IN A SAFE, ACCEPTABLE MANNER, AND AT NO COST OR <br />INCONVENIENCE TO OTHER PARTIES. <br />46. WHERE NO DIMENSION IS SHOWN, PROVIDE AND CONFIRM DIMENSIONS IN WRITING AT THE TIME <br />OF WALL LAYOUT & PRIOR TO ORDERING ANY MATERIALS AND/OR EQUIPMENT DEPENDENT ON <br />SUCH VERIFICATION. <br />47. THE TERM *TYPICAL" OR "TYP" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS <br />THE SAME FROM SIMILAR CONDITIONS, THROUGHOUT UNLESS NOTED OTHERWISE. <br />48. THE CONTRACTOR SHALL COORDINATE WITH THE LOCAL FIRE MARSHAL AND PROVIDE FOR ANY <br />TEMPORARY FIRE -SAFETY REQUIREMENTS. <br />49. THE CONTRACTOR SHALL PROVIDE PROPER PROTECTION FOR ALL CONSTRUCTION MATERIALS <br />SUBJECT TO DAMAGE FROM THE ELEMENTS. <br />50. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE COMPLIANCE WITH LOCAL APPLICABLE CODES <br />WITH RESPECT TO FIRE RATING OF DOORS, FRAMES AND RELATED HARDWARE. NOTIFY THE <br />ENGINEER OF ANY DISCREPANCIES BETWEEN CODES AND CONSTRUCTION DOCUMENTS. <br />51. PROVIDE BACKING AT ALL INDICATED FIXTURE, SIGN, HANDRAILS, AND OTHER WALL AND <br />CEILING -MOUNTED LOCATIONS AS REQUIRED. <br />52. ALL EQUIPMENT AND MATERIALS INDICATED SHALL BE "NEW" UNLESS NOTED OTHERWISE. <br />1. ALL DEMOLITION AND CONSTRUCTION SHALL COMPLY WITH CALIFORNIA FIRE CODE AND THE <br />CALIFORNIA BUILDING CODE 2022. <br />2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY AND ALL PERMITS AND SHALL <br />PAY ALL FEES NECESSARY OF ENCROACHMENT, GRADING, DEMOLITION, AND DISPOSAL OF SAID <br />MATERIALS AS REQUIRED BY PRIVATE, LOCAL AND STATE JURISDICTIONS. <br />3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR A SITE INSPECTION TO FULLY ACKNOWLEDGE <br />THE EXTENT OF THE DEMOLITION WORK. <br />4. THE CONTRACTOR SHALL VERIFY AND LOCATE ALL EXISTING ABOVE AND UNDERGROUND <br />UTILITIES. LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE AND ARE SHOWN FOR GENERAL <br />INFORMATION ONLY. <br />5. CONTRACTOR SHALL COORDINATE WITH UTILITY SURVEYOR PRIOR TO REMOVAL OF ANY <br />UTILITIES. ALL UTILITIES SHALL BE APPROPRIATELY DISCONNECTED PRIOR TO REMOVAL. <br />6. THE CONTRACTOR SHALL NOT ABANDON -IN -PLACE ANY EXISTING UNDERGROUND STRUCTURE, <br />UTILITY OR IMPROVEMENT SO DESIGNATED FOR REMOVAL UNLESS DIRECTED BY THE OWNER OR <br />OWNER'S REPRESENTATIVE. <br />7. DAMAGE TO ANY EXISTING UTILITIES AND SERVICES TO REMAIN SHALL BE THE RESPONSIBILITY OF <br />THE CONTRACTOR. CONTRACTOR SHALL REPAIR AND/OR REPLACE IN KIND. <br />8. EROSION CONTROL MEASURES SHALL BE IMPLEMENTED TO PREVENT DEBRIS AND UNSUITABLE <br />MATERIALS FROM ENTERING STORM, SANITARY SEWERS AND STREETS. <br />9. REMOVAL OF LANDSCAPING SHALL INCLUDE ROOTS AND ORGANIC MATERIALS <br />10. DUST CONTROL SHALL BE IMPLEMENTED DURING DEMOLITION. DUST AND NOISE DURING <br />DEMOLITION & CONSTRUCTION SHALL BE KEPT TO A MINIMUM <br />11. BACK FILL ALL DEPRESSIONS AND TRENCHES FROM DEMOLITION. <br />12. EXCESS WASTE CONCRETE MAY NOT BE WASHED INTO THE PUBLIC WAY OR ANY OTHER <br />DRAINAGE SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN CONCRETE WASTES ON SITE. UNTIL <br />THEY CAN BE DISPOSED OF AS SOLID WASTE. <br />13. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT TRASH AND CONSTRUCTION RELATED <br />SOLID WASTES INCLUDING GREEN WASTES FROM LANDSCAPING AND HAZARDOUS MATERIALS <br />MUST BE DEPOSITED INTO APPROPRIATE RECEPTACLES AND DISPOSED OF. <br />14. CONTRACTOR SHALL BE IN COMPLIANCE WITH THE STORM WATER POLLUTION PREVENTION PLAN <br />DURING ALL DEMOLITION ACTIVITIES. <br />15. CONTRACTOR IS RESPONSIBLE FOR DISPOSING OF OFF SITE PACKAGING CARTONS OR <br />CONTAINERS, TRASH, AND DEBRIS IN A SAFE, ACCEPTABLE MANNER, AND AT NO COST OR <br />INCONVENIENCE TO OTHER PARTIES. <br />16. CONTRACTOR SHALL PROVIDE PROTECTIVE COVERINGS FOR CARPET, FURNISHINGS <br />AND EXISTING FINISHES IN AREAS OF DEMOLITION AND CONSTRUCTION AND SHALL BE <br />RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE CAUSED BY THE WORK OF THE GENERAL <br />CONTRACTOR AND ANY SUBCONTRACTOR. <br />17. THE CONTRACTOR SHALL ERECT ALL NECESSARY TEMPORARY SOUND AND/OR PLASTIC <br />DROP CLOTH PARTITIONS TO PROTECT AREAS TO REMAIN WHILE DEMOLITION AND <br />CONSTRUCTION ARE IN PROGRESS. <br />18. THE CONTRACTOR SHALL BE EXTREMELY CAREFUL TO PROTECT AND NOT TO DAMAGE <br />ANY PORTION OR EXISTING INSTALLATION NOT BEING REMOVED. <br />19. ANY PROJECTING OR SURFACE -MOUNTED ITEMS BEING ABANDONED SHALL BE REMOVED, <br />CAPPED, AND CONCEALED BEHIND FINISHED SURFACES, UNLESS OTHERWISE NOTED. <br />20. IN ALL AREAS WHERE DEMOLITION CAUSES UNEVENNESS OR VOIDS IN FLOOR, THE <br />CONTRACTOR SHALL PATCH TO LEVEL FLOOR WITH EXISTING SLAB AND/OR REQUIRED. <br />SURFACE TO RECEIVE NEW FINISHED FLOOR. <br />21. BRACE, SUPPORT, AND / OR TEMPORARILY SHORE EXISTING WORK, AS REQUIRED, PRIOR TO AND <br />DURING DEMOLITION AND NEW WORK. GENERAL CONTRACTOR SHALL BE SOLELY RESPONSIBLE <br />FOR PROVIDING THE TEMPORARY SHORING AND SHALL OBTAIN ANY NECESSARY GOVERNMENTAL <br />APPROVALS FOR THE TEMPORARY SHORING BEFORE INSTALLATION, EXCAVATION, OR REMOVAL <br />OF EXISTING SUPPORT. <br />22. PIPES AND CONDUIT ENCOUNTERED IN DEMOLISHED PARTITIONS AND AREAS WHICH ARE TO <br />REMAIN IN USE SHALL BE RE-ROUTED AND CONCEALED. THOSE WHICH ARE TO BE ABANDONED <br />SHALL BE CAPPED AND CONCEALED IN FLOOR, WALL OR CEILING. <br />23. ALL EXISTING AREAS TO REMAIN THAT ARE DAMAGED BY DEMOLITION OR NEW CONSTRUCTION <br />WORK SHALL BE PATCHED AS REQUIRED TO MATCH EXISTING ADJACENT AREA IN MATERIAL, <br />FINISH AND COLOR, UNLESS OTHERWISE NOTED. <br />24. CONTRACTOR IS RESPONSIBLE FOR REVIEWING & VERIFYING DEMOLITION PLANS IN <br />RELATION TO EXISTING STRUCTURAL, ARCHITECTURAL, MECHANICAL, AND PLUMBING <br />CONSTRUCTION DRAWINGS. ARCHITECT & THE OWNER ARE TO BE NOTIFIED OF ANY AND ALL <br />CONFLICTS, DISCREPANCIES, OR PROBLEMS PRIOR TO COMMENCEMENT OF WORK. <br />25. ALL EQUIPMENT AND MATERIAL WHICH IS IN OPERATING CONDITION WHEN REMOVED SHALL BE <br />MAINTAINED AS SUCH AND RETURNED TO OWNER AS PER HIS REQUIREMENTS. <br />26. IDENTIFY ALL DAMAGED ELEMENTS DESIGNATED TO REMAIN OR BE RELOCATED. INFORM <br />ARCHITECT OF CONDITION OF SAID ELEMENTS AND RECEIVE CLARIFICATION OF REUSE BEFORE <br />PROCEEDING WITH DEMOLITION WORK. <br />28. SAW CUT AND REMOVE EXISTING SOLID GROUTED CMU AND SLABS AS REQUIRED FOR WORK, <br />WHETHER OR NOT IT IS INDICATED AT EVERY INSTANCE. <br />29. TEMPORARY WALLS ARE NOT TO BE REMOVED UNTIL ALL FINISH WORK IS COMPLETED OR <br />APPROVAL IS GRANTED BY THE CONSTRUCTION MANAGER. <br />30. ANY AND ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE <br />CONSTRUCTION MANAGER <br />31. REMOVAL OF EXISTING ELECTRICAL WORK SHALL INCLUDE CONDUIT, BOXES, WIRE CABLE, <br />SUPPORTS, WIRING DEVICES, SAFETY SWITCHES, FIRE ALARM EQUIPMENT, SPEAKERS, <br />LIGHTING FIXTURES, ETC. <br />32. REMOVAL OF FLOOR TILE AND GROUT BEDS FROM EXISTING FLOOR SHALL INCLUDE <br />PREPARATION FOR NEW CONSTRUCTION <br />33. ALL AREAS TO BE DEMOLISHED OR DISTURBED BY ANY DEMOLITION ARE TO BE PATCHED AND <br />PAINTED (OR PREPARED FOR NEW WALL COVERING) IF PAINTING IS REQUIRED, ENTIRE WALL <br />SHALL RECEIVE PAINT TO AVOID A MISMATCH IN COLOR <br />34. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO EXISTING AREAS THAT ARE IN <br />OPERATION AND SERVED BY THESE UTILITIES AND SERVICES. COORDINATE ALL DISRUPTIONS OR <br />DISCONTINUATIONS OF UTILITIES OR SERVICES WITH CONSTRUCTION MANAGER <br />35. WHERE REMOVAL OF FINISHED CEILING IS REQUIRED, A MINIMUM QUANITY OF LIGHT FIXTURES AND <br />ALL OTHERCEILING EQUIPMENT ARE TO BE REMOVED ONLY WHERE ABSOLUTELY NECESSARY TO <br />COMPLETE DEMOLITION COORDINATE WITH CONSTRUCTION MANAGER <br />36. TEMPORARY BARRICADES AS PERTAINING TO CONTRACTORS ACTIVITIES SHALL BE INSTALLED IN <br />AND AROUND DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE WITH OSHA <br />REQUIREMENTS. COORDINATE WITH CONSTRUCTION MANAGER <br />37. CONTRACTOR SHALL AT ALL TIMES MAINTAIN THE BUILDING IN A WEATHERTIGHT CONDITION <br />38. UTILITIES STUBBED -UP FROM FLOOR AND SLAB ARE TO BE INTERCEPTED AND CAPPED BELOW FLOOR <br />SLAB <br />39. UTILITIES PRESENT OR CROSSING THROUGH ATTIC SPACES (CEILING TO ROOF STRUCTURE) TO BE LEFT INTACT, <br />U.N.O. <br />40. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DEMOLITION PLANS FOR ADDITIONAL DEMOLITION <br />DETAILS NOT SHOWN ON THESE ARCHITECTURAL DRAWINGS, TYP. <br />41. COORDINATE WITH BUILDING CONSTRUCTION DOCUMENTS PACKAGE FOR FOR ACTION. REFER TO <br />SPECIFICATIONS (ASBESTOS ABATEMENT) FOR CLARIFICATIONS AND REQUIREMENTS. <br />42. WHERE REMOVAL OF WALL IS REQUIRED, EXISTING RECEPTACLES AND ASSOCIATED WIRING SHALL BE <br />DISCONNECTED. <br />43. WHERE REMOVAL OF BUILT-IN PLANTERS IS REQUIRED, IT SHALL INCLUDE HANDRAILS, EMBEDS AND <br />FINISH PAVING. INTERCEPT AND CAP ELECTRICAL/PLUMBING SERVING SERVING PLANTERS BELOW SLAB. <br />44. REMOVAL OF GUARDRAILS SHALL INCLUDE FLOOR ANCHOR EMBEDS, GYPSUM BOARD FASCIA AND STUD <br />FRAMING. <br />45. REMOVAL OF TENANT STOREFRONT SHALL INCLUDE REMOVAL OF HEADER, FASCIA AND FRAMING ABOVE. <br />DISCONNECT EXISTING RECEPTACLES AND ASSOCIATED WIRING. WHERE ROLL -UP DOORS OCCUR THEY SHALL <br />REMAIN IN PLACE FOR REMOVAL BY TENANT. <br />46. VENTS, PLUMBING, ELECTRICAL, FIRE PROTECTION, & HVAC SYSTEMS SERVING THE GROUND FLOOR <br />LEVEL OR SECOND FLOOR LEVEL AND NOT SUBJECT TO DEMOLITION SHALL BE MAINTAINED <br />FUNCTIONAL AND PROTECTED IN PLACE OR SHALL BE RE-ROUTED. <br />AoWolv% Aff <br />R I C <br />T <br />EXCEPT THE I,QRD BUILD THE NDUS <br />THEY LABC 14 VAIN TNAT BUILD 17 <br />ter I651 RIMPAU AVE, SolTE 210 <br />CORONA, C A 19 <br />lel. (Hfl560-1385 <br />eolioeeriogsolutioos,info@lmoil.com <br />Drawings and written material appearing herein constitute <br />original and unpublished work of IS Egineering Solutions and <br />may not be duplicated used or disclosed without written <br />consent of IS Engineering Solutions. <br />VOVESSIONq� <br />�61 <br />w George F Endrowes <br />rTi <br />� C914 5 730 <br />1 � <br />PROJECT: <br />WATER HEATER AND <br />LAUNDRY RELOCATION <br />PROJECT ADDRESS: <br />1313 N. SPURGEON ST, <br />SAN TA AN A, CA 92701 <br />No. Date Issue <br />Project No. 282023 <br />scale NOTED <br />Drawing TitIe:GENERAL NOTES <br />DESIGNED BY: G.E. <br />CHECKED BY: <br />DATE: <br />09/02/2025 <br />Drawing No <br />0,, <br />