Laserfiche WebLink
<br />ii <br />TABLE OF CONTENTS- continued <br />Section Page <br /> 5.2.3 Remedial Grading ............................................................................................................ 13 <br />a) Proposed Building and Ancillary Improvements ................................................. 13 <br />b) Exterior Slab-on-Grade/Concrete Flatwork /Hardscape/Pavement Support ........ 13 <br /> 5.2.4 Temporary Excavation ................................................................................................ 14 <br />a) Temporary Sloping. .............................................................................................. 14 <br />b) Temporary Shoring .............................................................................................. 15 <br />c) Slot Cutting Adjacent to Existing Structure Foundations .................................... 15 <br /> 5.2.5 Suitable Soils and Imported Soils .................................................................................... 16 <br /> 5.2.6 Backfilling and Compaction Requirements ..................................................................... 16 <br /> 5.2.7 Tests and Observations .............................................................................................. 17 <br /> 5.3 Foundation Design ............................................................................................................. 17 <br /> 5.3.1 Conventional Footing Foundation ............................................................................ 17 <br />a) Minimum Footing Dimension and Reinforcement. ............................................. 17 <br />b) Allowable Soils Bearing Capacity ......................................................................... 18 <br />c) Lateral Resistance ................................................................................................ 18 <br />d) Settlements. ......................................................................................................... 19 <br /> 5.3.2 Retaining Walls .......................................................................................................... 19 <br /> 5.3.3 Footing/Foundation Observation .............................................................................. 21 <br /> 5.4 Slabs-On-Grade .................................................................................................................. 21 <br /> 5.5 Asphaltic Concrete (AC) Flexural Pavement Design ........................................................... 22 <br /> 5.6 Portland Cement Concrete (PCC) Pavements ..................................................................... 23 <br /> 5.7 Site Drainage ...................................................................................................................... 24 <br /> 5.8 Soil Corrosivity Evaluation .................................................................................................. 24 <br /> 5.8.1 Concrete Corrosion .......................................................................................................... 25 <br /> 5.8.2 Metal Corrosion ............................................................................................................... 25 <br /> 5.9 Utility Trenches .................................................................................................................. 26 <br /> 5.10 Plan Review, Observations and Testing........................................................................... 26 <br />6.0 FIELD PERCOLATION TEST DATA ............................................................................................. 27 <br />7.0 CLOSURE ................................................................................................................................. 28 <br />APPENDIX A ........................................................................................................................................ 30 <br />Site Exploration .................................................................................................................................. 30 <br /> Plate A Boring and Percolation Test Location Plan <br /> Plates B-1 and B-2 Field Logs of Borings <br /> Plates B-P1 and B-P2 Field Logs of Percolation Borings