Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />DEMONSTRATION AND TRAINING 017900 - 1 <br />SECTION 017900 - DEMONSTRATION AND TRAINING <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes administrative and procedural requirements for instructing Owner's personnel, <br />including the following: <br />1. Instruction in operation and maintenance of systems, subsystems, and equipment. <br />2. Demonstration and training video recordings. <br />1.3 INFORMATIONAL SUBMITTALS <br />A. Instruction Program: Submit outline of instructional program for demonstration and training, <br />including a list of training modules and a schedule of proposed dates, times, length of <br />instruction time, and instructors' names for each training module. Include learning objective and <br />outline for each training module. <br />1. Indicate proposed training modules using manufacturer-produced demonstration and <br />training video recordings for systems, equipment, and products in lieu of video recording <br />of live instructional module. <br />B. Qualification Data: For facilitator. <br />C. Attendance Record: For each training module, submit list of participants and length of <br />instruction time. <br />1.4 CLOSEOUT SUBMITTALS <br />A. Demonstration and Training Video Recordings: Upload to web-based software website or on <br />USB within seven days of end of each training module. <br />1. Identification: On each copy, provide an applied label with the following information: <br />a. Name of Project. <br />b. Name and address of videographer. <br />c. Name of Architect. <br />d. Name of Construction Manager. <br />e. Name of Contractor.