Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />SUBSTITUTION PROCEDURES 012500 - 1 <br />SECTION 012500 - SUBSTITUTION PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes administrative and procedural requirements for substitutions. <br />B. Related Requirements: <br />1. Section 016000 "Product Requirements" for requirements for submitting comparable <br />product submittals for products by listed manufacturers. <br />1.3 DEFINITIONS <br />A. Substitutions: Changes in products, materials, equipment, and methods of construction from <br />those required by the Contract Documents and proposed by Contractor. <br />1. Substitutions for Cause: Changes proposed by Contractor that are required due to <br />changed Project conditions, such as unavailability of product, regulatory changes, or <br />unavailability of required warranty terms. <br />2. Substitutions for Convenience: Changes proposed by Contractor that are not required in <br />order to meet other Project requirements but may offer advantage to Contractor. <br />1.4 ACTION SUBMITTALS <br />A. Substitution Requests: Refer to AIA Document A201 in the Supplementary Conditions for <br />consideration of requests received after Contract award. Submit three copies of each request for <br />consideration. Identify product or fabrication or installation method to be replaced. Include <br />Specification Section number and title and Drawing numbers and titles. <br />1. Substitution Request Form: Use facsimile of form provided in Project Manual. <br />2. Documentation: Show compliance with requirements for substitutions and the following, <br />as applicable: <br />a. Statement indicating why specified product or fabrication or installation method <br />cannot be provided, if applicable. <br />b. Coordination of information, including a list of changes or revisions needed to <br />other parts of the Work and to construction performed by Owner and separate <br />contractors that will be necessary to accommodate proposed substitution.