My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />CONCRETE PAVING 321313 - 9 <br />each joint edge with a jointer tool. Carefully remove strips or caps of two-piece <br />assemblies after concrete has hardened. Clean groove of loose debris. <br /> <br />C. Construction Joints: Set construction joints at side and end terminations of paving and at <br />locations where paving operations are stopped for more than 1/2 hour, unless paving terminates <br />at isolation joints. <br /> <br />1. Continue reinforcement across construction joints unless indicated otherwise. Do not <br />continue reinforcement through sides of strip paving unless indicated. <br />2. Provide tie bars at sides of paving strips where indicated. <br />3. Use bonding agent on existing concrete surfaces that will be joined with fresh concrete. <br />D. Isolation Joints: Form isolation joints of preformed joint filler strips abutting concrete curbs, <br />catch basins, manholes, inlets, structures, walks, other fixed objects, and where indicated. <br /> <br />E. Expansion Joints: Form expansion joints of preformed joint filler strips. <br /> <br />1. Install dowel bars and support assemblies at joints where indicated. When no sleeves <br />are used, lubricate or asphalt-coat one half of dowel length to prevent concrete bonding to <br />one side of joint. <br />2. <br />3. Where spacing is not shown, locate expansion joints at 32-foot maximum spacing or less <br />to fit the control joints pattern. <br /> <br /> <br />F. Installation of joint fillers and sealants is specified in Section "Joint Sealants". <br /> <br />1. Extend joint fillers full width and depth of joint, not less than 1/2 inch or more than 1 <br />inch below finished surface where joint sealant is indicated. Place top of joint filler <br />flush with finished concrete surface when no joint sealant is required. <br /> <br />2. Furnish joint fillers in one-piece lengths for full width being placed wherever possible. <br />Where more than one length is required, lace or clip joint filler sections together. <br />3. Protect top edge of joint filler during concrete placement with a metal, plastic, or other <br />temporary preformed cap. Remove protective cap after concrete has been placed on <br />both sides of joint. <br /> <br /> <br />G. Where plastic "zip strips" are used to construct concrete joints, cut and remove, as a minimum, <br />the top 1/4 inch of these strips after concrete has cured, and coordinate installation of joint <br />filler as specified in Section “Joint Sealants”. <br /> <br />3.5 CONCRETE PLACEMENT <br /> <br />A. Inspection: Before placing concrete, inspect and complete formwork installation, reinforcing <br />steel, and items to be embedded or cast in. Notify other trades to permit installation of their <br />work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.