Laserfiche WebLink
STRUCTURAL <br />SPECIFICATIONS <br />DLX8 - EVSG 10192300127 .00 2025.02.20 <br /> <br />CAST-IN-PLACE CONCRETE 03 30 00 - 17 <br /> <br />3.7 PATCHING FORMED CONCRETE: <br />A. Remove fins, projections, and offsets. Cut out rock pockets, honeycomb, and all other <br />defects to sound concrete, with edges of cuts straight and back-beveled. Dampen cut- <br />outs and edges, and scrub with neat portland cement slurry just before patching, or an <br />apply approved epoxy concrete adhesive. <br />B. Saturate form tie holes with water and fill voids and patches with flush smooth-finished <br />mortar of same mix as concrete (less coarse aggregate), cure, and dry. <br />3.8 MISCELLANEOUS CONCRETE ITEMS: <br />A. Filling In: Fill in holes and openings left in concrete structures for passage of Work <br />specified in other Sections, after such Work is in place. Mix, place, and cure concrete as <br />specified to blend with in-place construction. Provide other miscellaneous concrete <br />filling shown or required to complete Work. <br />B. Curbs: Provide monolithic finish to interior curbs by stripping forms while concrete is <br />still green and by steel-troweling surfaces to a hard, dense finish with corners, <br />intersections, and terminations slightly rounded. <br />C. Equipment Bases and Foundations: Provide machine and equipment bases and <br />foundations as shown on drawings. Set anchor bolts for machines and equipment to <br />template at correct elevations, complying with diagrams or templates of manufacturer <br />furnishing machines and equipment. <br />3.9 GROUTING AND DRYPACKING: <br />A. Install as indicated or required. Where grouting and drypacking is part of the work of <br />other sections, it shall conform to the following requirements, as applicable. <br />B. Drypacking: Mix materials thoroughly with minimum amount of water. Pre -saturate <br />surfaces to receive dry pack for 24-hours prior to placement, install drypack by forcing <br />and rodding to fill voids and provide complete bearing under plates. Finish exposed <br />surfaces smooth and cure with damp burlap or liquid curing compound. <br />C. Non-Shrink Grouting: <br />1. Mixing: Mix the approved non-shrink grout material with sufficient water per <br />manufacturer’s recommendations. <br />2. Application: Surfaces to receive the non-shrink grout shall be clean, and shall <br />be pre-saturated thoroughly 24-hours before placing the mortar. Before <br />grouting, surfaces to be in contact shall be roughened and cleaned thoroughly, <br />all loose particles shall be removed and the surface flushed thoroughly with <br />neat cement grout immediately before the grouting mortar is placed. Place fluid <br />grout from one side only and puddle, chain, or pump for complete filling of <br />voids; do not remove the dams or forms until grout attains initial set. Finish <br />exposed surfaces smooth, and cure as recommended by grout manufacturer. <br />DLX8 - EVSG 10192300127 .00 2025.02.20 <br /> <br />CAST-IN-PLACE CONCRETE 03 30 00 - 18 <br /> <br />3.10 SITE CONCRETE WORK: <br />A. Use bituminous type joint filler. Cure all concrete for at least 10 days with liquid curing <br />compound or sheet material except as otherwise specified. Construct all site concrete <br />of 2,000 psi concrete unless otherwise indicated or specified. Provide reinforcing bars <br />or mesh only where indicated. Conform to requirements specified hereinbefore for slab <br />finishing and curing as applicable. <br />B. Concrete Curbs: Provide 1/2" thick expansion joints, at beginning and at end of curves, <br />intersections, and 20-foot intervals between, set plumb, square, and to same profile as <br />the curbs. Edge curb tops to 1/2" radius and vertical joints to 1/4" radius. Apply smooth <br />finish followed by fine hair brush finish. <br />C. Concrete Gutters: Provide 1/2" thick expansion joints as above for curbs and apply a <br />light broom finish with a 3" wide steel trowel finish at flow line. <br />D. Combination Curb and Gutter: As above for curbs and gutters, including expansion <br />joints, 3" troweled flow line at base of curb. <br />E. Concrete Walks: Provide 1/2" expansion joints as specified for curbs and where walks <br />abut rigid structures, aligned with joints in curbs where adjoining, and apply light broom <br />finish perpendicular to traffic direction. Score walks as shown or directed. <br />F. Control Joints: Provide sawed joints for concrete walks and exterior concrete pavement <br />as indicated. Use "Zip Strip" as distributed by S.C.A. Construction Supply, Santa Fe <br />Springs, Calif., or equal only where specifically indicated. Install tops of the joints flush <br />with the concrete surface and depth of joint a minimum of 1/4 the thickness of slab. <br />3.11 SLURRY CONCRETE: <br />A. Slurry concrete shall be used as fill or backfill where indicated, and wherever <br />excavations are carried below design depths without approval. Slurry concrete shall be <br />placed within 1 hour after mixing, and shall be placed in manner that will prevent voids <br />in, or segregation of, the concrete. <br />B. Backfilling over slurry concrete shall not be done less than 4 hours after placing. <br />3.12 FIELD QUALITY CONTROL: <br />A. Level of Floors: Continuously monitor concrete placing to maintain level floor by use of <br />an instrument level, transit, or laser <br />B. Delivery tickets: Have available copies of delivery tickets complying with ASTM C94 for <br />each load of concrete delivered to site. Include on the tickets the additional information <br />specified in the ASTM document. <br />C. Continuous Inspection: Construct structural concrete exceeding 2,500 psi compressive <br />strength under continuous inspection of Inspector. Obtain inspection and approval of <br />DLX8 - EVSG 10192300127 .00 2025.02.20 <br /> <br />CAST-IN-PLACE CONCRETE 03 30 00 - 19 <br />forms and reinforcing by Building Department as required and by the Inspector before <br />placing structural concrete. <br />D. Testing of Concrete: Testing Laboratory shall perform the following tests. Samples for <br />testing shall be obtained in accordance with ASTM C172 and shall be taken from as close <br />to point of placement as possible. <br />1. Compressive Strength Tests: Cast one set of four or more cylinders from each <br />day's placing and each 150 cubic yards, or fraction thereof, or not less than once <br />for each 5,000 square feet of surface area for slabs and walls, of each strength <br />of structural concrete. Date cylinders, assign record number, and tag showing <br />the location from which sample was taken. Also record slump test result of <br />sample. Do not make more than two series of tests from any one location or <br />batch of concrete. <br />2. Slump Tests: Make slump test for each set of test cylinders. <br />3. Test Cylinders: Samples will be made in accordance with ASTM C172. Cast <br />cylinders according to ASTM C31; 24 hours later, store cylinders under moist <br />curing conditions at about 70 degrees F. Test according to ASTM C39; one at 7 <br />and two at 28 day ages. The remaining cylinder(s) shall be kept in reserve in <br />case tests are unsatisfactory. <br />4. Control Test Cylinders: Cast a set of two or more cylinders for each day's placing <br />of concrete for slabs supported on shoring. Place test cylinders on slabs <br />represented by cylinders and cure the same as slabs. Test cylinders to <br />determine proper times for removal of shores and reshoring. A strength test <br />shall be the average of the compressive strengths of 2 cylinders made from the <br />same sample of concrete and tested at 28 days. <br />5. Shrinkage Test: Cast 4" by 4" by 11" long bars with 10" effective gauge length, <br />cured for 7 days in moist room and as specified in ASTM C157. Make <br />measurements at 7-day intervals to 35 day age. Allowable shrinkage shall not <br />exceed 0.045% after period of 35 days. <br /> <br />E. Tests for Lightweight Structural Concrete: Conform to CBC Section 1705.3 and ACI 318 <br />Section 26.12.2. Perform following test for each 150 cubic yards of lightweight <br />structural concrete. <br />1. Along with slump test, ASTM C143, and from same sample, determine air <br />content, unit weight and yield per ASTM C138. <br />2. Shrinkage Test: Cast 4" by 4" by 11" long bars with 10" effective gauge length, <br />cured for 7 days in moist room and as specified in ASTM C157. Make <br />measurements at 7-day intervals to 35-day age. Allowable shrinkage shall not <br />exceed 0.05% after period of 35 days. <br />3. Previous Shrinkage Tests: Ready-mix concrete manufacturer may furnish <br />certified test reports from an approved Testing Laboratory as proof of meeting <br />shrinkage requirements provided aggregates used and concrete covered by <br />such test reports conform to the mix design approved for use on the Work. <br /> <br />F. Core Tests: comply with ACI 318. If tests show the compressive strength of any concrete <br />falls below the required minimum, additional testing of concrete which unsatisfactory <br />DLX8 - EVSG 10192300127 .00 2025.02.20 <br /> <br />CAST-IN-PLACE CONCRETE 03 30 00 - 20 <br />tests represent may be required. Make core tests according to ASTM C42. Fill core holes <br />with drypack concrete of strength required for concrete. Contractor shall bear cost of <br />tests for below-strength concrete even if such tests indicate concrete has attained <br />required minimum compressive strength, and all costs for required corrections. <br />G. Field Certifications: For all concrete, provide signed copy of batch plant's certificate <br />stating quantity of each material, amount of water, admixtures, departure time and <br />date accompanying each load of materials or concrete. <br />3.15 DEFECTIVE CONCRETE <br /> <br />A. Defective Concrete: The following concrete will be deemed to be defective, and shall <br />be removed promptly from the job site. <br />1. Concrete, which is not formed as indicated, is not true to intended alignment, <br />is not plumb or level where so intended, is not true to intended grades and <br />levels; <br />2. Has voids or honeycomb that have been cut, resurfaced, or filled, unless with <br />the approval of the Architect; <br />3. Has sawdust, shavings, wood, or embedded debris; <br />4. Does not conform fully to provisions of the Contract Documents. <br />B. Repairs and Replacements: <br />1. Where defective concrete is found after removal of the forms, cut out the <br />defective concrete, if necessary, and make the surfaces match adjacent <br />surfaces. <br />2. Work uneven surfaces and angles of concrete to a surface matching adjacent <br />concrete surfaces. <br /> <br />3.16 PROTECTION: <br /> <br />1. Protection: Protect concrete from marring and damage due to weather and <br />construction activities. <br />1. Protective measures shall include providing temporary coverings, as specified <br />in Section 01 50 00 - Construction Facilities and Temporary Controls, and <br />prohibiting all non-essential construction activities, including cleaning and <br />maintenance of construction equipment. <br />2. In particular, protect concrete floor slabs from oil, paint and other products <br />which might penetrate and degrade concrete surface <br /> <br /> <br />END OF SECTION <br /> <br /> <br /> <br /> <br />S0.07 <br />N <br />I <br />R <br />G <br />T <br />RE <br />TATSS <br />E OFILACFO <br />UC TURA <br />R <br />L <br />R <br />STERED P L <br />OF ESSIONA <br />N <br />E <br />R <br />AI <br />E <br />ENGI <br />................ <br />. <br />. <br />. <br />............................... <br />. <br />. <br />. <br />............... <br />No. 5913 <br />Exp. 12/31/25CHR <br />I <br />STOPHER A NDREW <br />DOM <br />I <br />NAS <br />N <br />I <br />R <br />G <br />T <br />RE <br />TATSS <br />E OFILACFO <br />UC TURA <br />R <br />L <br />R <br />STERED P L <br />OF ESSIONA <br />N <br />E <br />R <br />AI <br />E <br />ENGI <br />................ <br />. <br />. <br />. <br />............................... <br />. <br />. <br />. <br />............... <br />No. 5913 <br />Exp. 12/31/25CHR <br />I <br />STOPHER A NDREW <br />DOM <br />I <br />NAS <br />N <br />I <br />R <br />G <br />T <br />RE <br />TATSS <br />E OFILACFO <br />UC TURA <br />R <br />L <br />R <br />STERED P L <br />OF ESSIONA <br />N <br />E <br />R <br />AI <br />E <br />ENGI <br />................ <br />. <br />. <br />. <br />............................... <br />. <br />. <br />. <br />............... <br />No. 5913 <br />Exp. 12/31/25CHR <br />I <br />STOPHER A NDREW <br />DOM <br />I <br />NAS