My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />DEMONSTRATION AND TRAINING 017900 - 3 <br />1. Each training sessions to last a maximum of 8 hours. <br />2. Controls specific training to be four to five days training for multiple Owner’s operation <br />team members. <br />1.7 INSTRUCTION PROGRAM <br />A. Program Structure: Develop an instruction program that includes individual training modules <br />for each system and for equipment not part of a system, as required by individual Specification <br />Sections. <br />B. Training Modules: Develop a learning objective and teaching outline for each module. Include a <br />description of specific skills and knowledge that participant is expected to master. For each <br />module, include instruction for the following as applicable to the system, equipment, or <br />component: <br />1. Basis of System Design, Operational Requirements, and Criteria: Include the following: <br />a. System, subsystem, and equipment descriptions. <br />b. Performance and design criteria if Contractor is delegated design responsibility. <br />c. Operating standards. <br />d. Regulatory requirements. <br />e. Equipment function. <br />f. Operating characteristics. <br />g. Limiting conditions. <br />h. Performance curves. <br />2. Documentation: Review the following items in detail: <br />a. Emergency manuals. <br />b. Operation and Maintenance Manual. <br />c. Project Record Documents. <br />d. Identification systems. <br />e. Warranties and bonds. <br />f. Maintenance service agreements and similar continuing commitments. <br />3. Emergencies: Include the following, as applicable: <br />a. Instructions on meaning of warnings, trouble indications, and error messages. <br />b. Instructions on stopping. <br />c. Shutdown instructions for each type of emergency. <br />d. Operating instructions for conditions outside of normal operating limits. <br />e. Sequences for electric or electronic systems. <br />f. Special operating instructions and procedures. <br />4. Operations: Include the following, as applicable: <br />a. Startup procedures. <br />b. Equipment or system break-in procedures. <br />c. Routine and normal operating instructions.
The URL can be used to link to this page
Your browser does not support the video tag.