Laserfiche WebLink
ST. BARBARA CATHOLIC SCHOOL TASK 2 75-24272-01 <br />DIOCESE OF ORANGE SEPTEMBER 12TH, 2024 <br />SANTA ANA, CA BID & PERMIT SET <br /> <br />DECORATIVE METAL FENCES AND GATES 323119 - 5 <br />N. <br />2.5 SWING GATES <br />A. Gate Configuration: As indicated. <br />B. Gate Frame Height: As indicated. <br />C. Gate Opening Width: As indicated. <br />D. Steel Frames and Bracing: Fabricate members from steel as indicated. <br />E. Frame Corner Construction: Welded. <br />F. Additional Rails: As indicated. <br />G. Steel Finish: High-performance coating. <br />2.6 SETTING MATERIAL <br />A. Concrete: Minimum 28-day compressive strength of 3,000 psi with air entrainment of 4% +/- 1 <br />1/2%. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine areas and conditions, with Installer present, for compliance with requirements for site <br />clearing, earthwork, pavement work, construction layout, and other conditions affecting <br />performance of the Work. <br />B. Do not begin installation before final grading is completed unless otherwise permitted by <br />Architect. <br />C. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 PREPARATION <br />A. Stake locations of fence lines, gates, and terminal posts. Do not exceed intervals of 500 feet or <br />line of sight between stakes. Indicate locations of utilities, lawn sprinkler system, underground <br />structures, benchmarks, and property monuments. <br />1. Construction layout and field engineering are specified in Division 01 Section <br />"Execution"