My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CITY PROJECT - 1821 & 1823 E Chestnut Ave - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Chestnut Ave
>
1821 E Chestnut Ave
>
CITY PROJECT - 1821 & 1823 E Chestnut Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 11:14:23 AM
Creation date
2/24/2026 11:13:50 AM
Metadata
Fields
Template:
Plan
Permit Number
20184680
20184681
30148144
30148145
40139793
40139794
101121878
101121879
Full Address
1821 E Chestnut Ave
1823 E Chestnut Ave
Street Number
1823
Street Direction
E
Street Name
Chestnut
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 <br />2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 <br />Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 1 <br />1.0 INTRODUCTION <br />This Soils Report presents the results of ASE's geotechnical investigation for the proposed community hub <br />building (the Building), located within the Santa Ana Zoo, at 1801 East Chestnut Avenue, in the City of Santa <br />Ana, California (the Site). The approximate location of the Site is shown on Figure 1, Site Location Map. The <br />purpose of this investigation was to evaluate the general subsurface soil conditions at the Site and provide <br />geotechnical recommendations for the design and construction of the Building. This Soils Report presents <br />the summary of the data collected, and the results of ASE's engineering evaluations/analyses, which <br />provide the basis for the formulation of relevant geotechnical conclusions and recommendations. <br /> <br />1.1 Project Outline <br />ASE understands that the following information is applicable at the time of this Soils Report preparation. <br />1.1.1 Building/Development Scope: <br />Based on the provided information, ASE understands that the Building will be located along the <br />east perimeter of the zoo, west of the overflow parking lot and north of lawn and proposed entry <br />village. The Building will be approximately 6000 square feet in planar dimension for education, <br />containing flex classrooms and a new holding building for ambassador animals. The other <br />appurtenant improvements are likely to include signage, landscape, pavement, utilities and <br />hardscape. <br /> <br />1.1.2 Structural Loading for Geotechnical Analyses: <br />In the absence of structural loading information and for the purpose of foundation analysis, ASE has <br />assumed that the Building will have a maximum concentrated column load (D+L) on the order of 40 <br />kips when supported by isolated pad footings or have a maximum line load (D+L) not exceeding <br />3,000 pounds per linear foot (plf) when supported on continuous spread footings. <br /> <br />For any new secondary structural improvements (i.e. site walls, trash enclosures, signs, etc.), ASE <br />has assumed a maximum concentrated column load (D+L) on the order of 10 kips when supported <br />by isolated pad footings or a maximum line load (D+L) not exceeding 1,500 pounds per linear foot <br />(plf) when supported on continuous spread footings. <br /> <br />Tolerable total and differential static settlements resulted from the above structural loadings on <br />the order of one-half (1/2) inch and one-quarter (1/4) inch over a 30-foot distance, respectively, <br />have been considered by ASE. <br /> <br />1.2 Scope of Investigation <br />In accomplishing the subject investigation, ASE's staff had performed the following geotechnical tasks:
The URL can be used to link to this page
Your browser does not support the video tag.