Laserfiche WebLink
Dong Engineering Inc. <br />ADU <br />3109 S.ARTESIA ST UNIT #2, SANTA ANA, CA 92704 <br />Job#: 240517 <br />Date: 10/21/2024 <br />PLAN: 1 <br />CODE: CBC 2022 <br />SECTION: 1Y <br />Number of Story: 1 Section width: 18(ft)Section length: 45.5(ft) <br />Base height: 0.5(ft)Slope roof height: 14(ft)Gable mean roof height: 11.5(ft) <br />WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS: <br />Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1 <br />Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1 <br />B = 18(ft), L = 45.5(ft), H = 12.5(ft)-->L/B = 2.53, H/L = 0.27 <br />Wall coefficient: Cpw = 0.8, Cpl = -0.27 <br />Wind exposure = C-->anpha = 9.5, zg = 900 <br />Kz = 2.01*(15/zg)^(2/anpha)qz = 0.00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh) <br />WIND LOAD: <br />SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE: <br />Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.034, SD1 = 2FvS1/3 =0, <br />Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.034*1*W/6.5 = 0.1114*W <br />Total Seismic Load = 101.05 = 101.05 PLF <br />Redistrib: 907.5*9 = 8167.5 PLFxFT <br />DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10 <br />ROOF DIAPHRAGM <br />Max shear = 144.36 x 18 / (2 x 45.5) = 28.55 PLF <br />Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c. <br />Chord force = 144.36 x 18^2 / (8 x 45.5) = 128.5 LBS <br />Splice w/ min. (1) 16d sinker nails each side of splice at 8" o.c. (standard construction) <br />(z, Kz, qz, P): (15, 0.85, 22.35, 20.4) <br />ROOF <br />Roof = 15*45.5 = 682.5 PLF <br />Wall = 15*2*4.5 + 10*2*4.5 = 225 PLF <br />Shear = 0.1114(682.5+225) = 0.1114*907.5 = 101.1 PLF <br />Plate height: ROOF = 9(ft) <br />SHEAR ROOF = 101.05*907.5*9/8167.5 = 101.05 PLF <br />SHEAR ROOF = 0.6*W = 85.67(plf) <br />ROOF 101.05 PLF SEISMIC GOVERN <br />Page 8 of 21