My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />TEMPORARY FACILITIES AND CONTROLS 015000 - 1 <br />SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes requirements for temporary utilities, support facilities, and security and <br />protection facilities. <br />B. Related Requirements: <br />1. Section 011000 "Summary" for work restrictions and limitations on utility interruptions. <br />1.3 USE CHARGES <br />A. General: Installation and removal of and use charges for temporary facilities shall be included in <br />the Contract Sum unless otherwise indicated. Allow other entities engaged in the Project to use <br />temporary services and facilities without cost, including, but not limited to, Owner's <br />construction forces, Architect, testing agencies, and authorities having jurisdiction. <br />B. Sewer Service: Pay sewer-service use charges for sewer usage by all entities for construction <br />operations. <br />C. Water Service: Pay water-service use charges for water used by all entities for construction <br />operations. <br />D. Electric Power Service: Pay electric-power-service use charges for electricity used by all <br />entities for construction operations. <br />1.4 INFORMATIONAL SUBMITTALS <br />A. Site Utilization Plan: Show temporary facilities, temporary utility lines and connections, staging <br />areas, construction site entrances, vehicle circulation, and parking areas for construction <br />personnel. <br />B. Implementation and Termination Schedule: Within 15 days of date established for <br />commencement of the Work, submit schedule indicating implementation and termination dates <br />of each temporary utility.
The URL can be used to link to this page
Your browser does not support the video tag.