My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />METAL BUILDING SYSTEMS 133419 - 14 <br />B. Tolerances: Comply with MBMA's "Metal Building Systems Manual" for fabrication and <br />erection tolerances. <br />C. Primary Framing: Shop fabricate framing components to indicated size and section, with <br />baseplates, bearing plates, stiffeners, and other items required for erection welded into place. Cut, <br />form, punch, drill, and weld framing for bolted field assembly. <br />1. Make shop connections by welding or by using high-strength bolts. <br />2. Join flanges to webs of built-up members by a continuous, submerged arc-welding process. <br />3. Brace compression flange of primary framing with steel angles or cold-formed structural <br />tubing between frame web and purlin web or girt web, so flange compressive strength is <br />within allowable limits for any combination of loadings. <br />4. Weld clips to frames for attaching secondary framing if applicable, or punch for bolts. <br />5. Shop Priming: Prepare surfaces for shop priming according to SSPC-SP 2. Shop prime <br />primary framing with specified primer after fabrication. <br />D. Secondary Framing: Shop fabricate framing components to indicated size and section by roll <br />forming or break forming, with baseplates, bearing plates, stiffeners, and other plates required for <br />erection welded into place. Cut, form, punch, drill, and weld secondary framing for bolted field <br />connections to primary framing. <br />1. Make shop connections by welding or by using non-high-strength bolts. <br />2. Shop Priming: Prepare uncoated surfaces for shop priming according to SSPC-SP 2. Shop <br />prime uncoated secondary framing with specified primer after fabrication. <br />E. Metal Panels: Fabricate and finish metal panels at the factory to greatest extent possible, by <br />manufacturer's standard procedures and processes, as necessary to fulfill indicated performance <br />requirements. Comply with indicated profiles and with dimensional and structural requirements. <br />1. Provide panel profile, including major ribs and intermediate stiffening ribs, if any, for full <br />length of metal panel. <br />2.9 SOURCE QUALITY CONTROL <br />A. Special Inspection: Owner will engage a qualified special inspector to perform source quality <br />control inspections and to submit reports. <br />1. Accredited Manufacturers: Special inspections will not be required if fabrication is <br />performed by an IAS AC472-accredited manufacturer approved by authorities having <br />jurisdiction to perform such Work without special inspection. <br />a. After fabrication, submit copy of certificate of compliance to authorities having <br />jurisdiction, certifying that Work was performed according to Contract <br />requirements.
The URL can be used to link to this page
Your browser does not support the video tag.