Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />WIRING DEVICES 262726 - 5 <br />D. Install convenience receptacle 6 inches above backsplash of counter. <br />3.5 FIELD QUALITY CONTROL <br />A. Inspect each wiring device for defects. <br />B. Operate each wall switch with circuit energized and verify proper operation. <br />C. Verify that each receptacle device is energized. <br />D. Test each receptacle device for proper polarity. <br />E. Test each GFCI receptacle device for proper operation. <br />3.6 ADJUSTING <br />A. Adjust devices and wall plates to be flush and level. <br />END OF SECTION 262726