My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CITY PROJECT - 1821 & 1823 E Chestnut Ave - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Chestnut Ave
>
1821 E Chestnut Ave
>
CITY PROJECT - 1821 & 1823 E Chestnut Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 11:14:23 AM
Creation date
2/24/2026 11:13:50 AM
Metadata
Fields
Template:
Plan
Permit Number
20184680
20184681
30148144
30148145
40139793
40139794
101121878
101121879
Full Address
1821 E Chestnut Ave
1823 E Chestnut Ave
Street Number
1823
Street Direction
E
Street Name
Chestnut
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(E) AMPHITHEATER <br />PROPOSED BUILDING B <br />PHASE 2 <br />PROPOSED BUILDING A <br />PHASE 1 <br />FUTURE ENTRY/ TICKETING (N.I.C) <br />(E) TREE <br />(E) BUILDING <br />I-5 HIGHWAY <br />FUTURE EXHIBIT: SPLASH PAD (N.I.C) <br />PHASE 2 <br />PHASE 1 <br />TERMINATE ALL <br />UTILITY LINES AT <br />PHASE 1 BOUNDARY <br />TERMINATE ALL <br />UTILITY LINES AT <br />PHASE 1 BOUNDARY <br />EXISTING WATER LINE <br />TO REMAIN FOR <br />PHASE 1 <br />ENTIRE FIRE LANE <br />IDENTIFICATION RED <br />CURB TO BE PAINTED <br />IN PHASE 1 <br />TRANSFORMER, MECHANICAL <br />UNIT FOR BUILDING A, AND <br />CONCRETE PAD TO BE <br />INSTALLED DURING PHASE 1 <br />WOODEN BENCH <br />TO BE INSTALLED <br />DURING PHASE 2 <br />FIRE HYDRANT TO <br />BE INSTALLED <br />DURING PHASE 1 <br />PROJECT <br />COPYRIGHT LOC, INC <br />ORIGINAL SHEET SIZE: 42" X 30" <br />LOC <br />CLIENT: <br />ARCHITECT: <br />CONSULTANTS: <br />PREPARED UNDER THE SUPERVISION OF: <br />ALI JEEVANJEE <br />LOC ARCHITECTS DATE <br />REVIEWED FOR CONSTRUCTABILITY: <br />SEAN THOMAS <br />PRINCIPAL CIVIL ENGINEER <br />RCE NO.: 80470 <br />DATE <br />RECOMMENDED FOR CONSTRUCTION: <br />JASON GABRIEL <br />PRINCIPAL CIVIL ENGINEER <br />RCE NO.: 62968 <br />DATE <br />3/ <br />2 <br />8 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />5 <br />: <br />4 <br />9 <br />: <br />3 <br />0 <br /> <br />P <br />M <br />2308 <br />PHASING PLAN <br />MARCH 28, 2025 <br />PLAN CHECK <br />SUBMITTAL 02 <br />A1.3 <br />SANTA ANA ZOO <br />1821 & 1823 E CHESTNUT AVE, SANTA <br />ANA, CA 92701 <br />KPFF <br />STRUCTURAL ENGINEER <br />LOC ARCHITECTS <br />KPFF <br />CIVIL ENGINEER <br />BORDER <br />LANDSCAPE ARCHITECT <br />ABRARI AND ASSOCIATES <br />MEP ENGINEER <br />ASSOCIATED SOILS ENGINEERING <br />GEOTECHNICAL ENGINEER <br />700 S. FLOWER, SUITE 2100 <br />LOS ANGELES, CA 90017 <br />213 372 5111 <br />Ramzi.hodali@kpff.com <br />700 S. FLOWER, SUITE 2100 <br />LOS ANGELES, CA 90017 <br />213 372 5111 <br />Sharad.Ganju@kpff.com <br />724 S. SPRING ST, SUITE 701 <br />LOS ANGELES, CA 90014 <br />213 372 5111 <br />Darren@border-la.com <br />1713 S. STANDARD AVE <br />GLENDALE, CA 91201 <br />818 956 1900 <br />Telma@abrari.com <br />2860 WALNUT AVE. <br />SIGNAL HILL, CA 90755 <br />562 897 2749 <br />Ted@associatedsoils.com <br />3203 E. 4TH ST <br />LOS ANGELES, CA 90063 <br />213 537 0480 <br />Office@loc-arch.com <br />1801 E. CHESTNUT AVE. <br />SANTA ANA, CA 92701 <br />714 647 6575 <br />Efisher@santa-ana.org <br />SANTA ANA ZOO <br />EDUCATION HUB <br />MARCH 28, 2025 <br />25 <br />1/16" = 1'-0"1PHASE 1 SITE PLAN <br />No.Description Date <br />1 DRC SUBMITTAL 02 11/21/24
The URL can be used to link to this page
Your browser does not support the video tag.