My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3414 S Timber St & Unit #2 - Plan
PBA
>
Building
>
ProjectDox
>
T
>
Timber St
>
3414 S Timber St Unit# 2
>
3414 S Timber St & Unit #2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:34 AM
Creation date
2/24/2026 10:50:24 AM
Metadata
Fields
Template:
Plan
Permit Number
101125316
Full Address
3414 S Timber St Unit# 2
Street Number
3414
Street Direction
S
Street Name
Timber
Street Suffix
St
Unit Number
2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dong Engineering Inc. <br />ADU <br />3414 S_TIMBER ST, SANTA ANA, CA 92707 <br />Job#: 250421 <br />Date: 9/17/2025 <br />PLAN: 1 <br />CODE: CBC 2022 <br />Shear Wall (X-X Direction) <br />Line Story Section Span Wind Seismic Added V (lb)H L v Type <br />###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf) <br />A 1 1X 18 100 78 8 8 113 A <br />B 1 1X 38.5 100 78 8 9 214 A <br />C 1 1X 20.5 100 78 8 13 79 A <br />v(plf) = V/L <br />Shear wall design concept is chosen as Individual full-height wall segment (Sec. 4.3.2.1 ) and Force-Transfer Around <br />Openings (FTAO) (Sec. 4.3.2.2 ). <br />For mix-type, chosen concept is determined by more critical design result. <br />V2 = Seismic*Span/2 + Added Vseismic <br />Line shear V = Maximum(V1;V2) <br />V1 = Wind*Span/2 + Added Vwind <br />SUMMARY SHEAR WALL <br />17 of 32
The URL can be used to link to this page
Your browser does not support the video tag.