Laserfiche WebLink
RESTRICTIVE NOTICE <br />DATE REVISIONS <br />SHEET DESCRIPTION <br />PROJECT OWNER <br />PROJECT ADDRESS <br />STAMP <br />NO: <br />REVISIONS <br />DATE SIGNED: 1/27/26 <br />THESE DESIGNS, DRAWINGS, AND <br />SPECIFICATIONS ARE THE EXCLUSIVE <br />PROPERTY OF DONG ENGINEERING. <br />THESE DRAWINGS CANNOT BE COPIED, <br />TRANSFERRED, OR REPRODUCED NOR <br />CAN ANY OTHER STRUCTURES BE BUILT <br />FROM THEM WITHOUT WRITTEN CONSENT. <br />SHEET <br />DE#: <br />TEL- 714-617-5979 <br />GARDEN GROVE, CA 92841 <br />7661 GARDEN GROVE BLVD., <br />DONG ENGINEERING, INC. <br />INFO@DONGENGINEERING.COM <br />250421 <br />AD <br />U <br />34 <br />1 <br />4 <br /> <br />S <br />_ <br />T <br />I <br />M <br />B <br />E <br />R <br /> <br />S <br />T <br />, <br /> <br />U <br />N <br />I <br />T <br /># <br />2 <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />12/31/2025 PLAN CHECK01 <br />01/27/2026 PLAN CHECK02 <br />SD3 <br />STRUCTURAL DETAILS <br />1SEE PLAN FOR HOLDOWN/ STRAP.1SEE PLAN FOR HOLDOWN/ STRAP. <br />1SEE PLAN FOR HOLDOWN/ STRAP.1SEE PLAN FOR HOLDOWN/ STRAP. <br />22 x 4 STUD (U.N.O.) <br />22 x 4 STUD (U.N.O.)22 x 4 STUD (U.N.O.) <br />22 x 4 STUD (U.N.O.) <br />3SHEARWALL PER PLAN.WALL~2 <br />3SHEARWALL PER PLAN.WALL~2 3SHEARWALL PER PLAN.WALL~2 <br />3SHEARWALL PER PLAN.WALL~2 <br />4EDGE NAILING.MISC~3 <br />4EDGE NAILING.MISC~34EDGE NAILING.MISC~3 <br />4EDGE NAILING.MISC~3 <br />4EDGE NAILING.MISC~3 <br />4EDGE NAILING.MISC~3 <br />516d @ 3" O.C. STAGGERED. <br />516d @ 3" O.C. STAGGERED. <br />COND: "A"COND: "C" <br />COND: "B"COND: "D" <br />1. SEE PLAN FOR SHEAR WALL <br />HOLDOWN/ STRAP. <br />2. 2X STUD (U.N.O.) <br />3. SHEARWALL PER PLAN. <br />4. BOUNDARY NAILS. <br />5. 16d @ 3" O.C. STAGGERED. <br />1 <br />SHEARWALL/WALL INTERSECTION <br />℄ PANEL JOINT. <br />3/8" TYP. <br />℄ PANEL JOINT. <br />3/8" TYP. <br />OFFSET EDGE SUPPORT <br />OFFSET EDGE SUPPORT <br />1ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />1ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />2JOIST.32 x 4 W/ 16d @ 12" O.C. <br />42 x 4 FLAT W/ (2) 10d @ EA. END. <br />1. ROOF SHEATHING AND NAILING <br />PER NAILING SCHDL. <br />2. JOIST. <br />3. 2 x 4 W/ 16d @ 12" O.C. <br />4. 2 x 4 FLAT W/ (2) 10d @ EA. END. <br />1 <br />BLOCKING AT EDGE SUPPORT <br />1PANEL BOUNDARY & BOUNDARY NAILING (B.N.) PER PLAN. <br />2FIELD NAILING PER PLAN.3CONTINUOUS PANEL EDGE, NO BLKG', E.N. PER PLAN. <br />1PANEL BOUNDARY & BOUNDARY NAILING (B.N.) PER PLAN. <br />4DISCONTINUOUS PANEL EDGE, E.N. PER PLAN. <br />5FRAMING @ 24" O.C. SHOWN (16" O.C. SIMILAR). <br />6DIRECTION OF FACE GRAIN PERPENDICULAR TO SUPPORT. <br />1. PANEL BOUNDARY & BOUNDARY <br />NAILING (B.N.) PER PLAN. <br />2. FIELD NAILING PER PLAN. <br />3. CONTINUOUS PANEL EDGE, NO <br />BLKG', E.N. PER PLAN. <br />4. DISCONTINUOUS PANEL EDGE, <br />E.N. PER PLAN. <br />5. FRAMING @ 24" O.C. SHOWN (16" <br />O.C. SIMILAR). <br />6. DIRECTION OF FACE GRAIN <br />PERPENDICULAR TO SUPPORT. <br />NOTES: <br />- STAGGER JOINTS AS SHOWN. <br />- MIN. SIZE OF SHEET SHALL BE <br />2 FT. x 2 FT. <br />- NAILS SHALL BE DRIVEN TIGHT <br />BUT SHALL NOT FRACTURE <br />SURFACE OF SHEATHING. <br />- TOLERANCE ON NAILING SHALL BE <br />3/4" W/ THE AVERAGE NAIL <br />SPACING OVER ANY 4 FT. LENGTH <br />BEING AT LEAST THAT NOTED ON <br />THE PLAN. <br />1 <br />PLYWOOD SHEATHING LAYOUT <br />1 <br />TYPICAL HEADER DETAIL <br />1HDR. PER PLAN.WALL~4 <br />2(3) 16d COMMON FROM KING STUD TO HEADER, TYP. <br />3SIMPSON A35 @ T&B EA. END OF HEADER AT ALL EXTERIOR WALLS AT OPENINGS WIDER THAN 8'-0" <br />4SIMPSON LTP4 ALT. TO A35. INSTALL EA. SIDE OF HEADER. <br />5(2) 16d @ 2X4 WALL, (3) 16d @ 2X6 & 2X8 WALL. <br />1. HDR. PER PLAN. <br />2. (3) 16d COMMON FROM KING STUD TO HEADER, TYP. <br />3. SIMPSON A35 @ T&B EA. END OF HEADER AT ALL EXTERIOR <br />WALLS AT OPENINGS WIDER THAN 8'-0" <br />4. SIMPSON LTP4 ALT. TO A35. INSTALL EA. SIDE OF HEADER. <br />5. (2) 16d @ 2X4 WALL, (3) 16d @ 2X6 & 2X8 WALL. <br />1RIDGE PER PLAN.ROOF~15 <br />1RIDGE PER PLAN.ROOF~15 <br />SCALE: <br />FLUSH RIDGE COND. <br />NTS <br />2SIMPSON SLOPABLE FACE MOUNTED HANGER W/ FASTENERS PER MFR. SEE PLAN.H-LSSR26_L_412~ <br />4ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~16SIMPSON COILED STRAP CS16 AROUND W/ 13" END LENGTH @ 32" O.C.MISC~55EDGE NAILING.MISC~3 <br />SCALE: <br />DROP RIDGE COND. <br />NTS <br />32X ROOF RAFTER PER PLAN.ROOF~2 <br />32X ROOF RAFTER PER PLAN.ROOF~2 <br />4ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~15EDGE NAILING.MISC~37LAP AND SPLICE U/ 3-16d @ EA. SIDE 82X FULL DEPTH BLOCKING.W-B2X6~1 <br />1. RIDGE PER PLAN. <br />2. SIMPSON "LUS" HANGER PER <br />PLAN. <br />3. 2X ROOF RAFTER PER PLAN. <br />4. ROOF SHEATHING AND <br />NAILING PER NAILING SCHDL. <br />5. BOUNDARY NAILS. <br />6. SIMPSON COILED STRAP CS16 <br />W/ 11" END LENGTH @ 32" O.C. <br />7. LAP AND SPLICE W/ 3-16d @ <br />EA. SIDE. <br />8. 2X FULL DEPTH BLOCKING. <br />1 <br />CONNECTION DETAIL <br />1RIDGE PER PLAN.ROOF~1522X ROOF RAFTER PER PLAN.ROOF~2 <br />3ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />4A35 @ EA. RAFTER <br />5SIMPSON STRAP LSTA30 @ 32" O.C.6EDGE NAILING.MISC~3 <br />1. RIDGE PER PLAN. <br />2. 2X ROOF RAFTER PER PLAN. <br />3. ROOF SHEATHING AND NAILING PER NAILING SCHDL. <br />4. A35 @ EA. RAFTER <br />5. SIMPSON STRAP LSTA30 @ 32" O.C. <br />6. EDGE NAILING. <br />1 <br />CONNECTION DETAIL <br />1BM. PER PLAN CONT. OVER INTERMEDIATE POST. <br />1BM. PER PLAN CONT. OVER INTERMEDIATE POST. <br />1BM. PER PLAN CONT. OVER INTERMEDIATE POST. <br />2POST PER PLAN.WALL~32POST PER PLAN.WALL~3 <br />2POST PER PLAN.WALL~32POST PER PLAN.WALL~3 <br />2POST PER PLAN.WALL~3 <br />3LTP4 ON TOP OF CORNER BEAMS. <br />41/2" DIA. LAG SCREW W/ 4" EMBED. INTO POST OR W/ 7" EMBED. FOR INVERT.41/2" DIA. LAG SCREW W/ 4" EMBED. INTO POST OR W/ 7" EMBED. FOR INVERT. <br />41/2" DIA. LAG SCREW W/ 4" EMBED. INTO POST OR W/ 7" EMBED. FOR INVERT. <br />41/2" DIA. LAG SCREW W/ 4" EMBED. INTO POST OR W/ 7" EMBED. FOR INVERT. <br />5BM. PER PLAN, MITER CUT @ CORNER POST. <br />5BM. PER PLAN, MITER CUT @ CORNER POST. <br />41/2" DIA. LAG SCREW W/ 4" EMBED. INTO POST OR W/ 7" EMBED. FOR INVERT. <br />6ALT. METHOD USE "PC", "BC" OR "AC" CONNECTOR, BM. CAN BE SPLICED ON POST.7ALT. METHOD USE "EPC", "BC" OR "LCE" @ CORNER CONDITION. <br />8RETURN BM. IF OCCURS. WILL NEED "W" TOP FLANGED HANGER OFFSET @ "EPC" & "BC". MAYBE MITER CUT W/ "LCE" ON EA. BM AS ALT. <br />1. BM. PER PLAN CONT. OVER <br />INTERMEDIATE POST. <br />2. POST PER PLAN. <br />3. LTP4 ON TOP OF CORNER BEAMS. <br />4. 1/2" DIA. LAG SCREW W/ 4" EMBED. INTO <br />POST OR W/ 7" EMBED. FOR INVERT. <br />5. BM. PER PLAN, MITER CUT @ CORNER POST. <br />6. ALT. METHOD USE "PC", "BC" OR "AC" <br />CONNECTOR, BM. CAN BE SPLICED ON POST. <br />7. ALT. METHOD USE "EPC", "BC" OR "LCE" @ <br />CORNER CONDITION. <br />8. RETURN BM. IF OCCURS. WILL NEED "W" TOP <br />FLANGED HANGER OFFSET @ "EPC" & "BC". <br />MAYBE MITER CUT W/ "LCE" ON EA. BM AS ALT. <br />1 <br />BEAM TO STANDALONE POST <br />1 <br />SHEAR TRANSFER <br />12X ROOF RAFTER PER PLAN.Roof~2 <br />2ROOF SHEATHING AND NAILING PER NAILING SCHDL.Roof~1 <br />32X STUD WALL PER PLAN.Wall~1 <br />32X STUD WALL PER PLAN.Wall~1 <br />42X CEILING JOIST PER PLAN.Roof~3 <br />52X SOLE PLATE W/ 16d @ 6" O.C. U.N.O., SEE NAILING PER SHEARWALL SCHDL.W-2X4_R~1 <br />6SIMPSON HURRICANE CLIP H2.5A @ EA. TRUSS TO TOP PLATE.A-H2.5A_L~ <br />7FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_L~4 <br />92X FULL DEPTH BLOCKING.W-B2X8~1 <br />10BOUNDARY NAILS.N-10d~ <br />112X BEVELED BLK'G.Roof~4 <br />1. 2X ROOF RAFTER PER PLAN. <br />2. ROOF SHEATHING AND <br />NAILING PER NAILING SCHDL. <br />3. 2X STUD WALL PER PLAN. <br />4. 2X CEILING JOIST PER PLAN. <br />5. 2X SOLE PLATE W/ 16d <br />@ 6" O.C. U.N.O., SEE NAILING <br />PER SHEARWALL SCHDL. <br />6. SIMPSON H2.5A @ EA. <br />RAFTER TO TOP PLATE. <br />7. FRAMING CLIP LTP4 PER SW. <br />SCHDL. @ 48" O.C. MAX. <br />8. 2X SUBFASCIA <br />W/ 2-10d TO EA. R.R. <br />9. 2X6 BLK'G. <br />10. BOUNDARY NAILS. <br />11. 2X BEVELED BLK'G. <br />12. DBL. TOP PLATE OR DROP <br />BM. PER PLAN.12DBL. TOP PLATE OR DROP BM. PER PLAN.WALL~6 <br />72X BEVELED BLK'G.Roof~4 <br />82X BEVELED BLK'G.Roof~4 <br />1RIDGE BEAM PER PLAN. <br />3CONT. POST PER PLAN.4DBL. TOP PLATE.W-22X4~4DBL. TOP PLATE.W-22X4~ <br />3CONT. POST PER PLAN.5SIMPSON STRAP "CS16".A <br />A <br />SECTION A-A <br />2SIMPSON APPROVED COLUMN CAP PER PLAN.CC-ECCQ~1 <br />1. RIDGE BEAM PER PLAN. <br />2. SIMPSON "ECCQ" COLUMN CAP. <br />3. 4X4 MIN. CONT. KING POST. <br />4. DBL. TOP PLATE OR DROP BEAM PER PLAN. <br />5. SIMPSON STRAP "CS16" W/ 11" MIN. END LENGTH AT EA. TOP PLATE. <br />1 <br />CONNECTION DETAIL <br />12X ROOF RAFTER PER PLAN.Roof~2 <br />2ROOF SHEATHING AND NAILING PER NAILING SCHDL.Roof~1 <br />32X STUD WALL PER PLAN.Wall~1 <br />32X STUD WALL PER PLAN.Wall~1 <br />42X CEILING JOIST PER PLAN.Roof~3 <br />52X SOLE PLATE W/ 16d @ 6" O.C. U.N.O., SEE NAILING PER SHEARWALL SCHDL.W-2X4_R~1 <br />6SIMPSON HURRICANE CLIP H2.5A @ EA. TRUSS TO TOP PLATE.A-H2.5A_L~ <br />7FRAMING CLIP A35 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-A35_L~1 <br />92X FULL DEPTH BLOCKING.W-B2X8~1 <br />10BOUNDARY NAILS.N-10d~ <br />112X BEVELED BLK'G.Roof~4 <br />12DBL. TOP PLATE OR DROP BM. PER PLAN.WALL~6 <br />13SHEARWALL PER PLAN.WALL~2 <br />10CONT. PLYWOOD. <br />1. 2X ROOF RAFTER PER PLAN. <br />2. ROOF SHEATHING AND NAILING <br />PER NAILING SCHDL. <br />3. 2X STUD WALL PER PLAN. <br />4. 2X CEILING JOIST PER PLAN. <br />5. 2X SOLE PLATE W/ 16d @ 6" O.C. <br />U.N.O., SEE NAILING <br />PER SHEARWALL SCHDL. <br />6. SIMPSON HURRICANE CLIP H2.5A <br />@ EA. RAFTER TO TOP PLATE. <br />7. FRAMING CLIP A35 PER <br />SHEARWALL SCHDL. @ 48" O.C. MAX. <br />9. 2X BLOCKING. <br />10. BOUNDARY NAILS. <br />11. 2X BEVELED BLK'G. <br />12. DBL. TOP PLATE OR <br />DROP BM. PER PLAN. <br />13. SHEARWALL PER PLAN. <br />1 <br />SHEAR TRANSFER <br />1RIDGE BEAM PER PLAN. <br />3CONT. POST PER PLAN.4DBL. TOP PLATE.W-22X4~ <br />4DBL. TOP PLATE.W-22X4~ <br />3CONT. POST PER PLAN.5SIMPSON STRAP "CS16". <br />A <br />A <br />SECTION A-A <br />2SIMPSON APPROVED COLUMN CAP PER PLAN.CC-ECCQ~1 <br />1. RIDGE BEAM PER PLAN. <br />2. SIMPSON "ECCQ" COLUMN CAP. <br />3. 4X4 MIN. F.H. POST. <br />4. DBL. TOP PLATE OR DROP BEAM PER PLAN. <br />5. SIMPSON STRAP "CS16" W/ 11" MIN. END LENGTH AT EA. TOP PLATE. <br />6. CEILING BEAM PER PLAN. <br />7. SIMPSON HUC HANGER TO F.H. POST. <br />1 <br />CONNECTION DETAIL <br />6SIMPSON APPROVED COLUMN CAP PER PLAN.CC-ECCQ~1 <br />7DBL. TOP PLATE.W-22X4~ <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />22X CEILING JOIST PER PLAN.ROOF~3 <br />32X BEVELED BLK'G.ROOF~4 <br />4DBL. TOP PLATE.W-22X4~ <br />52X STUD WALL PER PLAN.WALL~1 6SHEARWALL PER PLAN.WALL~2 <br />6SHEARWALL PER PLAN.WALL~2 <br />4DBL. TOP PLATE.W-22X4~ <br />52X STUD WALL PER PLAN.WALL~1 <br />8FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />8FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 92X BLK'G @ 48" O.C. <br />10ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />11BOUNDARY NAILS.N-8d~ <br />11BOUNDARY NAILS.N-8d~72X SOLE PLATE W/ 16d @ 6" O.C. U.N.O., SEE NAILING PER SHEARWALL SCHDL.W-2X4_R~1 <br />1. 2X ROOF RAFTER PER PLAN. <br />2. 2X CEILING JOIST PER PLAN. <br />3. 2X BEVELED BLK'G. <br />4. DBL. TOP PLATE. <br />5. 2X STUD WALL PER PLAN. <br />6. SHEARWALL PER PLAN. <br />7. 2X SOLE PLATE W/ 16d <br />@ 6" O.C. U.N.O., SEE NAILING <br />PER SHEARWALL SCHDL. <br />8. FRAMING CLIP LTP4 PER <br />SHEARWALL SCHDL. <br />@ 48" O.C. MAX. <br />9. 2X BLK'G @ 48" O.C. <br />10. ROOF SHEATHING AND <br />NAILING PER NAILING SCHDL. <br />11. BOUNDARY NAILS. <br />1 <br />SHEAR TRANSFER <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />22X CEILING JOIST PER PLAN.ROOF~3 22X CEILING JOIST PER PLAN.ROOF~3 <br />3ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />4CEILING BEAM PER PLAN.ROOF~14 5SIMPSON APPROVED HANGER PER PLAN.H-HU46_L~1 <br />6DBL. TOP PLATE.W-22X4~7FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />8SHEARWALL PER PLAN.WALL~2 <br />92X SOLE PLATE W/ 16d @ 6" O.C. U.N.O., SEE NAILING PER SHEARWALL SCHDL.WALL~5 <br />10BOUNDARY NAILS.N-10d~ <br />10BOUNDARY NAILS.N-10d~ <br />10BOUNDARY NAILS.N-10d~ <br />112X BEVELED BLK'G.ROOF~4 <br />12ROOF SHEATHING W/ CALIFORNIA FRAMING.ROOF~8 <br />1. 2X ROOF RAFTER PER PLAN. <br />2. 2X CEILING JOIST PER PLAN. <br />3. ROOF SHEATHING AND <br />NAILING PER NAILING SCHDL. <br />4. CEILING BEAM PER PLAN. <br />5. SIMPSON APPROVED <br />HANGER PER PLAN. <br />6. DBL. TOP PLATE OVER <br />2X4 @ 16" O.C. STUD WALL. <br />7. FRAMING CLIP LTP4 PER <br />SHEARWALL SCHDL. <br />@ 48" O.C. MAX. <br />8. PLYWOOD TYPE "A". <br />9. 2X SOLE PLATE W/ 16d @ 6" <br />O.C. U.N.O., SEE NAILING PER <br />SHEARWALL SCHDL. <br />10. BOUNDARY NAILS. <br />11. 2X BEVELED BLK'G. <br />W/ 2-16d @ 6" O.C. TO BM. <br />12. ROOF SHEATHING <br />W/ 2X R.R. PER CALIFORNIA <br />FRAMING. <br />3ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />1 <br />SHEAR TRANSFER <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />22X CEILING JOIST PER PLAN.W-2X6~2 <br />32X FULL DEPTH BLK'G @ 48" O.C. BETWEEN RIM & 1ST JOIST. BOUNDARY NAILS TO BLK'G. <br />4DBL. TOP PLATE.W-22X4~ <br />52X STUD WALL PER PLAN.WALL~1 11SHEARWALL PER PLAN.WALL~2 <br />72X SOLE PLATE W/ 16d @ 6" O.C. U.N.O., SEE NAILING PER SHEARWALL SCHDL.WALL~5 <br />8FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />6SHEARWALL PER PLAN.WALL~252X STUD WALL PER PLAN.WALL~1 <br />4DBL. TOP PLATE.W-22X4~8FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />9ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />1. 2X ROOF RAFTER PER PLAN. <br />2. 2X CEILING JOIST PER PLAN. <br />3. 2X FULL DEPTH BLK'G @ 48" <br />O.C. BETWEEN RIM & 1ST <br />JOIST. BOUNDARY NAILS TO <br />BLK'G. <br />4. DBL. TOP PLATE OR DROP <br />BM. PER PLAN. <br />5. 2X STUD WALL PER PLAN. <br />6. SHEARWALL PER PLAN. <br />7. 2X SOLE PLATE W/ 16d @ 6" <br />O.C. U.N.O., SEE NAILING PER <br />SHEARWALL SCHDL. <br />8. FRAMING CLIP LTP4 PER <br />SHEARWALL SCHDL. <br />@ 48" O.C. MAX. <br />9. ROOF SHEATHING AND <br />NAILING PER NAILING SCHDL. <br />10. BOUNDARY NAILS. <br />11. CONT. PLYWOOD SAME <br />TYPE AS SHEARWALL BELOW. <br />10BOUNDARY NAILS.N-10d~ <br />1 <br />SHEAR TRANSFER <br />STRAP <br />21 <br />22 <br />CS16 <br />(2)CS16 <br />END LENGTH <br />3'-6" <br />3'-6" <br />CAPACITY <br />1700# <br />NAILS/ SPACING <br />8d BOX/ SINKER @ 2-1/16" O.C. <br />3400#8d BOX/ SINKER @ 2-1/16" O.C. <br />5DBL. TOP PLATE OR DROP BM. PER PLAN.WALL~6 <br />END LENGTHEND LENGTH <br />3SIMPSON STRAP CS16 W/ 8d SINKER NAIL @ 2-1/16" O.C. CUT TO FIT OVERALL BAYS OF BLK'G WHERE APPLICABLE.1TYPICAL ROOF RAFTER OR TOP CHORD OF TRUSS. <br />22X FLAT BLK'G W/ E.N., SEE PLAN FOR BLK'G LENGTH OR NO. OF BAYS. (MIN. 4 BAYS).4ROOF SHEATHING AND NAILING PER NAILING SCHDL. <br />1. TYPICAL ROOF RAFTER. <br />2. 2X FLAT BLK'G W/ E.N., SEE PLAN <br />FOR BLK'G LENGTH OR NO. OF <br />BAYS. (MIN. 4 BAYS). <br />3. SIMPSON STRAP CS16 W/ 8d <br />SINKER NAIL @ 2-1/16" O.C. CUT TO <br />FIT OVERALL BAYS OF BLK'G <br />WHERE APPLICABLE. <br />4. ROOF SHEATHING AND NAILING <br />PER NAILING SCHDL. <br />5. DBL. TOP PLATE OR DROP BM. <br />PER PLAN. <br />NOTE: <br />- USE DBL. BLOCKING OR 2X FLAT <br />BLOCKING FOR MARK 22 <br />21 <br />1 <br />DRAG DETAIL <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />22X CEILING JOIST PER PLAN.ROOF~322X CEILING JOIST PER PLAN.ROOF~3 <br />3DBL. TOP PLATE.W-22X4~ <br />42X SOLE PLATE W/ 16d @ 6" O.C. U.N.O., SEE NAILING PER SHEARWALL SCHDL.WALL~5 <br />3DBL. TOP PLATE.W-22X4~ <br />52X STUD WALL PER PLAN.WALL~16SHEARWALL PER PLAN.WALL~2 <br />7ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />7ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />8ROOF SHEATHING W/ CALIFORNIA FRAMING.ROOF~8 <br />6SHEARWALL PER PLAN.WALL~2 <br />9BOUNDARY NAILS.N-10d~ <br />10FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />10FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~19BOUNDARY NAILS.N-10d~ <br />9BOUNDARY NAILS.N-10d~ <br />1. 2X ROOF RAFTER PER PLAN. <br />2. 2X CEILING JOIST PER PLAN. <br />3. DBL. TOP PLATE OR DROP <br />BM. PER PLAN. <br />4. 2X SOLE PLATE W/ 16d <br />@ 6" O.C. U.N.O., SEE NAILING <br />PER SHEARWALL SCHDL. <br />5. 2X STUD WALL PER PLAN. <br />6. SHEARWALL PER PLAN. <br />7. ROOF SHEATHING AND <br />NAILING PER NAILING SCHDL. <br />8. ROOF SHEATHING <br />W/ 2X R.R. PER CALIFORNIA <br />FRAMING. <br />9. BOUNDARY NAILS. <br />10. FRAMING CLIP LTP4/ A35 <br />PER SHEARWALL SCHDL. <br />@ 48" O.C. MAX. <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />1 <br />SHEAR TRANSFER <br />12X ROOF RAFTER PER PLAN.ROOF~2 2DBL. TOP PLATE.W-22X4~12X ROOF RAFTER PER PLAN.ROOF~2 <br />32X CEILING JOIST PER PLAN.ROOF~3 32X CEILING JOIST PER PLAN.ROOF~3 <br />42X BLK'G @ 4'-0" O.C. <br />52X SOLE PLATE W/ 16d @ 6" O.C. U.N.O., SEE NAILING PER SHEARWALL SCHDL.WALL~5 <br />2DBL. TOP PLATE.W-22X4~ <br />62X LEDGER W/ 2-16d @ 6" O.C. TO 2X BLK'G.MISC~2 <br />7FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />8ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />8ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />10BOUNDARY NAILS.N-8d~ <br />10BOUNDARY NAILS.N-8d~ <br />11SHEARWALL PER PLAN.WALL~2 <br />1. 2X ROOF RAFTER PER PLAN. <br />2. DBL. TOP PLATE OR DROP <br />BM. PER PLAN. <br />3. 2X CEILING JOIST PER PLAN. <br />4. 2X BLK'G @ 4'-0" O.C. <br />5. 2X SOLE PLATE W/ 16d <br />@ 6" O.C. U.N.O., SEE NAILING <br />PER SHEARWALL SCHDL. <br />6. 2X MEMBER W/ 2-16d <br />@ EA. STUD. <br />7. FRAMING CLIP A35 PER <br />SHEARWALL SCHDL. <br />@ 48" O.C. MAX. <br />8. ROOF SHEATHING AND <br />NAILING PER NAILING SCHDL. <br />9. FRAMING CLIP @ ALT. <br />LOCATION. <br />10. BOUNDARY NAILS. <br />11. SHEARWALL PER PLAN. <br />12. 2X STUD WALL PER PLAN. <br />13. PLYWOOD SAME TYPE AS <br />SHEARWALL BELOW. <br />14. SIMPSON HURRICANE CLIP <br />H8 @ 48" O.C. <br />10BOUNDARY NAILS.N-8d~ <br />122X STUD WALL PER PLAN.WALL~1 <br />122X STUD WALL PER PLAN.WALL~1 <br />10BOUNDARY NAILS.N-8d~ <br />10BOUNDARY NAILS.N-8d~ <br />7FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />9BOUNDARY NAILS.N-8d~ <br />13FLOOR SHEATHING AND NAILING PER NAILING SCHDL.FLOOR~1 <br />1 <br />SHEAR TRANSFER <br />14SIMPSON HURRICANE CLIP H8 @ 48" O.C.A-H8_L~ <br />1 <br />1 <br />SHEAR TRANSFER <br />12SIMPSON HURRICANE CLIP H8 @ 48" O.C.A-H8_L~ <br />12X ROOF RAFTER PER PLAN.ROOF~2 <br />2DBL. TOP PLATE.W-22X4~12X ROOF RAFTER PER PLAN.ROOF~2 <br />32X CEILING JOIST PER PLAN.ROOF~3 <br />42X BLK'G @ 4'-0" O.C. <br />52X SOLE PLATE W/ 16d @ 6" O.C. U.N.O., SEE NAILING PER SHEARWALL SCHDL.WALL~5 <br />2DBL. TOP PLATE.W-22X4~ <br />62X LEDGER W/ 2-16d @ 6" O.C. TO 2X BLK'G.MISC~2 <br />7FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />7FRAMING CLIP LTP4 PER SHEARWALL SCHDL. @ 48" O.C. MAX.A-LTP4_BEND~1 <br />8ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~1 <br />8ROOF SHEATHING AND NAILING PER NAILING SCHDL.ROOF~192X LEDGER W/ 2-16d @ 6" O.C. TO 2X BLK'G.MISC~2 <br />10BOUNDARY NAILS.N-8d~ <br />10BOUNDARY NAILS.N-8d~ <br />10BOUNDARY NAILS.N-8d~ <br />11SHEARWALL PER PLAN.WALL~2 <br />1. 2X ROOF RAFTER PER PLAN. <br />2. TOP PLATE OR DROP BM. <br />PER PLAN. <br />3. 2X CEILING JOIST PER PLAN. <br />4. 2X BLK'G @ 4'-0" O.C. <br />5. 2X SOLE PLATE W/ 16d @ 6" <br />O.C. U.N.O., SEE NAILING PER <br />SHEARWALL SCHDL. <br />6. 2X LEDGER W/ 2-16d @ 6" <br />O.C. TO 2X BLK'G. <br />7. FRAMING CLIP LTP4 PER <br />SHEARWALL SCHDL. @ 48" <br />O.C. MAX. <br />8. ROOF SHEATHING AND <br />NAILING PER NAILING SCHDL. <br />9. 2X LEDGER W/ 2-16d @ 6" <br />O.C. TO 2X BLK'G. <br />10. BOUNDARY NAILS. <br />11. SHEARWALL PER PLAN. <br />12. SIMPSON HURRICANE CLIP <br />H8 @ 48" O.C. <br />1