Laserfiche WebLink
DN <br />3 <br />S3.70 <br />TREX DECKING PER ARCH <br />OVER JOISTS, TYP <br />(E) CONT FTG, TYP <br />(E) CONT FTG, TYP <br />UP <br />ACCESS HATCH <br />PER ARCH <br />4x8 <br />4x <br />8 <br />4x8 <br />4x <br />8 <br />4x8 4x8 4x8 4x8 4x8 (2)-1 3/4x7 1/4 LVL 4x8 4x8 4x8 <br />4x <br />8 <br />4x <br />8 <br />4x <br />8 <br />(2)-2x8 <br />(2)-2x8 <br />(2 <br />) <br />- <br />2 <br />x <br />8 <br />(2 <br />) <br />- <br />2 <br />x <br />8 <br />2x <br />8 <br /> <br />F <br />J <br />@ <br />1 <br />6 <br />" <br />O <br />C <br />2x8 FJ <br />@ 16"OC <br />VERIFY OR PROVIDE 4x <br />MIN POST. ATTACH <br />HANGER TO POST <br />SIMPSON HUC HANGER <br />5 <br />S5.63 <br />6 <br />S5.63 <br />(3)-1 3/4x7 1/4 LVL <br />2x <br />8 <br /> <br />F <br />J <br />@ <br />1 <br />6 <br />" <br />O <br />C <br />6 <br />S5.63 <br />TYP <br />1 <br />S4.30TYP 5 <br />S5.63 TYP <br />SIMPSON HUC HANGER <br />VERIFY OR PROVIDE 4x MIN <br />POST. ATTACH HANGER TO <br />POST, TYP EA END OF BEAM <br />SIMPSON HUC HANGER <br />4x8 MIN LEDGER W/ <br />(2)-SDS1/4x5 @ 12"OC, TYP. <br />REFER TO ARCH FOR DETAIL <br />1'-6"SQx12"THK W/ <br />(3)-#4 EA WAY BOT, TYP <br />1 3/4x7 1/4 LVL FJ @ 16"OC <br />1'-6"Wx1'-6"THK W/ <br />(2)-#4 LONG BARS T&B & <br />#4 TRANS BARS @ 12"OC T&B <br />HS <br />S <br />1 <br />2 <br />x <br />4 <br />x <br />1 <br />/ <br />4 <br />ST <br />A <br />I <br />R <br /> <br />S <br />T <br />R <br />I <br />N <br />G <br />E <br />R <br />HS <br />S <br />1 <br />2 <br />x <br />4 <br />x <br />1 <br />/ <br />4 <br />ST <br />A <br />I <br />R <br /> <br />S <br />T <br />R <br />I <br />N <br />G <br />E <br />R <br />WOOD STRINGER <br />PER 11 S5.63 <br />(2)-1 3/4x7 1/4 LVL <br />1'-6"Wx1'-6"THK W/ <br />(2)-#4 LONG BARS T&B & <br />#4 TRANS BARS @ 12"OC T&B <br />10 <br />S5.63 <br />11 <br />S5.63 <br />10 <br />S5.63 <br />11 <br />S5.63 <br />WOOD STRINGER <br />PER 11 S5.63 <br />9 <br />S5.63 <br />TYP <br />4x8 <br />4x8 <br />4x8 <br />4x8 <br />4x <br />8 <br />4x <br />8 <br />2x <br />8 <br /> <br />F <br />J <br />@ <br />1 <br />6 <br />" <br />O <br />C <br />10 <br />S5.63 <br />11 <br />S5.63 <br />2x8 FJ <br />@ 16"OC <br />4x8 <br />10 <br />S5.63 <br />11 <br />S5.63 <br />2x8 FJ <br />@ 16"OC <br />2x8 FJ <br />@ 16"OC <br />SIMPSON HUC HANGER <br />SIMPSON HUC HANGER <br />SIMPSON HUC HANGER, <br />TYP EA END <br />WOOD STRINGER <br />PER 11 S5.63 <br />1'-6"Wx1'-6"THK W/ <br />(2)-#4 LONG BARS T&B & <br />#4 TRANS BARS @ 12"OC T&B <br />1'-6"Wx1'-6"THK W/ <br />(2)-#4 LONG BARS T&B & <br />#4 TRANS BARS @ 12"OC T&B <br />WOOD STRINGER <br />PER 11 S5.63 <br />1 <br />S4.30TYP <br />4x4 <br />TYP <br />4x4TYP <br />6 <br />S3.70 <br />VERIFY OR PROVIDE <br />(2)-2x STUDS MIN EA <br />END OF (E) HDR <br />VERIFY OR PROVIDE <br />(2)-2x STUDS MIN AT <br />EA END OF BEAM, <br />SEE DETAIL 4 S3.70 <br />(E) COLUMNS & <br />FTG TO REMAIN <br />HSS <br />4 <br />x <br />4 <br />x <br />1 <br />/ <br />4 <br />UP <br />HS <br />S <br />1 <br />2 <br />x <br />4 <br />x <br />1 <br />/ <br />4 <br />ST <br />A <br />I <br />R <br /> <br />S <br />T <br />R <br />I <br />N <br />G <br />E <br />R <br />HS <br />S <br />1 <br />2 <br />x <br />4 <br />x <br />1 <br />/ <br />4 <br />ST <br />A <br />I <br />R <br /> <br />S <br />T <br />R <br />I <br />N <br />G <br />E <br />R <br />3 <br />S3.70 <br />VERIFY OR PROVIDE <br />(2)-2x STUDS MIN EA <br />END OF (E) HDR <br />VERIFY OR PROVIDE <br />(2)-2x STUDS MIN AT <br />EA END OF BEAM, <br />SEE DETAIL 4 S3.70 <br />2'-6"SQx1'-0"THK <br />CONC FTG W/ <br />(5)-#4 EA WAY BOT <br />HSS <br />4 <br />x <br />4 <br />x <br />1 <br />/ <br />4 <br />2'-6"SQx1'-0"THK <br />CONC FTG W/ <br />(5)-#4 EA WAY BOT <br />6 <br />S3.70 <br />SIMPSON <br />HUC HANGER <br />2'-0" WIDE x 1'-6" THK <br />CONC FTG W/ (4)-#4 <br />LONG & #4 TRANS <br />BARS @ 12"OC, TYP <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />(E) 2x6, TYP <br />(E) 2x DECKING <br />(E) STEEL BEAM <br />(E) 6x8 HDR (VERIFY <br />SIZE IN FIELD) <br />(E) 6x8 HDR (VERIFY <br />SIZE IN FIELD) <br />(E) 2x6, TYP <br />(E) 2x DECKING <br />(E) 6x8 HDR (VERIFY <br />SIZE IN FIELD) <br />(E) STEEL BEAM <br />(E) 2x6, TYP <br />4x KING POST EA <br />END OF BEAM, SEE <br />DETAIL 4 S3.70 <br />NOTE: <br />EXISTING BALCONY FRAMING, INCLUDING <br />FRAMING NOT SPECIFICALLY CALLED OUT <br />ON PLAN, TO REMAIN PER ARCH. <br />CONTRACTOR TO TEMPORARILY SHORE <br />AND SUPPORT ALL BALCONY FRAMING <br />DURING CONSTRUCTION OF NEW LANDING <br />AND STAIR TO ENSURE FRAMING REMAINS <br />INTACT AND UNCOMPROMISED. <br />2x <br />8 <br /> <br />@ <br /> <br />1 <br />6 <br />" <br />O <br />C <br />HSS BEAM TO HSS <br />COL PER 7 S3.70 <br />HSS12x4x1/4 <br />2x <br />8 <br /> <br />@ <br /> <br />1 <br />6 <br />" <br />O <br />C <br />HSS12x4x1/4 <br />6x8 <br />HS <br />S <br />1 <br />2 <br />x <br />4 <br />x <br />1 <br />/ <br />4 <br />ST <br />A <br />I <br />R <br /> <br />S <br />T <br />R <br />I <br />N <br />G <br />E <br />R <br />HSS BEAM TO HSS <br />COL PER 7 S3.70 <br />4x KING POST EA <br />END OF BEAM, SEE <br />DETAIL 4 S3.70 <br />ST <br />A <br />I <br />R <br /> <br />S <br />T <br />R <br />I <br />N <br />G <br />E <br />R <br />HS <br />S <br />1 <br />2 <br />x <br />4 <br />x <br />1 <br />/ <br />4 <br />HS <br />S <br />1 <br />2 <br />x <br />4 <br />x <br />1 <br />/ <br />4 <br />ST <br />A <br />I <br />R <br /> <br />S <br />T <br />R <br />I <br />N <br />G <br />E <br />R <br />HS <br />S <br />1 <br />2 <br />x <br />4 <br />x <br />1 <br />/ <br />4 <br />ST <br />A <br />I <br />R <br /> <br />S <br />T <br />R <br />I <br />N <br />G <br />E <br />R <br />6x8 <br />2 <br />S3.70 <br />1 <br />S3.70 <br />12 <br />S5.63 <br />2 <br />S3.70 <br />1 <br />S3.70 <br />12 <br />S5.63 <br />AT GUARDRAIL TO <br />(E) FRAMING, SEE <br />13 S5.63 TYP <br />SIMPSON HUC <br />HANGER, TYP EA <br />END TO WOOD POST <br />SIMPSON HUC <br />HANGER, TYP EA <br />END TO WOOD POST <br />2 <br />2 <br />2 <br />2 <br />WD PROJ. #DRAWN BY:CHECKED DATE <br />23411 JA EG/SH <br />WESTGROUP DESIGNS, INC.© <br />ISSUED FOR: <br />REGISTRATION/SIGNATURE: <br />SHEET TITLE: <br />SHEET NUMBER: <br />S2.30 <br />REVISIONS: <br />02/19/25 <br />STAIR FOUNDATION <br />AND FRAMING PLAN <br />No.3503 <br />L <br />I <br />GNE <br />L <br />S NO <br />B A <br />LAE <br />A LI OFRNIA <br />N <br />E <br />ER <br />I <br />E <br />ET <br />ORPD <br />F E <br />R IR <br />L.KC <br />E <br />TS <br />AT <br />CFO <br />RE <br />G <br />S <br />I <br />S <br />URALTSRUCTPRO <br />G <br />R <br />E <br />S <br />S <br /> <br />- <br />NO <br />T <br /> <br />F <br />O <br />R <br /> <br />P <br />L <br />A <br />N <br />REV <br />I <br />E <br />W <br />H: <br />\ <br />2 <br />0 <br />2 <br />3 <br />\ <br />2 <br />3 <br />0 <br />2 <br />2 <br />1 <br />\ <br />3 <br />_ <br />D <br />r <br />a <br />w <br />i <br />n <br />g <br />s <br />\ <br />D <br />w <br />g <br />s <br />- <br />0 <br />0 <br />\ <br />2 <br />3 <br />- <br />0 <br />2 <br />2 <br />1 <br />- <br />0 <br />0 <br />_ <br />S <br />2 <br />. <br />3 <br />0 <br /> <br />S <br />T <br />A <br />I <br />R <br /> <br />F <br />O <br />U <br />N <br />D <br />A <br />T <br />I <br />O <br />N <br /> <br />A <br />N <br />D <br /> <br />F <br />R <br />A <br />M <br />I <br />N <br />G <br /> <br />P <br />L <br />A <br />N <br />. <br />d <br />w <br />g <br /> <br /> <br /> <br /> <br />P <br />L <br />O <br />T <br />T <br />E <br />D <br /> <br />B <br />Y <br />: <br /> <br /> <br />Ch <br />a <br />n <br />n <br />o <br />n <br /> <br />S <br />h <br />i <br />d <br />a <br />k <br />i <br /> <br /> <br /> <br /> <br />O <br />N <br />: <br /> <br /> <br />Ma <br />r <br />c <br />h <br /> <br />2 <br />4 <br />, <br /> <br />2 <br />0 <br />2 <br />5 <br />BEWLEY STREET <br />RESIDENCE <br />ILLUMINATION <br />FOUNDATION <br />918 BEWLEY STREET, <br />SANTA ANA, CA 92703 <br />LONG BEACH • SAN DIEGO <br />Project: <br />LONG BEACH OFFICE <br />3900 Cover Street, Long Beach <br />CA 90808 • 562.985.3200 <br />S T R U C T U R A L E N G I N SREE <br />23-0221-00 <br />02/19/251 DELTA 1 <br />02/19/25CITY APPROVAL <br />03/24/252 DELTA 2 <br />SCALE:S2.30 <br />STAIR FOUNDATION PLAN A <br />1/4" = 1'-0"SCALE:S2.30 <br />STAIR FRAMING PLAN B <br />1/4" = 1'-0" <br />1.SEE GENERAL NOTES SHEET(S) FOR APPLICABLE NOTES, ABBREVIATIONS AND <br />PLAN SYMBOLS LEGEND. SEE PLAN SHEET FOR LIST OF APPLICABLE TYPICAL <br />DETAILS NOT CALLED OUT ON PLANS. <br />2.EXISTING CONSTRUCTION IS SHOWN FADED AND IS LABELED AS EXISTING OR (E). <br />NEW CONSTRUCTION IS SHOWN DARK AND IS SPECIFICALLY REFERENCED BY <br />DETAILS AND NOTES. <br />3.EXISTING CONDITIONS ARE SHOWN TO THE BEST OF OUR KNOWLEDGE. <br />CONTRACTOR IS RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS. <br />DISCREPANCIES BETWEEN ACTUAL FIELD CONDITIONS AND THOSE SHOWN ON <br />THESE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER <br />PRIOR TO PROCEEDING. <br />4.PROVIDE OVER-EXCAVATION AND COMPACTED BACKFILL PER GEOTECHNICAL <br />REPORT AND TYPICAL OVER-EXCAVATION AND COMPACTED BACKFILL <br />REQUIREMENTS DETAIL. <br />5.SLEEVES ACROSS FOOTINGS SHOWN ON PLAN ARE FOR 2" DIAMETER AND <br />GREATER PIPES/ CONDUITS. SEE MECHANICAL, ELECTRICAL AND/ OR PLUMBING <br />DRAWINGS FOR SMALLER ELEMENTS REQUIRING SLEEVES. CONTRACTOR TO <br />DETERMINE ACTUAL INVERT ELEVATION AND LOCATIONS OF SLEEVES. SEE <br />TYPICAL PIPE/ CONDUIT SLEEVES ACROSS FOOTING DETAIL 4/S4.00. <br />6.UNLESS NOTED OTHERWISE ON PLAN OR DETAIL, CENTER LINE OF FOUNDATION <br />ELEMENT SHALL MATCH WALL AND/OR COLUMN CENTER LINE. <br />7.FINISH FLOOR ELEVATION = PER ARCHITECT. <br />8.UNLESS NOTED OTHERWISE, SLAB-ON-GRADE SHALL BE 4" THICK, REINFORCED W/ <br />#4 @ 18"OC EACH WAY, OVER SUB-BASE AND SUB-GRADE PREPARED PER TYPICAL <br />SLAB-ON-GRADE UNDERLAYMENT DETAIL 5/S4.00 <br />9.WHEN SLAB-ON-GRADE CONTROL JOINTS ARE NOT SHOWN ON PLAN, PROVIDE <br />JOINTS PER TYPICAL SLAB-ON-GRADE CONTROL AND CONSTRUCTION JOINTS <br />DETAIL 6/S4.00 <br />10.SEE ARCHITECTURAL PLANS FOR CURBS, SLAB DEPRESSIONS AND SLOPES NOT <br />SHOWN ON PLAN. <br />11.UNLESS NOTED OTHERWISE, ALL EXTERIOR WALLS SHALL BE FRAMED W/ 2X6 <br />STUDS @ 16"OC. <br />12.SEE SHEET S5.55 FOR PLYWOOD SHEAR WALL ELEVATIONS. <br />13.JAMB POSTS PER 5/S5.50 OR 6/S5.50 ARE NOT SHOWN ON PLAN BUT SHALL BE <br />INSTALLED PER THE DETAILS. <br />14.SEE ARCHITECTURAL DRAWINGS FOR NON-BEARING WALL LOCATIONS AND <br />DIMENSIONS NOT SHOWN ON PLAN. <br />PLAN NOTES <br />1.SEE GENERAL NOTES SHEET(S) FOR APPLICABLE NOTES, ABBREVIATIONS AND <br />PLAN SYMBOLS LEGEND. SEE PLAN SHEET FOR LIST OF APPLICABLE TYPICAL <br />DETAILS NOT CALLED OUT ON PLANS. <br />2.EXISTING CONSTRUCTION IS SHOWN FADED AND IS LABELED AS EXISTING OR (E). <br />NEW CONSTRUCTION IS SHOWN DARK AND IS SPECIFICALLY REFERENCED BY <br />DETAILS AND NOTES. <br />3.EXISTING CONDITIONS ARE SHOWN TO THE BEST OF OUR KNOWLEDGE. <br />CONTRACTOR IS RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS. <br />DISCREPANCIES BETWEEN ACTUAL FIELD CONDITIONS AND THOSE SHOWN ON <br />THESE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER <br />PRIOR TO PROCEEDING. <br />4.FINISH FLOOR ELEVATION = PER ARCHITECT. <br />5.UNLESS NOTED OTHERWISE, TOP OF PLYWOOD FLOOR SHEATHING SHALL BE 1 1/2" <br />BELOW FINISHED FLOOR ELEVATION. <br />6.WHERE HEADERS ARE NOT CALLED OUT ON PLAN, SEE 5/S5.50 OR 6/S5.50 FOR <br />SCHEDULE. <br />7.JAMB POSTS PER 5/S5.50 OR 6/S5.50 ARE NOT SHOWN ON PLAN BUT SHALL BE <br />INSTALLED PER THE DETAILS. <br />8.FOR FRAMING SPANS GREATER THAN 6'-0", PROVIDE WOOD BLOCKING AT THE <br />LESSER OF MIDSPAN OR 8'-0"OC. INSTALL BLOCKING PER APPLICABLE TYPICAL <br />DETAILS. <br />9.ALL FRAMING MEMBERS NOT OTHERWISE DIMENSIONED SHALL BE EQUALLY <br />SPACED BETWEEN GIRDERS OR OTHER SUPPORTS. <br />10.UNLESS NOTED OTHERWISE, FLOOR SHEATHING SHALL BE 3/4" STRUCT I <br />PLYWOOD, BLOCKED, W/ 10D NAILS @ 6",6",12" (BN,EN,FN). <br />11.PROVIDE CONSTRUCTION GLUE BETWEEN ALL FLOOR SHEATHING AND BEAMS AND <br />JOISTS. <br />12.SEE ARCHITECTURAL PLANS FOR CURBS, FLOOR DEPRESSIONS AND SLOPES NOT <br />SHOWN ON PLAN. <br />13.AT DRAG BEAMS INDICATED ON PLAN, PROVIDE BOUNDARY NAILING ALONG FULL <br />LENGTH OF DRAG BEAM. <br />14.AT SEISMIC/ WIND DRAG STRAP, WHERE INDICATED ON PLAN, SEE TYPICAL DRAG <br />DETAIL 5/S5.55 FOR STRAP CONFIGURATION. PROVIDE BN NAILING ALONG <br />MEMBERS CONNECTED WITH STRAP, INCLUDING BLOCKING. WHERE STRAP <br />OCCURS ABOVE PLYWOOD, STRAP NAILING MAY TAKE THE PLACE OF PLYWOOD BN <br />NAILING. <br />15.UNLESS NOTED OTHERWISE, ALL EXTERIOR WALLS SHALL BE FRAMED W/ 2X6 <br />STUDS @ 16"OC. <br />16.SEE ARCHITECTURAL DRAWINGS FOR NON-BEARING WALL LOCATIONS, SOFFITS, <br />FURRING AND DIMENSIONS NOT SHOWN ON PLAN. <br />17.SEE SHEET S5.55 FOR TYPICAL SHEAR WALL ELEVATIONS, SCHEDULES AND <br />DETAILS. <br />18.SEE A/S5.55 AND 4/S5.55 FOR HOLDDOWNS AT EACH END OF SHEAR WALLS. <br />ADDITIONAL HOLDDOWNS ARE INDICATED ON PLAN WHERE THEY OCCUR. <br />19.DO NOT CUT ANY NEW OPENINGS OR ENLARGE ANY EXISTING OPENINGS IN THE <br />FLOOR (FOR DUCTS, PIPES, ETC.) UNLESS SPECIFICALLY SHOWN ON THESE <br />STRUCTURAL DRAWINGS. <br />FRAMING PLAN NOTES <br />Renewal Date <br />LICENSED ARCHITECT <br />STATE OF C A L I FORNI <br />A <br />J <br />C32284 <br />HOSHUAJAMESSMIT <br />05/31/25 <br />03/24/25 <br />914-918 N Bewley <br />St5/8/2025