2025 LC DESIGNS INTELLECTUAL
<br />PROPERTY NOTICE:
<br />This drawing is the sole property of LC Designs. It
<br />is loaned to the recipient for his/her confidential use
<br />only; and in consideration of the loan of this
<br />drawing, the recipient agrees that this drawing shall
<br />not be reproduced, copied, loaned, nor used for any
<br />purpose other than for which it is specifically
<br />intended without the express consent of
<br />LC Designs.
<br />LC Designs, 2205 E Dory St, Goddard, KS 67052
<br />316-816-0771
<br />Structure Type:
<br />EVERCHARGE LC GENERAL NOTES
<br />Project:
<br />AMZL ENERGY EV
<br />LC Designs
<br />Drawn By:Client:
<br />IDBA
<br />R
<br />MEMBER
<br />AMERICAN INSTITUTE of
<br />BUILDING DESIGN
<br />KITTY HAWK ENGINEERING
<br />BARRETT CROOK, PE, LEED AP
<br />5306 MULHOLLAND DRIVE
<br />SUMMERVILLE, SC 29485
<br />252-655-1056
<br />G1.1
<br />SECTION 015000
<br />TEMPORARY FACILITIES AND CONTROLS
<br />PART 1 - GENERAL
<br />1.1 SUMMARY
<br />A. SECTION INCLUDES REQUIREMENTS FOR TEMPORARY UTILITIES, SUPPORT
<br />FACILITIES, AND SECURITY AND PROTECTION FACILITIES.
<br />1.2 USE CHARGES
<br />A. INSTALLATION, REMOVAL, AND USE CHARGES FOR TEMPORARY FACILITIES SHALL BE
<br />INCLUDED IN THE CONTRACT SUM UNLESS OTHERWISE INDICATED. ALLOW OTHER
<br />ENTITIES ENGAGED IN THE PROJECT TO USE TEMPORARY SERVICES AND FACILITIES
<br />WITHOUT COST, INCLUDING, BUT NOT LIMITED TO TESTING AGENCIES AND
<br />AUTHORITIES HAVING JURISDICTION.
<br />B. ELECTRIC POWER SERVICE FROM EXISTING SYSTEM: ELECTRIC POWER FROM
<br />OWNER'S EXISTING SYSTEM IS AVAILABLE FOR USE WITHOUT METERING AND WITHOUT
<br />PAYMENT OF USE CHARGES. PROVIDE CONNECTIONS AND EXTENSIONS OF SERVICES AS
<br />REQUIRED FOR CONSTRUCTION OPERATIONS.
<br />1.3 SUBMITTALS
<br />A. SITE UTILIZATION PLAN: SHOW TEMPORARY FACILITIES, TEMPORARY UTILITY LINES
<br />AND CONNECTIONS, STAGING AREAS, CONSTRUCTION SITE ENTRANCES, VEHICLE
<br />CIRCULATION, AND PARKING AREAS FOR CONSTRUCTION PERSONNEL.
<br />PART 2 - PRODUCTS
<br />2.1 TEMPORARY FACILITIES
<br />A. FIELD OFFICES: PREFABRICATED OR MOBILE UNITS WITH SERVICEABLE FINISHES,
<br />TEMPERATURE CONTROLS, AND FOUNDATIONS ADEQUATE FOR NORMAL LOADING.
<br />PART 3 - EXECUTION
<br />3.1 TEMPORARY FACILITIES, GENERAL
<br />A. CONSERVATION: COORDINATE CONSTRUCTION AND USE OF TEMPORARY FACILITIES
<br />WITH CONSIDERATION GIVEN TO CONSERVATION OF ENERGY, WATER, AND
<br />MATERIALS. COORDINATE USE OF TEMPORARY UTILITIES TO MINIMIZE WASTE.
<br />3.2 INSTALLATION, GENERAL
<br />A. LOCATE FACILITIES WHERE THEY WILL SERVE PROJECT ADEQUATELY AND RESULT IN
<br />MINIMUM INTERFERENCE WITH PERFORMANCE OF THE WORK. RELOCATE AND
<br />MODIFY FACILITIES AS REQUIRED BY PROGRESS OF THE WORK.
<br />B. PROVIDE EACH FACILITY READY FOR USE WHEN NEEDED TO AVOID DELAY. DO NOT
<br />REMOVE UNTIL FACILITIES ARE NO LONGER NEEDED OR ARE REPLACED BY
<br />AUTHORIZED USE OF COMPLETED PERMANENT FACILITIES.
<br />3.3 TEMPORARY UTILITY INSTALLATION
<br />A. SANITARY FACILITIES: PROVIDE TEMPORARY TOILETS, WASH FACILITIES, AND
<br />DRINKING WATER FOR USE OF CONSTRUCTION PERSONNEL. COMPLY WITH
<br />REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION FOR TYPE, NUMBER, LOCATION,
<br />OPERATION, AND MAINTENANCE OF FIXTURES AND FACILITIES.
<br />B. ELECTRIC POWER SERVICE: PROVIDE ELECTRIC POWER SERVICE AND DISTRIBUTION
<br />SYSTEM OF SUFFICIENT SIZE, CAPACITY, AND POWER CHARACTERISTICS REQUIRED
<br />FOR CONSTRUCTION OPERATIONS.
<br />C. LIGHTING: PROVIDE TEMPORARY LIGHTING WITH LOCAL SWITCHING THAT PROVIDES
<br />ADEQUATE ILLUMINATION FOR CONSTRUCTION OPERATIONS, OBSERVATIONS,
<br />INSPECTIONS, AND TRAFFIC CONDITIONS.
<br />3.4 SUPPORT FACILITIES INSTALLATION
<br />A. WASTE DISPOSAL FACILITIES: PROVIDE WASTE-COLLECTION CONTAINERS IN SIZES
<br />ADEQUATE TO HANDLE WASTE FROM CONSTRUCTION OPERATIONS. COMPLY WITH
<br />REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION. COMPLY WITH PROGRESS
<br />CLEANING REQUIREMENTS IN SECTION 017300 "EXECUTION."
<br />B. LIFTS AND HOISTS: PROVIDE FACILITIES NECESSARY FOR HOISTING MATERIALS AND
<br />PERSONNEL.
<br />3.5 SECURITY AND PROTECTION FACILITIES INSTALLATION
<br />A. PROTECTION OF EXISTING FACILITIES: PROTECT EXISTING VEGETATION, EQUIPMENT,
<br />STRUCTURES, UTILITIES, AND OTHER IMPROVEMENTS AT PROJECT SITE AND ON
<br />ADJACENT PROPERTIES, EXCEPT THOSE INDICATED TO BE REMOVED OR ALTERED. REPAIR
<br />DAMAGE TO EXISTING FACILITIES.
<br />1. WHERE ACCESS TO ADJACENT PROPERTIES IS REQUIRED IN ORDER TO AFFECT
<br />PROTECTION OF EXISTING FACILITIES, OBTAIN WRITTEN PERMISSION FROM ADJACENT
<br />PROPERTY OWNER TO ACCESS PROPERTY FOR THAT PURPOSE.
<br />B. ENVIRONMENTAL PROTECTION: PROVIDE PROTECTION, OPERATE TEMPORARY
<br />FACILITIES, AND CONDUCT CONSTRUCTION AS REQUIRED TO COMPLY WITH
<br />ENVIRONMENTAL REGULATIONS AND THAT MINIMIZE POSSIBLE AIR, WATERWAY, AND
<br />SUBSOIL CONTAMINATION OR POLLUTION OR OTHER UNDESIRABLE EFFECTS.
<br />C. TEMPORARY EROSION AND SEDIMENTATION CONTROL: PROVIDE MEASURES TO
<br />PREVENT SOIL EROSION AND DISCHARGE OF SOIL-BEARING WATER RUNOFF AND
<br />AIRBORNE DUST TO UNDISTURBED AREAS AND TO ADJACENT PROPERTIES AND
<br />WALKWAYS, ACCORDING TO REQUIREMENTS OF EPA CONSTRUCTION GENERAL PERMIT
<br />OR AUTHORITIES HAVING JURISDICTION, WHICHEVER IS MORE STRINGENT.
<br />1. VERIFY THAT FLOWS OF WATER REDIRECTED FROM CONSTRUCTION AREAS OR
<br />GENERATED BY CONSTRUCTION ACTIVITY DO NOT ENTER OR CROSS TREE- OR
<br />PLANT-PROTECTION ZONES.
<br />2. INSPECT, REPAIR, AND MAINTAIN EROSION- AND SEDIMENTATION-CONTROL
<br />MEASURES DURING CONSTRUCTION UNTIL PERMANENT VEGETATION HAS BEEN
<br />ESTABLISHED.
<br />3. CLEAN, REPAIR, AND RESTORE ADJOINING PROPERTIES AND ROADS AFFECTED BY
<br />EROSION AND SEDIMENTATION FROM PROJECT SITE DURING THE COURSE OF
<br />PROJECT.
<br />4. REMOVE EROSION AND SEDIMENTATION CONTROLS AND RESTORE AND STABILIZE
<br />AREAS DISTURBED DURING REMOVAL.
<br />D. STORMWATER CONTROL: COMPLY WITH REQUIREMENTS OF AUTHORITIES HAVING
<br />JURISDICTION. PROVIDE BARRIERS IN AND AROUND EXCAVATIONS AND SUBGRADE
<br />CONSTRUCTION TO PREVENT FLOODING BY RUNOFF OF STORMWATER FROM HEAVY RAINS.
<br />E. TREE AND PLANT PROTECTION: INSTALL TEMPORARY FENCING LOCATED AS
<br />INDICATED OR OUTSIDE THE DRIP LINE OF TREES TO PROTECT VEGETATION FROM DAMAGE
<br />FROM CONSTRUCTION OPERATIONS. PROTECT TREE ROOT SYSTEMS FROM DAMAGE,
<br />FLOODING, AND EROSION.
<br />3.6 OPERATION, TERMINATION, AND REMOVAL
<br />A. TERMINATION AND REMOVAL: REMOVE EACH TEMPORARY FACILITY WHEN NEED FOR
<br />ITS SERVICE HAS ENDED, WHEN IT HAS BEEN REPLACED BY AUTHORIZED USE OF A
<br />PERMANENT FACILITY, OR NO LATER THAN SUBSTANTIAL COMPLETION. COMPLETE OR, IF
<br />NECESSARY, RESTORE PERMANENT CONSTRUCTION THAT MAY HAVE BEEN
<br />DELAYED BECAUSE OF INTERFERENCE WITH TEMPORARY FACILITY. REPAIR DAMAGED
<br />WORK, CLEAN EXPOSED SURFACES, AND REPLACE CONSTRUCTION THAT
<br />CANNOT BE SATISFACTORILY REPAIRED.
<br />SECTION 017419
<br />CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
<br />PART 1 - GENERAL
<br />1.1 SUMMARY
<br />A. SECTION INCLUDES ADMINISTRATIVE AND PROCEDURAL REQUIREMENTS FOR THE
<br />FOLLOWING:
<br />1. SALVAGING NONHAZARDOUS [DEMOLITION] [AND] [CONSTRUCTION] WASTE.
<br />2. RECYCLING NONHAZARDOUS [DEMOLITION] [AND] [CONSTRUCTION] WASTE.
<br />3. DISPOSING OF NONHAZARDOUS [DEMOLITION] [AND] [CONSTRUCTION] WASTE.
<br />1.2 DEFINITIONS
<br />A. CONSTRUCTION WASTE: BUILDING, STRUCTURE, AND SITE IMPROVEMENT
<br />MATERIALS AND OTHER SOLID WASTE RESULTING FROM CONSTRUCTION, REMODELING,
<br />RENOVATION, OR REPAIR OPERATIONS. CONSTRUCTION WASTE INCLUDES PACKAGING.
<br />B. DEMOLITION WASTE: BUILDING, STRUCTURE, AND SITE IMPROVEMENT MATERIALS
<br />RESULTING FROM DEMOLITION OPERATIONS.
<br />C. DISPOSAL: REMOVAL OF DEMOLITION OR CONSTRUCTION WASTE AND SUBSEQUENT
<br />SALVAGE, SALE, RECYCLING, OR DEPOSIT IN LANDFILL, INCINERATOR ACCEPTABLE
<br />TO AUTHORITIES HAVING JURISDICTION, OR DESIGNATED SPOIL AREAS ON OWNER'S
<br />PROPERTY.
<br />D. RECYCLE: RECOVERY OF DEMOLITION OR CONSTRUCTION WASTE FOR SUBSEQUENT
<br />PROCESSING IN PREPARATION FOR REUSE.
<br />E. SALVAGE: RECOVERY OF DEMOLITION OR CONSTRUCTION WASTE AND SUBSEQUENT
<br />SALE OR REUSE IN ANOTHER FACILITY.
<br />F. SALVAGE AND REUSE: RECOVERY OF DEMOLITION OR CONSTRUCTION WASTE AND
<br />SUBSEQUENT INCORPORATION INTO THE WORK.
<br />1.3 SUBMITTALS
<br />A. WASTE MANAGEMENT PLAN: SUBMIT PLAN WITHIN 30 DAYS OF DATE ESTABLISHED
<br />FOR COMMENCEMENT OF THE WORK.
<br />1.4 WASTE MANAGEMENT PLAN
<br />A. GENERAL: DEVELOP A WASTE MANAGEMENT PLAN ACCORDING TO REQUIREMENTS
<br />IN THIS SECTION. PLAN SHALL CONSIST OF WASTE IDENTIFICATION, WASTE
<br />REDUCTION WORK PLAN, AND COST/REVENUE ANALYSIS. DISTINGUISH BETWEEN
<br />DEMOLITION AND CONSTRUCTION WASTE. INDICATE QUANTITIES BY WEIGHT OR
<br />VOLUME, BUT USE SAME UNITS OF MEASURE THROUGHOUT WASTE MANAGEMENT PLAN.
<br />B. WASTE IDENTIFICATION: INDICATE ANTICIPATED TYPES AND QUANTITIES OF
<br />DEMOLITION, SITE-CLEARING, AND CONSTRUCTION WASTE GENERATED BY THE WORK.
<br />INCLUDE ESTIMATED QUANTITIES AND ASSUMPTIONS FOR ESTIMATES.
<br />PART 2 - PRODUCTS
<br />PART 3 - EXECUTION
<br />3.1 PLAN IMPLEMENTATION
<br />A. GENERAL: IMPLEMENT APPROVED WASTE MANAGEMENT PLAN. PROVIDE HANDLING,
<br />CONTAINERS, STORAGE, SIGNAGE, TRANSPORTATION, AND OTHER ITEMS AS
<br />REQUIRED TO IMPLEMENT WASTE MANAGEMENT PLAN DURING THE ENTIRE DURATION OF
<br />THE CONTRACT.
<br />B. SITE ACCESS AND TEMPORARY CONTROLS: CONDUCT WASTE MANAGEMENT
<br />OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS,
<br />WALKWAYS, AND OTHER ADJACENT OCCUPIED AND USED FACILITIES.
<br />1. DESIGNATE AND LABEL SPECIFIC AREAS ON PROJECT SITE NECESSARY FOR
<br />SEPARATING MATERIALS THAT ARE TO BE SALVAGED AND RECYCLED.
<br />2. COMPLY WITH SECTION 015000 "TEMPORARY FACILITIES AND CONTROLS" FOR
<br />CONTROLLING DUST AND DIRT, ENVIRONMENTAL PROTECTION, AND NOISE CONTROL.
<br />3.2 RECYCLING DEMOLITION WASTE
<br />A. ASPHALT PAVING: BREAK UP AND TRANSPORT PAVING TO ASPHALT-RECYCLING
<br />FACILITY.
<br />B. CONCRETE: REMOVE REINFORCEMENT AND OTHER METALS FROM CONCRETE AND
<br />SORT WITH OTHER METALS.
<br />1. PULVERIZE CONCRETE TO MAXIMUM 4-INCH (100-MM) SIZE.
<br />C. METALS: SEPARATE METALS BY TYPE.
<br />1. REMOVE AND DISPOSE OF BOLTS, NUTS, WASHERS, AND OTHER ROUGH HARDWARE.
<br />D. CONDUIT: REDUCE CONDUIT TO STRAIGHT LENGTHS AND STORE BY MATERIAL AND
<br />SIZE.
<br />3.3 RECYCLING CONSTRUCTION WASTE
<br />A. PACKAGING:
<br />1. CARDBOARD AND BOXES: BREAK DOWN PACKAGING INTO FLAT SHEETS. BUNDLE
<br />AND STORE IN A DRY LOCATION.
<br />2. POLYSTYRENE PACKAGING: SEPARATE AND BAG MATERIALS.
<br />3. PALLETS: AS MUCH AS POSSIBLE, REQUIRE DELIVERIES USING PALLETS TO REMOVE
<br />PALLETS FROM PROJECT SITE. FOR PALLETS THAT REMAIN ON-SITE, BREAK DOWN
<br />PALLETS INTO COMPONENT WOOD PIECES AND COMPLY WITH REQUIREMENTS FOR
<br />RECYCLING WOOD.
<br />4. CRATES: BREAK DOWN CRATES INTO COMPONENT WOOD PIECES AND COMPLY WITH
<br />REQUIREMENTS FOR RECYCLING WOOD.
<br />3.4 DISPOSAL OF WASTE
<br />A. GENERAL: EXCEPT FOR ITEMS OR MATERIALS TO BE RECYCLED, REMOVE WASTE
<br />MATERIALS FROM PROJECT SITE AND LEGALLY DISPOSE OF THEM IN A LANDFILL OR
<br />INCINERATOR ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION.
<br />1. EXCEPT AS OTHERWISE SPECIFIED, DO NOT ALLOW WASTE MATERIALS THAT ARE TO
<br />BE DISPOSED OF ACCUMULATE ON-SITE.
<br />2. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON
<br />ADJACENT SURFACES AND AREAS.
<br />B. GENERAL: EXCEPT FOR ITEMS OR MATERIALS TO BE SALVAGED OR RECYCLED,
<br />REMOVE WASTE MATERIALS AND LEGALLY DISPOSE OF AT DESIGNATED SPOIL AREAS ON
<br />OWNER'S PROPERTY.
<br />C. BURNING: DO NOT BURN WASTE MATERIALS.
<br />BARR
<br />ETT C
<br />CROO
<br />K
<br />Digitally
<br />signed by
<br />BARRETT C
<br />CROOK
<br />Date:
<br />2025.04.08
<br />12:33:06
<br />-04'00'
|