My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5306 W McFadden Ave - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
5306 W McFadden Ave
>
5306 W McFadden Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 10:50:47 AM
Creation date
2/24/2026 10:50:27 AM
Metadata
Fields
Template:
Plan
Permit Number
101122413
101122414
Full Address
5306 W McFadden Ave
Street Number
5306
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project No.: D-6289-08 <br />St. Barbara Catholic School <br />Percolation -Infiltration Tests <br />Introduction <br />Geotechnical Solutions, Inc. (GSI) has performed field investigation <br />CITY OF SANTA ANA <br />Planning and Building Agency <br />may, lS. <br />Approved <br />FOR PERMIT ISSUANCE <br />Master ID: <br />using borings <br />and sampling of earth material and field percolation tests at the proposed locations as <br />shown on Existing / Demolition Site Plan, Boring & Percolation Tests Location Map <br />(Plate B in Appendix A) at 5306 West McFadden Avenue, California. <br />The main purpose of this study is to provide infiltration rates of subgrade material based <br />on field percolation tests so that an appropriate system incorporating Storm Water <br />permanent best management practice (BMP) to manage surface water into the ground and <br />the appropriate infiltration basins, or any other approved system may be designed, and <br />existing drainage be improved. <br />Field Exploration <br />Field exploration consisted of drilling two borings, PC-1 and PC-2, 8-inches in diameter <br />and extended to 5-feet depth below the existing ground as shown on Existing / <br />Demolition Site Plan, Boring & Percolation Tests Location Map (Plate B). The <br />percolation test logs are presented on Plates D-1 through D-3 in Appendix A. Borings 13- <br />1 through B-3 were drilled varying from 16'-6" to 51'-6" depths during our geotechnical <br />investigation and their logs are also attached in Appendix B. <br />The attached logs tabulate data based on laboratory classification tests and visual <br />observation by the field engineer at the site. During drilling bulk samples of earth <br />material obtained for further laboratory test. <br />Groundwater <br />Groundwater was encountered at 14 feet below the ground surface during our drilling <br />program for St. Barbara Catholic School. <br />The Historical high groundwater depth was found to be around 36.9 feet deep based on <br />
The URL can be used to link to this page
Your browser does not support the video tag.