Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br />3rd & Broadway, Santa Ana, CA <br />Volume 2 - Structural Calculations June 17, 2024 | Project # S21043.00 <br /> pg. 24 <br />Table 4.2-2: Wall Thickness and Concrete Strength – Hotel Building <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Figure 4.2-23: – Hotel building Shear Wall Plan <br /> <br /> <br />Level Specified Concrete <br />Strength (28-day) <br />Core wall <br />(Gird line H03) Core wall <br />L01 – Roof 8,000 psi 24 in 20 in <br /> <br />Level Specified Concrete <br />Strength (28-day) Shear Wall -Y05 <br /> L01 – L03 8,000 psi 18in <br /> <br />Level Specified Concrete <br />Strength (28-day) Shear Wall -X05 <br /> L01 – L10 8,000 psi 18in <br />