Laserfiche WebLink
Planning and Building Age <br />1. ALL GRADING SHALL COMPLY WITH 2O10 CBC CHAPTERS 18 AND 33, AND <br />APPENDIX JAND THE SANTA ANA MUNICIPAL CODE. A CITY GRADING <br />PERMIT IS REQUIRED FOR GRADING. <br />2. GRADING SHALL NOT BE STARTED WITHOUT FIRST NOTIFYING THE CITY <br />GRADING INSPECTOR. A PRE -GRADING MEETING ON THE SITE IS REQUIRED <br />BEFORE STARTING OF GRADING WITH THE FOLLOWING PEOPLE PRESENT: <br />GRADING CONTRACTOR, DESIGN CIVIL ENGINEER, GEOTECHNICAL <br />ENGINEER, GRADING INSPECTOR AND WHEN REQ UIRED, THE <br />ARCHAEOLOGISTAND PALEONTOLOGIST. THE REQUIRED INSPECTIONS <br />FOR GRADING WILL BE EXPLAINED AT THIS MEETING. <br />3. ANAPPROVED COPY OF THE GRADING PLANS SHALL BE ON THE PERMITTED <br />SITE WHILE WORK IS IN PROGRESS. <br />4. THE DESIGN CIVIL ENGINEER SHALL BE AVAILABLE DURING THE GRADING TO <br />VERIFY COMPLIANCE WITH THE PLANS, SPECIFICATIONS, CODE AND ANY <br />SPECIAL CONDITIONS OF THE PERMIT WITHIN HIS P URVIE W. <br />5. THE GEOTECHNICAL ENGINEER SHALL PERFORMPERIODIC INSPECTIONS <br />AND SUBMIT A COMPLETE REPORT AND MAP UPON COMPLETION OF THE <br />ROUGH GRADING. THE COMPACTIONREPORTAND APPROVAL FROM THE <br />GEOTECHNICAL ENGINEER SHALL INDICATE THE TYPE OF FIELD TESTING <br />PERFORMED. EACH TEST SHALL BE IDENTIFIED WITH THE METHOD OF <br />OBTAINING THE IN -PLACE DENSITY, WHETHER SAND CONE OR DRIVE RING <br />AND SHALL BE SO NOTED FOR EACH TEST. SUFFICIENT MAMMUMDENSITY <br />DETERMINATIONS SHALL BE PERFORMED TO VERIFY THE ACCURACY OF <br />THE MAMMUMDENSITY CURVES BY THE FIELD TECHNICIANN, <br />6. CUT AND FILL SLOPES SHALL BE NO STEEPER THAN 2 FOOT HORIZONTAL TO I <br />FOOT VERTICAL (2:1) EXCEPT WHERE SPECIFICALLYAPPROVED <br />OTHERWISE. <br />7. FILLS SHALL BE COMPACTED THROUGHOUT TO A MINIMUM OF 90% <br />RELATIVE DENSITY. AGGREGATE BASE FOR ASPHALTIC AREAS SHALL BE <br />COMPACTED TO MINIMUMOF 95% RELATIVE DENSITY. MAMMUMDENSITY <br />SHALL BE DETERMINED BY UNIFORMBUILDING CODE STANDARD NO. 70-1 <br />OR APPROVED EQUIVALENT, AND FIELD DENSITY BY UNIFORM CODE <br />STANDARD NO. 70-2 OR APPROVED EQUIVALENT. <br />8. THE CONTRACTOR SHALL NOT CREATE ANY TRENCH OR EXCAVATION 5-FEET <br />OR MORE WITHOUT THE NE CESSAR Y PERMIT FROMTHE STATE OF <br />CALIFORNLA DIVISION OF IND USTRLAL SAFETY. <br />9. ALL CUT SLOPED SHALL BE INVESTIGATED BOTH DURING AND AFTER <br />GRADING BY THE GEOTECHNICAL ENGINEER TO DETERMINE IF ANY SLOPE <br />STABILITYPROBLEMEXISTS SHOULD EXCAVATIONDISCLOSE ANY <br />GEOLOGICAL HAZARDS OR POTENTIAL GEOLOGICAL HAZARDS, THE <br />GEOTECHNICAL ENGINEER SHALL SUBMIT RECOMMENDED TREATMENT TO <br />THE CITY ENGINEER FOR APPROVAL. <br />10. THE PERMITEE IS RESPONSIBLE FOR DUST CONTROL MEASURES. WATER <br />ACTIVE SITES AT LEAST TWICE DAILY <br />11. THE LOCATING AND PROTECTION OF ALL EXISTING UTILITIES IS THE <br />RESPONSIBILITY OF THE PERMITTEE. <br />12. GRADING OPERATIONS INCLUDING MAINTENANCE OF EQUIPMENT WITHIN <br />ONE-HALF MILE OF HUMAN OCCUPANCY SHALL NOT BE CONDUCTED <br />BETWEEN THE HOURS OF 5: 00 P.M. AND 7: 00 A.M. <br />13. THE PERMITTEE SHALL GIVE REASONABLE NOTICE TO THE OWNER OF <br />ADJOINING LANDS AND BUILDINGS PRIOR TO BEGINNING EXCAVATIONS <br />WHICH MAYAFFECT THE LATERAL AND SUBJACENT SUPPORT OF THE <br />ADJOINING PROPERTY. THE NOTICE SHALL STATE THE INTENDED DEPTH <br />OF EXCAVATIONAND WHEN EXCAVATION COMMENCES. THE ADJOINING <br />OWNER SHALL BE ALLOWED AT LEAST 30 DAYS AND REASONABLE ACCESS <br />ON THE PERMITTED PROPERTY TO PROTECT HIS STRUCTURE, IF HE SO <br />DESIRES, UNLESS OTHERWISE PROTECTED BYLAW. <br />14. ALL EXISTING DRAINAGE COURSES THROUGH THE SITE SHALL REMAIN <br />OPEN TO HANDLE THE STORM WATER; HOWEVER, INANY CASE, THE <br />PERMITTEE SHALL BE HELD LIABLE FOR ANY DAMAGE DUE TO <br />OBSTRUCTING NATURAL DRAINAGE PATTERNS. <br />15. APPROVED EROSIONPROTECTIONDEVICES SHALL BE PROVIDED AND <br />MAINTAINED DURING THE RAINY SEASONAND SHALL BE INPLACE AT THE <br />END OF EACH DAYS WORK. PROPER EROSION CONTROL MEASURES MUST <br />BE SHOWN ON THE PLANS. <br />16. CONSTRUCTION SITES SHALL BE MAINTAINED INSUCH A CONDITION THAT <br />ANANTICIPATED STORMDOES NOT CARRY WASTES OR POLLUTANTS OFF <br />THE SITES. <br />DISCHARGES OF MATERIAL OTHER THAN STORM WATER ARE ALLOWED ONLY <br />WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF <br />CONSTRUCTION PRACTICES AND WHERE THEY DO NOT. CAUSE OR <br />CONTRIBUTE TO A VIOLATION OFANY WATER QUALITY STANDARD; CAUSE <br />OR THREATEN TO CA USE POLLUTION, CONTAMINATION, OR NUISANCE, OR <br />CONTAINA HAZARDOUS SUBSTANCE INA QUANTITYREPORTABLE UNDER <br />FEDERAL REGULATIONS 40 CFR 117AND 302. <br />POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR <br />LIQUID CHEMICAL SPILLS, • WASTES FROMPAINTS, STAINS, SEALANTS, GLUES, <br />LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVESAND SOLVENTS, <br />ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, <br />LUBRICANTS, AND HYDRAULIC RADIATOR OR BATTERYFLUIDS; <br />FERTILIZERS, VEHICLES/EQUIPMENT WASH WATER AND CONCRETE WASH <br />WATER; CONCRETE, DETERGENT OR FLOATABLE WASTES, WASTES FROM <br />ANYENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING; <br />AND SUPERCHLORINATED POTABLE WATERLINE FL USHINGS. <br />DURING CONSTRUCTION, DISPOSAL OF SUCH MATERIALS SHOULD OCCUR INA <br />SPECIFIED AND CONTROLLED TEMPORARYAREA ON -SITE, PHYSICALLY <br />SEPARATED FROMPOTENTIAL STORM WATER RUN-OFF, WITH ULTIMATE <br />DISPOSAL INACCORDANCE WITH LOCAL, STATE, AND FEDERAL <br />REQUIREMENTS. <br />17. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING <br />CONTAMINATED SOILS VIA SURFACE EROSIONIS PROHIBITED. DEWATERING <br />OFNON-CONTAMINATED GROUNDWATER REQUIRESA NATIONAL <br />POLLUTANT DISCHARGE ELIMINATION SYSTEMPERMIT FROMTHE <br />RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD. <br />18. ALL DIRT, SAND, MUD, OR DEBRIS DEPOSITED OR SPILLED UPON PUBLIC <br />STREETS DURING ANY GRADING, HAULING, OR EXPORT OPERATIONS SHALL <br />BE IMMEDIATELY CLEANED UP BY THE DEVELOPER, HIS CONTRACTOR, <br />SUBCONTRACTORS, OR AGENTS TO THE SATISFACTION OF THE CITY <br />ENGINEER. FAIL URE TO DO SO WILL BE CAUSE FOR STOPPING ALL SUCH <br />GRADING, HA ULING, OR EXPORT WORK BY THE CITY UNTIL SUCH TIME AS <br />THE STREETS ARE CLEANED. <br />19. ALL TRUCKS HAULING DIRT, SAND, OIL, OR OTHER LOOSE MATERIALS ARE <br />TO BE COVERED OR SHOULD MAINTAIN LEAST TWO FEET OF FREEBOARD <br />IN ACCORDANCE WITH THE REQ UIREMENTS OF CVC SECTION 23114. <br />20. CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF ALL DAMAGES TO <br />PUBLIC PROPERTIES THATARE CAUSED BY THE WORK ON -SITE. REPAIR <br />MUST BE COMPLETED TO THE SATISFACTION OF THE CITY ENGINEER. <br />21. MINIMUMASPHALT PAVEMENT SECTION SHALL BE: <br />COMMERCIAL AND INDUSTRIAL: <br />PARKING STALLS = 3"A.C. OVER 6"A.B <br />DRIVEAISLES = 3"A.C. OVER 10"A.B. <br />MULTI -FAMILY <br />PARKING STALLS = 3"A.C. OVER 4"A.B. <br />DRIVEAISLES = 3"A.C. OVER 8"A.B. <br />OR PER THE GEOTECHNICAL REPORT WHEN THICKER SECTION IS REQUIRED. <br />22. EAR THWORK VOL UMES: <br />CUT: 5CUBIC YARDS <br />FILL: 35CUBIC YARDS <br />NET.• 30CUBIC YARDS <br />SUBMIT HAUL ROUTES FOR APPROVAL IF NET VOLUMES EXCEED 500 CUBIC <br />YARDS. <br />23. SEPARATE PERMITS MUST BE OBTAINED FROMTHE CITYBUILDING AND <br />SAFETY DIVISION FOR THE CONSTRUCTION OF RETAINING WALLS, LIGHT <br />POLES, TRASHENCLOSURES, ON -SITE PLUMBING AND ALL BUILDING <br />STRUCTURES. <br />ESTIMATE OF EARTHWORK Q UANTITIES: <br />CUT=OCY FILL=2CY. <br />OVER EXCAVATION = 25 C.Y. <br />ACREAGE = 0.17ACRE <br />Underground Service Alert <br />PRIVATE ENGINEER'S NOTICE TO CONTRACTORS <br />THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITYPIPES OR STRUCTURES SHOWN ON THIS PLANARE OBTAINED BYA SEARCH <br />OR AVAILABLE RECORDS TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE <br />CONTRA CTOR IS REQUIRED TO TAKE DUE PRECA UTIONAR Y MEASURES TO PROTECT THE UTILITIES SHO WNAND ANY OTHER LINES OR <br />STRUCTURES NOT SHOWN ON THESE PLANS. <br />ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK SHO WN ON OR RELATED TO THESE PLANS SHALL CONDUCT THEIR <br />OPERATIONS SO THATALL EMPLOYEESARE PROVIDED A SAFE PLACE TO WORKAND THE PUBLIC IS PROTECTED. ALL CONTRACTORS AND <br />SUBCONTRACTORS SHALL COMPLY WITH THE "OCCUPATIONAL SAFETYAND HEALTH REGULATION" OF THE U.S. DEPARTMENT OF LABOR, <br />AND WITH THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS' "CONSTRUCTION SAFETY ORDERS." <br />CONTRACTOR FURTHER AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RE- SPONSIBILITY FOR JOB SITE CONDITIONS D URING THE <br />COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OFALL PERSONS AND PROPERTY, • THAT THIS REQUIRE- MENT SHALL <br />APPLY CONTINUO USL Y AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFYAND <br />HOLD THE OWNER AND THE ENGINEER HARMLESS FROMANYAND ALL LIABILITY, REAL OR ALLEGED, IN CONNEC- TION WITH THE <br />PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITYARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE <br />ENGINEER. <br />IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE THE STAKES BEFORE COMMENCING THE OPERATIONS. SHOULD OCCASION <br />ARISE WHERE THE VALIDITY OF STAKE IS QUESTIONABLE, EITHER AS TO ITS LOCATION OR THE OFFSET MARKED THEREON, OR AS TO THE <br />ELEVATION OF CUT OR FILL MARKED THEREON. CONTRACTOR SHALL NOTIFY THE ENGINEER WHO WILL CHECK THE STAKE OR STAKES IN <br />QUESTION. ANY STAKES FOUND TO BE IN ERROR WILL BE RESET WITHOUT CHARGE. IT IS UNDERSTOOD THAT THE ENGINEER WILL NOT BE <br />CHARGED FOR ANY STANDBY OR "DOWN" TIME AS A RESULT OF SUCH CHECKING AND/OR RESETTING PROCEDURE. THE ENGINEER IS NOT <br />LIABLE FOR ALLEGED ERRORS WHEN STAKES HAVE BEEN DESTROYED AND FIELD NOTES AND RECORDS INDICATE STAKES WERE SET <br />CORRECTLY. <br />EXACTLAYOUTS OFALL HARDSCAPE ELEMENTS MAYNEED TO BE MODIFIED AND SOMEFIELD ADJUSTMENTS MAYBE NECESSARY. THE <br />CONTRACTOR SHALL INCLUDE AS PART OF THE BID, TIME AND LABOR FOR ANY MODIFICATIONS NECESSARY TO IMPLEMENT THE INTENT OF <br />THE DRAWINGS. <br />THE CONTRACTOR IS RESPONIBLE FOR DETERMINING QUANTITIES. THE IMPROVEMENTSAND EARTHWORK QUANTITIES SHOWN HEREON <br />ARE NOT TO BE USED FOR BIDDING OR ESTIMATING. <br />CALIFORNIA COUNCIL OF CIVIL ENGINEER & LAND SURVEYOR <br />CONSTRUCTION CONTRACTOR AGREES THATINACCORDANCE WITH GENERALLYACCEPTED CONSTRUCTIONPRACTICES, CONSTRUCTION <br />CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS D URING THE COURSE OF <br />CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OFALL PERSONS AND PROPERTY, • THAT THIS REQUIREMENT SHALL BE MADE TO <br />APPLY CONTINUOUSLYAND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO <br />DEFEND, INDEMNIFYAND HOLD DESIGN PROFESSIONAL HARMLESS FORMANYAND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION <br />WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITYARISING FROM THE SOLE NEGLIGENCE OF DESIGN <br />PROFESSIONAL. <br />UNAUTHORIZED CHANGES & USES <br />CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR <br />USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS. <br />NOTES: <br />I- ALL CONSTRUCTION WORK WITHIN THE PUBLIC RIGHTOFWAY SHALL BE UNDER SEPERATE PERMIT. <br />2- THE CONTRACTOR SHALL BE FAMILIAR WITH THE PROJECT SOIL REPORT AND ANY SUPPLEMENTS. <br />3- THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING IMPROVEMENTAND EARTHWORK QUANTITIES. THE <br />IMPROVEMENTS AND EARTHWORK QUANTITIES SHOWN HEREONARE NOT TO BE USED FOR BIDDING OR <br />ESTIMATING. <br />4- FOR INFORMATION ONLY, BLOCK WALLS TO BE INSPECTED BY OTHERS UNDER A SEPARATE PERMIT. APPROVAL OF <br />THIS PLANDOES NOT CONSTITUTE APPROVAL OF THE STRUCTURAL INTEGRITY OF BLOCK WALLS. <br />GENERAL NOTES FOR PUBLIC WORKS PERMITTED WORK ON WATER DISTRIBUTIONSYSTEM <br />1. CONSTRUCTIONAND INSTALLATION OFALL WATER MAINSAND APPURTENANCES SHALL BE INACCORDANCE WITH THE CITY <br />OF SANTA ANA STANDARD PLANSAND SPECIFICATIONS. WHERE THE STANDARD PLANSARE SILENT, CONSTRUCTIONAND <br />INSTALLATION OF WATER MAINS AND APPURTENANCES SHALL CONFORM. TO THE AMERICAN WATER WORKS ASSOCIATION <br />(AWWA) SPECIFICATIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTR UCTION, 2012 EDITION. <br />2. CONSTRUCTION OF WATER MAINS AND APPURTENANCES SHALL ONLYBE PERFORMED BYQUALIFIED CONTRACTORS WITHA <br />VALID CALIFORNIA CONTRACTOR A OR C34 LICENSE. <br />3. NO PERSON, OTHER THAN CITY OF SANTA ANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF CALIFORNIA <br />AS A WATER DISTRIBUTION OPERATOR, SHALL BE ALLOWED TO OPERATE THE CITY'S WATER SYSTEM VALVES. <br />4. NO PERSON, OTHER THAN CITY OF SANTA ANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF CALIFORNIA <br />AS A WATER DISTRIBUTION OPERATOR, SHALL SHUT WATER SER VICE OFF TO ANY CUSTOMER. <br />5. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO THE CITYFOR REVIEW AND APPROVAL <br />"DISINFECTION AND FLUSHING PLAN" PER THE CITY OF SANTA ANA DESIGN GUIDELINES AND STANDARD DRAWINGS. <br />6. ALL NEWLY CONSTRUCTED WATER MAINS AND APPURTENANCES SHALL BE DISINFECTED AND TESTED INACCORDANCE WITH <br />AMERICAN WATER WORKS ASSOCIATION STANDARD C600'S, PRIOR TO CONNECTING TO THE CITY'S WATER DISTRIBUTION <br />SYSTEM. DISINFECTION TESTING RESULTS SHALL BE SUBMITTED TO THE WATER RESOURCES DIVISION FOR REVIEW AND <br />APPROVAL PRIOR TO CONNECTING TO THE CITY'S WATER DISTRIBUTION SYSTEM. <br />7. WATER MAINS WILL BE HYDROSTATIC TESTED AT 200 PSI FOR 2 HOURS. NEW WATER MAINS CANNOT BE TESTED AGAINST AN <br />EXISTING VALVE BUT CAN BE TESTED USING A TEST PLATE. <br />8. REQUESTS TO SHUT -DOWN THE WATER DISTRIBUTION SYSTEM FOR TIE-INS OR OTHER PURPOSES SHALL BE COORDINATED <br />WITH THE WATER RESOURCES DIVISION STAFFAT LEAST 2 WEEKS INADVANCE THROUGH THE CITYINSPECTOR. ALL <br />CUSTOMERS AFFECTED BY THE PROPOSED SHUTDOWN SHALL BE NOTIFIED IN WRITING 48 HOURS INADVANCE BY THE <br />CONTRACTOR. <br />9. THE CITY OF SANTA ANA WATER RESOURCES DIVISION CANNOT GUARANTEE A COMPLETE SHUTDOWN OF EXISTING MAINS. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING AND ISOLATION OF CONSTRUCTION FOR TESTING OR ANY <br />OTHER PURPOSES. <br />10. ALL FIRE HYDRANTS WHICHARE OUT OF SERVICE OR NEW FIRE HYDRANTS WHICH HAVE NOT BEENACCEPTED FOR SERVICE <br />SHALL BE COVERED WITHA SACK INDICATING THAT THE HYDRANTS ARE NOT IN SERVICE. <br />11. MAINTAINING WATER SERVICE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR ANY SHUTDOWNLASTING LONGER <br />THANFOUR (4) HOURS. METHOD OF PROVIDING TEMPORARY SERVICE MUSTBE APPROVED BY THE WATER RESOURCES <br />DIVISION. THE WATER SHALL BE SAFE FOR DRINKING INACCORDANCE WITH STATE OF CALIFORNIA WATER RESOURCES <br />CONTROL BOARD (SWRCB) DRINKING WATER PROGRAM (DWP). <br />12. WATER METER WILL NOT BE INSTALLED NOR WATER TURNED ON UNTIL THE BACKFLOW DEVICES REQUIRED FOR THE <br />BUILDING AND IRRIGATION SYSTEMS HAVE BEEN INSTALLED, TESTED, APPROVED, AND SIGNED OFF BY THE CITY. CONTACT <br />WATER RESOURCES DIVISION AT 714 647 3320. <br />13. ALL WATER MAINS SHALL BE AWWA C-900 PVC, DR14 PIPE OR AWWA C-151 DUCTILE IRON PIPE. ALL OTHER PIPE MATERIALS <br />REQUIRE SPECIAL REVIEW AND APPROVAL FROM WATER RESOURCES DIVISION. <br />14. WA TER MAINS SHALL HAVE36" MINIMUM COVERTOFINISHED GRADE .ANYDEVIA TIONFROMTHIS REQUIREMENTREQUIRES <br />APPROVAL FROM THE WATER RESOURCES DIVISION. <br />15. CONTRACTOR TO VERIFYDEPTHAND LOCATION OFALL UTILITIES AND POINTS OF CONNECTION PRIOR TO TRENCHING. <br />16. PRIVA TE WATER APPURTENANCES SUCH AS BACKFL0W PRE VENTERS, FIRE HYDRANTS AND STANDPIPES, AND VAL VES SHALL BE <br />PAINTED AS FOLLOWS: <br />a. DOMESTIC WATER: BL UE <br />b. POTABLE IRRIGATION.- GREEN <br />C. RECYCLED IRRIGATION: PURPLE <br />d. FIRE PROTECTION- OSHA SAFETYRED <br />17. DO NOT CUT OR SNAP CUT OR MILL ASBESTOS CEMENT PIPE. WHERE JOINING EXISTING ASBESTOS CEMENT PIPE, EXPOSE SIX <br />FEET IN EACHDIRECTION, LOOKING FOR THE NEAREST JOINT AND JOIN TO NEW PIPE WITHA PROPERLYDIMENSIONED <br />ADAPTER PER STANDARD PLAN NUMBER 1443. <br />18. DO NOT TAP EXISTING MAINS WITHOUT THE PRESENCE OFA CERTIFIED PUBLIC WORKS INSPECTOR. PRESSURE TEST TAPPING <br />SLEEVE IN THE PRESENCE OF CERTIFIED PUBLIC WORKS INSPECTOR BEFORE TAPPING EXISTING MAIN. <br />19. FINAL ACCEPTANCE WILL NOT OCCUR UNTIL ORIGINAL RECORD DRAWINGS ON MYLAR AND DIGITAL FILE ARE DELIVERED TO <br />AND ACCEPTED BY THE CITY'SINSPECTOR. SHOWALL FIELD CHANGES ONRECORD DRAWINGS. <br />20. TRENCHPLATES SHALL BE FLUSH WITHPAVEMENTAND SHALL BE NON-SKID. <br />21. WHENPUBLIC WATER FACILITIESARE LOCATED ONPRIVATE PROPERTY, EASEMENTDOCUMENTS ARE TO BE SUBMITTED TO <br />CITYFOR APPROVAL PRIOR TO A PERMIT BEING ISSUED. <br />22. ALL RECYCLED WATER PROJECTS REQUIRE REVIEW AND APPROVAL BY THE WATER RESOURCES DIVISION. <br />23. REMOVE FROM THE FIELD UPPER AND LOWER FIRE HYDRANT DRYBARREL AND 24"X 36" IRON VAULT LID COVERSAND <br />DELIVER UNDAMAGED TO THE CITY WATER RESOURCES DIVISION YARD LOCATED AT 215 S CENTER STREET. PRIOR <br />NOTIFICATION OF THE DELIVERYIS REQUIRED AT 714-647-3320. <br />24. WATER MAINFITTINGS SHALL BE FLANGE OR MECHANICAL JOINTS ONLY, NO PUSH-ONJOINT FITTINGSALLOWED. <br />25. CONTRACTOR SHALL NOT REMOVE OR DISPOSE EXISTING WATER METERS. CONTRACTOR SHALL APPLYFOR ANABANDON <br />WATER METER APPLICATION. CONTRACTOR SHALL CONTACT WATER RESOURCES DIVISIONAT 714-647-3320FOR EXISTING <br />METER REMOVALS. <br />26. INSTALLATION OF NEW WATER METER SERVICE CURB STOP SHALL BE DONE AFTER INSTALLATION OF NEW CURB AND GUTTER <br />OR AFTER CONTRACTOR HAS ESTABLISHED THE PROPOSED CURB GRADE BY STAKING OF THE PROPOSED CURB. <br />BENCH MARK <br />1 C-114-70: 84.963 (NAVD88 2005) <br />Call: TOLL FREE MONUMENT IS LOCATED IN THE SOUTHWEST CORNER OF THE <br />INTERSECTION OF NEWHOPE STREET AND WESTMINSTER <br />1-800-422-4133 AVENUE, 125 FT. WESTERLY OF THE CENTERLINE OFNEWHOPE <br />STREET AND 43.5 FT. SOUTHERLY OF THE CENTERLINE OF <br />WESTMINSTER AVENUE. MONUMENT IS SET LEVEL WITH THE <br />SIDEWALK <br />TWO WORKING DAYS BEFORE YOU DIG <br />6.3' <br />6.3' <br />IF= P D=1 H <br />PROPOSED NEW ADU <br />TILY LY NGUYEN <br />4413 W SUNSWEPT AVE, SANTA ANA, CA 92703 <br />25.7' <br />N0029'15 "W - 104.24' PL <br />N0029'15"W - 101.60'PL <br />25.7' <br />72.1' <br />69.6' <br />EROSION CONTROL AND HORIZONTAL CONTROL <br />INDEX TO PROJECT DRAWINGS <br />SHEET NO. <br />DESCRIPTION <br />1 <br />TITLE SHEET, EROSION & HORIZONTAL CONTROL PLAN <br />2 <br />GRADING PLAN, DETAILS AND SECTIONS <br />EROSION CONTROL NOTES <br />ITEM <br />DESCRIPTION <br />1 <br />(SE-6) INSTALL TYPICAL GRAVEL BAG PER DETAIL HEREON <br />2 <br />(WM-8) CONCRETE WASTE MANAGEMENT PER DETAIL HEREON <br />01 <br />(WM-1) MATERIAL DELIVERYAND STORAGE <br />4 <br />(WM-) SANITARY WASTE MANAGEMENT (PORTABLE TOILET) <br />5 <br />INLET PROTECTION PER DETAIL HEREON <br />3"MIN. OPENING BETWEEN <br />BAGS TOP ROW <br />1 SECTION 1-1 <br />R <br />1 <br />TYPICAL GRAVELBAG DETAIL 0 N.T.S. <br />REVISIONS DEVELOPER/OWNER SOILS ENGINEER <br />REV. DATE BY DESCRIPTION APP'V'D <br />TILYLYNGUYEN <br />4413 W SUNSWEPT AVE <br />SANTA ANA, CA 92703 <br />714-867-3349 <br />N/A <br />APPROVED BY: <br />BUILDING DEPT <br />APPROVED BY: <br />PLANNING DEPT. <br />APPROVED BY: <br />Notes: <br />1. Excess and waste concrete shall not be washed into the street or into a drainage system. <br />2. For washout of concrete and mortar products, a designated containment facility of <br />sufficient capacity to retain liquid and solid waste shall be provided on site. <br />3. Slurry from concrete and asphalt saw cutting shall be vacuumed or contained, dried, <br />picked up and disposed ofproperly. <br />CONCRETE WASTE MANAGEMENT <br />N.T.S. <br />LEGAL DESCRIPTION: <br />TRACT 2961, LOT 2, BOOK 115, PAGE 28-29 <br />APN: 198-301-12 <br />PUBLIC WORKS DIRECTOR <br />R.C.E. NO.: EXP. DATE: <br />Q�OF ESS /O <br />LYPHAN ��o py� <br />P.E. �`� I F� <br />RCE 63381 No. C63381 m <br />EXP. 9-30-2026 <br />10082 EMERSONAVE <br />GARDEN GROVE, CA 92843 sT9T C/V � <br />TEL. (714) 548-1233 F of CA��F° <br />EMAILLY10@GMAIL. COM <br />3 <br />FOR PUBLIC SEWER AND WATER FACILITIES ONLY <br />APPROVED BY.• <br />CESAR E. BARRERA, P.E. DATE <br />DEPUTYPUBLIC WORKSDIRECTORI <br />WATER RESOURCES MANAGER <br />DRAWN BY: KN 1 104/2025 <br />DESIGNED BY: LP 04/2025 <br />CHECKED BY: BT 04/2025 <br />PREPARED UNDER THE SUPERVISION OF: <br />R.C.E. NO.: 63381 EXP. DATE; 9/30/2026 <br />S1 <br />WESEWNSTER AYE <br />PROJECT <br />SITE rove <br />wy <br />,FOR <br />W SUNS PPEP <br />m <br />PE IT ISS Wz� <br />AI` <br />ow s <br />W OAKFIEL AVE <br />%IAZARD .Q VE <br />aster 11D. N <br />ate. VICINITY MAP <br />NTS <br />GRAPHIC SCALE <br />10 5 0 10 <br />SCALE IN FEET <br />1 inch = 10 It. <br />SANDBAGS/GRAVEL BAGS <br />PLACED TIGHTLY TOGETHER <br />Notes: ALL AROUND MATERIAL <br />1. Dirt and other construction related materials placed in the street or on other impervious <br />surfaces must be contained with sandbags or other measures to prevent transport to the <br />stormdrain system. <br />2. Any construction material stored or stockpiled on -site shall be protected from being <br />transported by the force of wind or water. <br />MATERIAL STORAGE <br />N.T.S. <br />2 GRAVELBAG HIGH <br />MIN. FOR ALL STORM <br />i DRAININLETS <br />GRA VELBAG AT STORM DRAININLETQ <br />N.T.S. <br />JC <br />TITLE SHEET, EROSION & <br />HORIZONTAL CONTROL PLAN � <br />TILY LY NGUYEN OF <br />4413 W SUNSWEPT AVE <br />2 <br />SANTA ANA, CA 92703 <br />