Laserfiche WebLink
AREA-AVERAGED Fm(INCH/HR) = 0.15 <br /> AREA-AVERAGED Fp(INCH/HR) = 0.40 <br /> AREA-AVERAGED Ap = 0.37 <br /> EFFECTIVE STREAM AREA(ACRES) = 0.11 <br /> TOTAL STREAM AREA(ACRES) = 0.11 <br /> PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.57 <br /> **************************************************************************** <br /> FLOW PROCESS FROM NODE 60.00 TO NODE 70.00 IS CODE = 21 <br /> ---------------------------------------------------------------------------- <br /> >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< <br /> >>USE TIME-OF-CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< <br /> ============================================================================ <br /> INITIAL SUBAREA FLOW-LENGTH(FEET) = 18.10 <br /> ELEVATION DATA: UPSTREAM(FEET) = 80.86 DOWNSTREAM(FEET) = 80.39 <br /> Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 <br /> SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.000 <br /> * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 6.187 <br /> SUBAREA Tc AND LOSS RATE DATA(AMC III): <br /> DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc <br /> LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) <br /> COMMERCIAL A 0.01 0.40 0.100 52 5.00 <br /> SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.40 <br /> SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100 <br /> SUBAREA RUNOFF(CFS) = 0.07 <br /> TOTAL AREA(ACRES) = 0.01 PEAK FLOW RATE(CFS) = 0.07 <br /> **************************************************************************** <br /> FLOW PROCESS FROM NODE 70.00 TO NODE 80.00 IS CODE = 31 <br /> ---------------------------------------------------------------------------- <br /> ** WARNING: Computed Flowrate is less than 0.1 cfs, <br /> Routing Algorithm is UNAVAILABLE. <br /> **************************************************************************** <br /> FLOW PROCESS FROM NODE 80.00 TO NODE 80.00 IS CODE = 1 <br /> ---------------------------------------------------------------------------- <br /> >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< <br /> >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< <br /> ============================================================================ <br /> TOTAL NUMBER OF STREAMS = 2 <br /> CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: <br /> TIME OF CONCENTRATION(MIN.) = 5.00 <br /> RAINFALL INTENSITY(INCH/HR) = 6.19 <br /> AREA-AVERAGED Fm(INCH/HR) = 0.04 <br /> AREA-AVERAGED Fp(INCH/HR) = 0.40 <br /> AREA-AVERAGED Ap = 0.10 <br /> EFFECTIVE STREAM AREA(ACRES) = 0.01 <br /> TOTAL STREAM AREA(ACRES) = 0.01 <br /> PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.07 <br /> ** CONFLUENCE DATA ** <br /> STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER <br /> NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE <br /> 1 0.57 5.85 5.655 0.40( 0.15) 0.37 0.1 30.00 <br /> 1 0.57 6.05 5.546 0.40( 0.15) 0.37 0.1 10.00 <br /> 2 0.07 5.00 6.187 0.40( 0.04) 0.10 0.0 60.00 <br /> RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO <br /> CONFLUENCE FORMULA USED FOR 2 STREAMS. <br /> ** PEAK FLOW RATE TABLE ** <br /> STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER <br /> NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE <br /> 1 0.60 5.00 6.187 0.40( 0.14) 0.34 0.1 60.00 <br /> 2 0.63 5.85 5.655 0.40( 0.14) 0.34 0.1 30.00 <br /> 3 0.63 6.05 5.546 0.40( 0.14) 0.34 0.1 10.00 <br /> COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: <br /> PEAK FLOW RATE(CFS) = 0.63 Tc(MIN.) = 5.85 <br /> EFFECTIVE AREA(ACRES) = 0.12 AREA-AVERAGED Fm(INCH/HR) = 0.14 <br /> AREA-AVERAGED Fp(INCH/HR) = 0.40 AREA-AVERAGED Ap = 0.34 <br /> TOTAL AREA(ACRES) = 0.1 <br /> LONGEST FLOWPATH FROM NODE 10.00 TO NODE 80.00 = 191.70 FEET. <br /> **************************************************************************** <br /> FLOW PROCESS FROM NODE 80.00 TO NODE 100.00 IS CODE = 31 <br /> ---------------------------------------------------------------------------- <br /> >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< <br /> >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< <br /> ============================================================================ <br /> ELEVATION DATA: UPSTREAM(FEET) = 78.17 DOWNSTREAM(FEET) = 78.15 <br /> FLOW LENGTH(FEET) = 2.60 MANNING'S N = 0.013 <br /> DEPTH OF FLOW IN 9.0 INCH PIPE IS 4.2 INCHES <br /> PIPE-FLOW VELOCITY(FEET/SEC.) = 3.11 <br /> ESTIMATED PIPE DIAMETER(INCH) = 9.00 NUMBER OF PIPES = 1 <br /> PIPE-FLOW(CFS) = 0.63 <br /> PIPE TRAVEL TIME(MIN.) = 0.01 Tc(MIN.) = 5.86 <br /> LONGEST FLOWPATH FROM NODE 10.00 TO NODE 100.00 = 194.30 FEET. <br /> **************************************************************************** <br /> FLOW PROCESS FROM NODE 100.00 TO NODE 100.00 IS CODE = 1 <br /> ---------------------------------------------------------------------------- <br /> >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< <br /> ============================================================================ <br /> TOTAL NUMBER OF STREAMS = 2 <br /> CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: <br /> TIME OF CONCENTRATION(MIN.) = 5.86 <br /> RAINFALL INTENSITY(INCH/HR) = 5.65 <br /> AREA-AVERAGED Fm(INCH/HR) = 0.14 <br />914-918 N Bewley <br />St5/8/2025