ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />CONTRACT MODIFICATION PROCEDURES 012600 - 1 <br />SECTION 012600 - CONTRACT MODIFICATION PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract (AIA 201), including General and <br />Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes administrative and procedural requirements for handling and processing <br />Contract modifications. <br />B. Related Requirements: <br />1. Section 012500 "Substitution Procedures" for administrative procedures for handling <br />requests for substitutions made after the Contract award. <br />1.3 MINOR CHANGES IN THE WORK <br />A. Architect will issue supplemental instructions authorizing minor changes in the Work, not <br />involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710 and <br />eBuilder. <br />1.4 PROPOSAL REQUESTS <br />A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed <br />changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If <br />necessary, the description will include supplemental or revised Drawings and Specifications. <br />1. Work Change Proposal Requests issued by Architect are not instructions either to stop <br />work in progress or to execute the proposed change. <br />2. Within 10 days after receipt of Proposal Request, submit a quotation estimating cost <br />adjustments to the Contract Sum and the Contract Time necessary to execute the change. <br />a. Include a list of quantities of products required or eliminated and unit costs, with <br />total amount of purchases and credits to be made. If requested, furnish survey data <br />to substantiate quantities. <br />b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br />discounts. <br />c. Include costs of labor and supervision directly attributable to the change. <br />d. Include an updated Contractor's construction schedule that indicates the effect of <br />the change, including, but not limited to, changes in activity duration, start and