<br />1. ALL GRADING SHALL COMPLY WITH 2O10 CBC CHAPTERS 18 AND 33, AND
<br />APPENDIX JAND THE SANTA ANA MUNICIPAL CODE. A CITY GRADING
<br />PERMIT IS REQUIRED FOR GRADING.
<br />2. GRADING SHALL NOT BE STARTED WITHOUT FIRST NOTIFYING THE CITY
<br />GRADING INSPECTOR. A PRE -GRADING MEETING ON THE SITE IS REQUIRED
<br />BEFORE STARTING OF GRADING WITH THE FOLLOWING PEOPLE PRESENT:
<br />GRADING CONTRACTOR, DESIGN CIVIL ENGINEER, GEOTECHNICAL
<br />ENGINEER, GRADING INSPECTOR AND WHEN REQ UIRED, THE
<br />ARCHAEOLOGISTAND PALEONTOLOGIST. THE REQUIRED INSPECTIONS
<br />FOR GRADING WILL BE EXPLAINED AT THIS MEETING.
<br />3. ANAPPROVED COPY OF THE GRADING PLANS SHALL BE ON THE PERMITTED
<br />SITE WHILE WORK IS IN PROGRESS.
<br />4. THE DESIGN CIVIL ENGINEER SHALL BE AVAILABLE DURING THE GRADING TO
<br />VERIFY COMPLIANCE WITH THE PLANS, SPECIFICATIONS, CODE AND ANY
<br />SPECIAL CONDITIONS OF THE PERMIT WITHIN HIS P URVIE W.
<br />5. THE GEOTECHNICAL ENGINEER SHALL PERFORMPERIODIC INSPECTIONS
<br />AND SUBMIT A COMPLETE REPORT AND MAP UPON COMPLETION OF THE
<br />ROUGH GRADING. THE COMPACTIONREPORTAND APPROVAL FROM THE
<br />GEOTECHNICAL ENGINEER SHALL INDICATE THE TYPE OF FIELD TESTING
<br />PERFORMED. EACH TEST SHALL BE IDENTIFIED WITH THE METHOD OF
<br />OBTAINING THE IN -PLACE DENSITY, WHETHER SAND CONE OR DRIVE RING
<br />AND SHALL BE SO NOTED FOR EACH TEST. SUFFICIENT MAMMUMDENSITY
<br />DETERMINATIONS SHALL BE PERFORMED TO VERIFY THE ACCURACY OF
<br />THE MAMMUMDENSITY CURVES BY THE FIELD TECHNICIANN,
<br />6. CUT AND FILL SLOPES SHALL BE NO STEEPER THAN 2 FOOT HORIZONTAL TO I
<br />FOOT VERTICAL (2:1) EXCEPT WHERE SPECIFICALLYAPPROVED
<br />OTHERWISE.
<br />7. FILLS SHALL BE COMPACTED THROUGHOUT TO A MINIMUM OF 90%
<br />RELATIVE DENSITY. AGGREGATE BASE FOR ASPHALTIC AREAS SHALL BE
<br />COMPACTED TO MINIMUMOF 95% RELATIVE DENSITY. MAMMUMDENSITY
<br />SHALL BE DETERMINED BY UNIFORMBUILDING CODE STANDARD NO. 70-1
<br />OR APPROVED EQUIVALENT, AND FIELD DENSITY BY UNIFORM CODE
<br />STANDARD NO. 70-2 OR APPROVED EQUIVALENT.
<br />8. THE CONTRACTOR SHALL NOT CREATE ANY TRENCH OR EXCAVATION 5-FEET
<br />OR MORE WITHOUT THE NE CESSAR Y PERMIT FROMTHE STATE OF
<br />CALIFORNLA DIVISION OF IND USTRLAL SAFETY.
<br />9. ALL CUT SLOPED SHALL BE INVESTIGATED BOTH DURING AND AFTER
<br />GRADING BY THE GEOTECHNICAL ENGINEER TO DETERMINE IF ANY SLOPE
<br />STABILITYPROBLEMEXISTS SHOULD EXCAVATIONDISCLOSE ANY
<br />GEOLOGICAL HAZARDS OR POTENTIAL GEOLOGICAL HAZARDS, THE
<br />GEOTECHNICAL ENGINEER SHALL SUBMIT RECOMMENDED TREATMENT TO
<br />THE CITY ENGINEER FOR APPROVAL.
<br />10. THE PERMITEE IS RESPONSIBLE FOR DUST CONTROL MEASURES. WATER
<br />ACTIVE SITES AT LEAST TWICE DAILY
<br />11. THE LOCATING AND PROTECTION OF ALL EXISTING UTILITIES IS THE
<br />RESPONSIBILITY OF THE PERMITTEE.
<br />12. GRADING OPERATIONS INCLUDING MAINTENANCE OF EQUIPMENT WITHIN
<br />ONE-HALF MILE OF HUMAN OCCUPANCY SHALL NOT BE CONDUCTED
<br />BETWEEN THE HOURS OF 5: 00 P.M. AND 7: 00 A.M.
<br />13. THE PERMITTEE SHALL GIVE REASONABLE NOTICE TO THE OWNER OF
<br />ADJOINING LANDS AND BUILDINGS PRIOR TO BEGINNING EXCAVATIONS
<br />WHICH MAYAFFECT THE LATERAL AND SUBJACENT SUPPORT OF THE
<br />ADJOINING PROPERTY. THE NOTICE SHALL STATE THE INTENDED DEPTH
<br />OF EXCAVATIONAND WHEN EXCAVATION COMMENCES. THE ADJOINING
<br />OWNER SHALL BE ALLOWED AT LEAST 30 DAYS AND REASONABLE ACCESS
<br />ON THE PERMITTED PROPERTY TO PROTECT HIS STRUCTURE, IF HE SO
<br />DESIRES, UNLESS OTHERWISE PROTECTED BYLAW.
<br />14. ALL EXISTING DRAINAGE COURSES THROUGH THE SITE SHALL REMAIN
<br />OPEN TO HANDLE THE STORM WATER; HOWEVER, INANY CASE, THE
<br />PERMITTEE SHALL BE HELD LIABLE FOR ANY DAMAGE DUE TO
<br />OBSTRUCTING NATURAL DRAINAGE PATTERNS.
<br />15. APPROVED EROSIONPROTECTIONDEVICES SHALL BE PROVIDED AND
<br />MAINTAINED DURING THE RAINY SEASONAND SHALL BE INPLACE AT THE
<br />END OF EACH DAYS WORK. PROPER EROSION CONTROL MEASURES MUST
<br />BE SHOWN ON THE PLANS.
<br />16. CONSTRUCTION SITES SHALL BE MAINTAINED INSUCH A CONDITION THAT
<br />ANANTICIPATED STORMDOES NOT CARRY WASTES OR POLLUTANTS OFF
<br />THE SITES.
<br />DISCHARGES OF MATERIAL OTHER THAN STORM WATER ARE ALLOWED ONLY
<br />WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF
<br />CONSTRUCTION PRACTICES AND WHERE THEY DO NOT. CAUSE OR
<br />CONTRIBUTE TO A VIOLATION OFANY WATER QUALITY STANDARD; CAUSE
<br />OR THREATEN TO CA USE POLLUTION, CONTAMINATION, OR NUISANCE, OR
<br />CONTAINA HAZARDOUS SUBSTANCE INA QUANTITYREPORTABLE UNDER
<br />FEDERAL REGULATIONS 40 CFR 117AND 302.
<br />POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR
<br />LIQUID CHEMICAL SPILLS, • WASTES FROMPAINTS, STAINS, SEALANTS, GLUES,
<br />LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVESAND SOLVENTS,
<br />ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS,
<br />LUBRICANTS, AND HYDRAULIC RADIATOR OR BATTERYFLUIDS;
<br />FERTILIZERS, VEHICLES/EQUIPMENT WASH WATER AND CONCRETE WASH
<br />WATER; CONCRETE, DETERGENT OR FLOATABLE WASTES, WASTES FROM
<br />ANYENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING;
<br />AND SUPERCHLORINATED POTABLE WATERLINE FL USHINGS.
<br />DURING CONSTRUCTION, DISPOSAL OF SUCH MATERIALS SHOULD OCCUR INA
<br />SPECIFIED AND CONTROLLED TEMPORARYAREA ON -SITE, PHYSICALLY
<br />SEPARATED FROMPOTENTIAL STORM WATER RUN-OFF, WITH ULTIMATE
<br />DISPOSAL INACCORDANCE WITH LOCAL, STATE, AND FEDERAL
<br />REQUIREMENTS.
<br />17. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING
<br />CONTAMINATED SOILS VIA SURFACE EROSIONIS PROHIBITED. DEWATERING
<br />OFNON-CONTAMINATED GROUNDWATER REQUIRESA NATIONAL
<br />POLLUTANT DISCHARGE ELIMINATION SYSTEMPERMIT FROMTHE
<br />RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD.
<br />18. ALL DIRT, SAND, MUD, OR DEBRIS DEPOSITED OR SPILLED UPON PUBLIC
<br />STREETS DURING ANY GRADING, HAULING, OR EXPORT OPERATIONS SHALL
<br />BE IMMEDIATELY CLEANED UP BY THE DEVELOPER, HIS CONTRACTOR,
<br />SUBCONTRACTORS, OR AGENTS TO THE SATISFACTION OF THE CITY
<br />ENGINEER. FAIL URE TO DO SO WILL BE CAUSE FOR STOPPING ALL SUCH
<br />GRADING, HA ULING, OR EXPORT WORK BY THE CITY UNTIL SUCH TIME AS
<br />THE STREETS ARE CLEANED.
<br />19. ALL TRUCKS HAULING DIRT, SAND, OIL, OR OTHER LOOSE MATERIALS ARE
<br />TO BE COVERED OR SHOULD MAINTAIN LEAST TWO FEET OF FREEBOARD
<br />IN ACCORDANCE WITH THE REQ UIREMENTS OF CVC SECTION 23114.
<br />20. CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF ALL DAMAGES TO
<br />PUBLIC PROPERTIES THATARE CAUSED BY THE WORK ON -SITE. REPAIR
<br />MUST BE COMPLETED TO THE SATISFACTION OF THE CITY ENGINEER.
<br />21. MINIMUMASPHALT PAVEMENT SECTION SHALL BE:
<br />COMMERCIAL AND INDUSTRIAL:
<br />PARKING STALLS = 3"A.C. OVER 6"A.B
<br />DRIVEAISLES = 3"A.C. OVER 10"A.B.
<br />MULTI -FAMILY
<br />PARKING STALLS = 3"A.C. OVER 4"A.B.
<br />DRIVEAISLES = 3"A.C. OVER 8"A.B.
<br />OR PER THE GEOTECHNICAL REPORT WHEN THICKER SECTION IS REQUIRED.
<br />22. EAR THWORK VOL UMES:
<br />CUT: 5CUBIC YARDS
<br />FILL: 35CUBIC YARDS
<br />NET.• 30CUBIC YARDS
<br />SUBMIT HAUL ROUTES FOR APPROVAL IF NET VOLUMES EXCEED 500 CUBIC
<br />YARDS.
<br />23. SEPARATE PERMITS MUST BE OBTAINED FROMTHE CITYBUILDING AND
<br />SAFETY DIVISION FOR THE CONSTRUCTION OF RETAINING WALLS, LIGHT
<br />POLES, TRASHENCLOSURES, ON -SITE PLUMBING AND ALL BUILDING
<br />STRUCTURES.
<br />ESTIMATE OF EARTHWORK Q UANTITIES:
<br />CUT=OCY FILL=2CY.
<br />OVER EXCAVATION = 25 C.Y.
<br />ACREAGE = 0.17ACRE
<br />Underground Service Alert
<br />PRIVATE ENGINEER'S NOTICE TO CONTRACTORS
<br />THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITYPIPES OR STRUCTURES SHOWN ON THIS PLANARE OBTAINED BYA SEARCH
<br />OR AVAILABLE RECORDS TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE
<br />CONTRA CTOR IS REQUIRED TO TAKE DUE PRECA UTIONAR Y MEASURES TO PROTECT THE UTILITIES SHO WNAND ANY OTHER LINES OR
<br />STRUCTURES NOT SHOWN ON THESE PLANS.
<br />ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK SHO WN ON OR RELATED TO THESE PLANS SHALL CONDUCT THEIR
<br />OPERATIONS SO THATALL EMPLOYEESARE PROVIDED A SAFE PLACE TO WORKAND THE PUBLIC IS PROTECTED. ALL CONTRACTORS AND
<br />SUBCONTRACTORS SHALL COMPLY WITH THE "OCCUPATIONAL SAFETYAND HEALTH REGULATION" OF THE U.S. DEPARTMENT OF LABOR,
<br />AND WITH THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS' "CONSTRUCTION SAFETY ORDERS."
<br />CONTRACTOR FURTHER AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RE- SPONSIBILITY FOR JOB SITE CONDITIONS D URING THE
<br />COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OFALL PERSONS AND PROPERTY, • THAT THIS REQUIRE- MENT SHALL
<br />APPLY CONTINUO USL Y AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFYAND
<br />HOLD THE OWNER AND THE ENGINEER HARMLESS FROMANYAND ALL LIABILITY, REAL OR ALLEGED, IN CONNEC- TION WITH THE
<br />PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITYARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE
<br />ENGINEER.
<br />IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE THE STAKES BEFORE COMMENCING THE OPERATIONS. SHOULD OCCASION
<br />ARISE WHERE THE VALIDITY OF STAKE IS QUESTIONABLE, EITHER AS TO ITS LOCATION OR THE OFFSET MARKED THEREON, OR AS TO THE
<br />ELEVATION OF CUT OR FILL MARKED THEREON. CONTRACTOR SHALL NOTIFY THE ENGINEER WHO WILL CHECK THE STAKE OR STAKES IN
<br />QUESTION. ANY STAKES FOUND TO BE IN ERROR WILL BE RESET WITHOUT CHARGE. IT IS UNDERSTOOD THAT THE ENGINEER WILL NOT BE
<br />CHARGED FOR ANY STANDBY OR "DOWN" TIME AS A RESULT OF SUCH CHECKING AND/OR RESETTING PROCEDURE. THE ENGINEER IS NOT
<br />LIABLE FOR ALLEGED ERRORS WHEN STAKES HAVE BEEN DESTROYED AND FIELD NOTES AND RECORDS INDICATE STAKES WERE SET
<br />CORRECTLY.
<br />EXACTLAYOUTS OFALL HARDSCAPE ELEMENTS MAYNEED TO BE MODIFIED AND SOMEFIELD ADJUSTMENTS MAYBE NECESSARY. THE
<br />CONTRACTOR SHALL INCLUDE AS PART OF THE BID, TIME AND LABOR FOR ANY MODIFICATIONS NECESSARY TO IMPLEMENT THE INTENT OF
<br />THE DRAWINGS.
<br />THE CONTRACTOR IS RESPONIBLE FOR DETERMINING QUANTITIES. THE IMPROVEMENTSAND EARTHWORK QUANTITIES SHOWN HEREON
<br />ARE NOT TO BE USED FOR BIDDING OR ESTIMATING.
<br />CALIFORNIA COUNCIL OF CIVIL ENGINEER & LAND SURVEYOR
<br />CONSTRUCTION CONTRACTOR AGREES THATINACCORDANCE WITH GENERALLYACCEPTED CONSTRUCTIONPRACTICES, CONSTRUCTION
<br />CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS D URING THE COURSE OF
<br />CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OFALL PERSONS AND PROPERTY, • THAT THIS REQUIREMENT SHALL BE MADE TO
<br />APPLY CONTINUOUSLYAND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO
<br />DEFEND, INDEMNIFYAND HOLD DESIGN PROFESSIONAL HARMLESS FORMANYAND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION
<br />WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITYARISING FROM THE SOLE NEGLIGENCE OF DESIGN
<br />PROFESSIONAL.
<br />UNAUTHORIZED CHANGES & USES
<br />CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR
<br />USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
<br />NOTES:
<br />I- ALL CONSTRUCTION WORK WITHIN THE PUBLIC RIGHTOFWAY SHALL BE UNDER SEPERATE PERMIT.
<br />2- THE CONTRACTOR SHALL BE FAMILIAR WITH THE PROJECT SOIL REPORT AND ANY SUPPLEMENTS.
<br />3- THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING IMPROVEMENTAND EARTHWORK QUANTITIES. THE
<br />IMPROVEMENTS AND EARTHWORK QUANTITIES SHOWN HEREONARE NOT TO BE USED FOR BIDDING OR
<br />ESTIMATING.
<br />4- FOR INFORMATION ONLY, BLOCK WALLS TO BE INSPECTED BY OTHERS UNDER A SEPARATE PERMIT. APPROVAL OF
<br />THIS PLANDOES NOT CONSTITUTE APPROVAL OF THE STRUCTURAL INTEGRITY OF BLOCK WALLS.
<br />GENERAL NOTES FOR PUBLIC WORKS PERMITTED WORK ON WATER DISTRIBUTIONSYSTEM
<br />1. CONSTRUCTIONAND INSTALLATION OFALL WATER MAINSAND APPURTENANCES SHALL BE INACCORDANCE WITH THE CITY
<br />OF SANTA ANA STANDARD PLANSAND SPECIFICATIONS. WHERE THE STANDARD PLANSARE SILENT, CONSTRUCTIONAND
<br />INSTALLATION OF WATER MAINS AND APPURTENANCES SHALL CONFORM. TO THE AMERICAN WATER WORKS ASSOCIATION
<br />(AWWA) SPECIFICATIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTR UCTION, 2012 EDITION.
<br />2. CONSTRUCTION OF WATER MAINS AND APPURTENANCES SHALL ONLYBE PERFORMED BYQUALIFIED CONTRACTORS WITHA
<br />VALID CALIFORNIA CONTRACTOR A OR C34 LICENSE.
<br />3. NO PERSON, OTHER THAN CITY OF SANTA ANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF CALIFORNIA
<br />AS A WATER DISTRIBUTION OPERATOR, SHALL BE ALLOWED TO OPERATE THE CITY'S WATER SYSTEM VALVES.
<br />4. NO PERSON, OTHER THAN CITY OF SANTA ANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF CALIFORNIA
<br />AS A WATER DISTRIBUTION OPERATOR, SHALL SHUT WATER SER VICE OFF TO ANY CUSTOMER.
<br />5. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO THE CITYFOR REVIEW AND APPROVAL
<br />"DISINFECTION AND FLUSHING PLAN" PER THE CITY OF SANTA ANA DESIGN GUIDELINES AND STANDARD DRAWINGS.
<br />6. ALL NEWLY CONSTRUCTED WATER MAINS AND APPURTENANCES SHALL BE DISINFECTED AND TESTED INACCORDANCE WITH
<br />AMERICAN WATER WORKS ASSOCIATION STANDARD C600'S, PRIOR TO CONNECTING TO THE CITY'S WATER DISTRIBUTION
<br />SYSTEM. DISINFECTION TESTING RESULTS SHALL BE SUBMITTED TO THE WATER RESOURCES DIVISION FOR REVIEW AND
<br />APPROVAL PRIOR TO CONNECTING TO THE CITY'S WATER DISTRIBUTION SYSTEM.
<br />7. WATER MAINS WILL BE HYDROSTATIC TESTED AT 200 PSI FOR 2 HOURS. NEW WATER MAINS CANNOT BE TESTED AGAINST AN
<br />EXISTING VALVE BUT CAN BE TESTED USING A TEST PLATE.
<br />8. REQUESTS TO SHUT -DOWN THE WATER DISTRIBUTION SYSTEM FOR TIE-INS OR OTHER PURPOSES SHALL BE COORDINATED
<br />WITH THE WATER RESOURCES DIVISION STAFFAT LEAST 2 WEEKS INADVANCE THROUGH THE CITYINSPECTOR. ALL
<br />CUSTOMERS AFFECTED BY THE PROPOSED SHUTDOWN SHALL BE NOTIFIED IN WRITING 48 HOURS INADVANCE BY THE
<br />CONTRACTOR.
<br />9. THE CITY OF SANTA ANA WATER RESOURCES DIVISION CANNOT GUARANTEE A COMPLETE SHUTDOWN OF EXISTING MAINS.
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING AND ISOLATION OF CONSTRUCTION FOR TESTING OR ANY
<br />OTHER PURPOSES.
<br />10. ALL FIRE HYDRANTS WHICHARE OUT OF SERVICE OR NEW FIRE HYDRANTS WHICH HAVE NOT BEENACCEPTED FOR SERVICE
<br />SHALL BE COVERED WITHA SACK INDICATING THAT THE HYDRANTS ARE NOT IN SERVICE.
<br />11. MAINTAINING WATER SERVICE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR ANY SHUTDOWNLASTING LONGER
<br />THANFOUR (4) HOURS. METHOD OF PROVIDING TEMPORARY SERVICE MUSTBE APPROVED BY THE WATER RESOURCES
<br />DIVISION. THE WATER SHALL BE SAFE FOR DRINKING INACCORDANCE WITH STATE OF CALIFORNIA WATER RESOURCES
<br />CONTROL BOARD (SWRCB) DRINKING WATER PROGRAM (DWP).
<br />12. WATER METER WILL NOT BE INSTALLED NOR WATER TURNED ON UNTIL THE BACKFLOW DEVICES REQUIRED FOR THE
<br />BUILDING AND IRRIGATION SYSTEMS HAVE BEEN INSTALLED, TESTED, APPROVED, AND SIGNED OFF BY THE CITY. CONTACT
<br />WATER RESOURCES DIVISION AT 714 647 3320.
<br />13. ALL WATER MAINS SHALL BE AWWA C-900 PVC, DR14 PIPE OR AWWA C-151 DUCTILE IRON PIPE. ALL OTHER PIPE MATERIALS
<br />REQUIRE SPECIAL REVIEW AND APPROVAL FROM WATER RESOURCES DIVISION.
<br />14. WA TER MAINS SHALL HAVE36" MINIMUM COVERTOFINISHED GRADE .ANYDEVIA TIONFROMTHIS REQUIREMENTREQUIRES
<br />APPROVAL FROM THE WATER RESOURCES DIVISION.
<br />15. CONTRACTOR TO VERIFYDEPTHAND LOCATION OFALL UTILITIES AND POINTS OF CONNECTION PRIOR TO TRENCHING.
<br />16. PRIVA TE WATER APPURTENANCES SUCH AS BACKFL0W PRE VENTERS, FIRE HYDRANTS AND STANDPIPES, AND VAL VES SHALL BE
<br />PAINTED AS FOLLOWS:
<br />a. DOMESTIC WATER: BL UE
<br />b. POTABLE IRRIGATION.- GREEN
<br />C. RECYCLED IRRIGATION: PURPLE
<br />d. FIRE PROTECTION- OSHA SAFETYRED
<br />17. DO NOT CUT OR SNAP CUT OR MILL ASBESTOS CEMENT PIPE. WHERE JOINING EXISTING ASBESTOS CEMENT PIPE, EXPOSE SIX
<br />FEET IN EACHDIRECTION, LOOKING FOR THE NEAREST JOINT AND JOIN TO NEW PIPE WITHA PROPERLYDIMENSIONED
<br />ADAPTER PER STANDARD PLAN NUMBER 1443.
<br />18. DO NOT TAP EXISTING MAINS WITHOUT THE PRESENCE OFA CERTIFIED PUBLIC WORKS INSPECTOR. PRESSURE TEST TAPPING
<br />SLEEVE IN THE PRESENCE OF CERTIFIED PUBLIC WORKS INSPECTOR BEFORE TAPPING EXISTING MAIN.
<br />19. FINAL ACCEPTANCE WILL NOT OCCUR UNTIL ORIGINAL RECORD DRAWINGS ON MYLAR AND DIGITAL FILE ARE DELIVERED TO
<br />AND ACCEPTED BY THE CITY'SINSPECTOR. SHOWALL FIELD CHANGES ONRECORD DRAWINGS.
<br />20. TRENCHPLATES SHALL BE FLUSH WITHPAVEMENTAND SHALL BE NON-SKID.
<br />21. WHENPUBLIC WATER FACILITIESARE LOCATED ONPRIVATE PROPERTY, EASEMENTDOCUMENTS ARE TO BE SUBMITTED TO
<br />CITYFOR APPROVAL PRIOR TO A PERMIT BEING ISSUED.
<br />22. ALL RECYCLED WATER PROJECTS REQUIRE REVIEW AND APPROVAL BY THE WATER RESOURCES DIVISION.
<br />23. REMOVE FROM THE FIELD UPPER AND LOWER FIRE HYDRANT DRYBARREL AND 24"X 36" IRON VAULT LID COVERSAND
<br />DELIVER UNDAMAGED TO THE CITY WATER RESOURCES DIVISION YARD LOCATED AT 215 S CENTER STREET. PRIOR
<br />NOTIFICATION OF THE DELIVERYIS REQUIRED AT 714-647-3320.
<br />24. WATER MAINFITTINGS SHALL BE FLANGE OR MECHANICAL JOINTS ONLY, NO PUSH-ONJOINT FITTINGSALLOWED.
<br />25. CONTRACTOR SHALL NOT REMOVE OR DISPOSE EXISTING WATER METERS. CONTRACTOR SHALL APPLYFOR ANABANDON
<br />WATER METER APPLICATION. CONTRACTOR SHALL CONTACT WATER RESOURCES DIVISIONAT 714-647-3320FOR EXISTING
<br />METER REMOVALS.
<br />26. INSTALLATION OF NEW WATER METER SERVICE CURB STOP SHALL BE DONE AFTER INSTALLATION OF NEW CURB AND GUTTER
<br />OR AFTER CONTRACTOR HAS ESTABLISHED THE PROPOSED CURB GRADE BY STAKING OF THE PROPOSED CURB.
<br />BENCH MARK
<br />1 C-114-70: 84.963 (NAVD88 2005)
<br />Call: TOLL FREE MONUMENT IS LOCATED IN THE SOUTHWEST CORNER OF THE
<br />INTERSECTION OF NEWHOPE STREET AND WESTMINSTER
<br />1-800-422-4133 AVENUE, 125 FT. WESTERLY OF THE CENTERLINE OFNEWHOPE
<br />STREET AND 43.5 FT. SOUTHERLY OF THE CENTERLINE OF
<br />WESTMINSTER AVENUE. MONUMENT IS SET LEVEL WITH THE
<br />SIDEWALK
<br />TWO WORKING DAYS BEFORE YOU DIG
<br />6.3'
<br />6.3'
<br />IF= P D=1 H
<br />PROPOSED NEW ADU
<br />TILY LY NGUYEN
<br />4413 W SUNSWEPT AVE, SANTA ANA, CA 92703
<br />25.7'
<br />N0029'15 "W - 104.24' PL
<br />N0029'15"W - 101.60'PL
<br />25.7'
<br />72.1'
<br />69.6'
<br />EROSION CONTROL AND HORIZONTAL CONTROL
<br />INDEX TO PROJECT DRAWINGS
<br />SHEET NO.
<br />DESCRIPTION
<br />1
<br />TITLE SHEET, EROSION & HORIZONTAL CONTROL PLAN
<br />2
<br />GRADING PLAN, DETAILS AND SECTIONS
<br />EROSION CONTROL NOTES
<br />ITEM
<br />DESCRIPTION
<br />1
<br />(SE-6) INSTALL TYPICAL GRAVEL BAG PER DETAIL HEREON
<br />2
<br />(WM-8) CONCRETE WASTE MANAGEMENT PER DETAIL HEREON
<br />01
<br />(WM-1) MATERIAL DELIVERYAND STORAGE
<br />4
<br />(WM-) SANITARY WASTE MANAGEMENT (PORTABLE TOILET)
<br />5
<br />INLET PROTECTION PER DETAIL HEREON
<br />3"MIN. OPENING BETWEEN
<br />BAGS TOP ROW
<br />1 SECTION 1-1
<br />R
<br />1
<br />TYPICAL GRAVELBAG DETAIL 0 N.T.S.
<br />REVISIONS DEVELOPER/OWNER SOILS ENGINEER
<br />REV. DATE BY DESCRIPTION APP'V'D
<br />TILYLYNGUYEN
<br />4413 W SUNSWEPT AVE
<br />SANTA ANA, CA 92703
<br />714-867-3349
<br />N/A
<br />APPROVED BY:
<br />BUILDING DEPT
<br />APPROVED BY:
<br />PLANNING DEPT.
<br />APPROVED BY:
<br />Notes:
<br />1. Excess and waste concrete shall not be washed into the street or into a drainage system.
<br />2. For washout of concrete and mortar products, a designated containment facility of
<br />sufficient capacity to retain liquid and solid waste shall be provided on site.
<br />3. Slurry from concrete and asphalt saw cutting shall be vacuumed or contained, dried,
<br />picked up and disposed ofproperly.
<br />CONCRETE WASTE MANAGEMENT
<br />N.T.S.
<br />LEGAL DESCRIPTION:
<br />TRACT 2961, LOT 2, BOOK 115, PAGE 28-29
<br />APN: 198-301-12
<br />PUBLIC WORKS DIRECTOR
<br />R.C.E. NO.: EXP. DATE:
<br />Q�OF ESS /O
<br />LYPHAN ��o py�
<br />P.E. �`� I F�
<br />RCE 63381 No. C63381 m
<br />EXP. 9-30-2026
<br />10082 EMERSONAVE
<br />GARDEN GROVE, CA 92843 sT9T C/V �
<br />TEL. (714) 548-1233 F of CA��F°
<br />EMAILLY10@GMAIL. COM
<br />3
<br />FOR PUBLIC SEWER AND WATER FACILITIES ONLY
<br />APPROVED BY.•
<br />CESAR E. BARRERA, P.E. DATE
<br />DEPUTYPUBLIC WORKSDIRECTORI
<br />WATER RESOURCES MANAGER
<br />DRAWN BY: KN 1 104/2025
<br />DESIGNED BY: LP 04/2025
<br />CHECKED BY: BT 04/2025
<br />PREPARED UNDER THE SUPERVISION OF:
<br />R.C.E. NO.: 63381 EXP. DATE; 9/30/2026
<br />S1
<br />WESEWNSTER AYE
<br />PROJECT
<br />SITE rove
<br />wy
<br />,FOR
<br />W SUNS PPEP
<br />m
<br />PE IT ISS Wz�
<br />AI`
<br />ow s
<br />W OAKFIEL AVE
<br />%IAZARD .Q VE
<br />aster 11D. N
<br />ate. VICINITY MAP
<br />NTS
<br />GRAPHIC SCALE
<br />10 5 0 10
<br />SCALE IN FEET
<br />1 inch = 10 It.
<br />SANDBAGS/GRAVEL BAGS
<br />PLACED TIGHTLY TOGETHER
<br />Notes: ALL AROUND MATERIAL
<br />1. Dirt and other construction related materials placed in the street or on other impervious
<br />surfaces must be contained with sandbags or other measures to prevent transport to the
<br />stormdrain system.
<br />2. Any construction material stored or stockpiled on -site shall be protected from being
<br />transported by the force of wind or water.
<br />MATERIAL STORAGE
<br />N.T.S.
<br />2 GRAVELBAG HIGH
<br />MIN. FOR ALL STORM
<br />i DRAININLETS
<br />GRA VELBAG AT STORM DRAININLETQ
<br />N.T.S.
<br />JC
<br />TITLE SHEET, EROSION &
<br />HORIZONTAL CONTROL PLAN �
<br />TILY LY NGUYEN OF
<br />4413 W SUNSWEPT AVE
<br />2
<br />SANTA ANA, CA 92703
<br />
|