Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />SUBMITTAL PROCEDURES 013300 - 1 <br />SECTION 013300 - SUBMITTAL PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />B. AIA Document A201, Section 3.12. <br />1.2 SUMMARY. <br />A. Section Includes: <br />1. Submittal schedule requirements. <br />2. Administrative and procedural requirements for submittals. <br />B. Related Requirements: <br />1. Section 012900 "Payment Procedures" for submitting Applications for Payment and the <br />schedule of values. <br />2. Section 013100 "Project Management and Coordination" for submitting coordination <br />drawings and subcontract list and for requirements for web-based Project software. <br />3. Section 013200 "Construction Progress Documentation" for submitting schedules and <br />reports, including Contractor's construction schedule. <br />4. Section 014000 "Quality Requirements" for submitting test and inspection reports, and <br />schedule of tests and inspections. <br />5. Section 017700 "Closeout Procedures" for submitting closeout submittals and <br />maintenance material submittals. <br />6. Section 017823 "Operation and Maintenance Data" for submitting operation and <br />maintenance manuals. <br />7. Section 017839 "Project Record Documents" for submitting record Drawings, record <br />Specifications, and record Product Data. <br />8. Section 017900 "Demonstration and Training" for submitting video recordings of <br />demonstration of equipment and training of Owner's personnel. <br />1.3 DEFINITIONS <br />A. Action Submittals: Written and graphic information and physical samples that require <br />Architect's responsive action. Action submittals are those submittals indicated in individual <br />Specification Sections as "action submittals." <br />B. Informational Submittals: Written and graphic information and physical samples that do not <br />require Architect's responsive action. Submittals may be rejected for not complying with