My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CITY PROJECT - 1821 & 1823 E Chestnut Ave - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Chestnut Ave
>
1821 E Chestnut Ave
>
CITY PROJECT - 1821 & 1823 E Chestnut Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 11:14:23 AM
Creation date
2/24/2026 11:13:50 AM
Metadata
Fields
Template:
Plan
Permit Number
20184680
20184681
30148144
30148145
40139793
40139794
101121878
101121879
Full Address
1821 E Chestnut Ave
1823 E Chestnut Ave
Street Number
1823
Street Direction
E
Street Name
Chestnut
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 <br />2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 <br />Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 28 <br />of water retention system construction may cause the percolation rates to reduce substantially, it is <br />not advisable to impose significant structural loading in these areas, from a geotechnical viewpoint. <br />• The rate of water transmission from the filter material to the soil will be limited the porosity <br />characteristics of the fabric wrap around the filter material. <br /> <br />7.0 CLOSURE <br />This report has been prepared for the exclusive use of the LOC Architects (the Client) and their design <br />consultants for use in the design and construction of the proposed community hub building. The report has <br />not been prepared for use by other parties and may not contain sufficient information for purposes of <br />other parties. <br /> <br />The Client or its representatives are responsible for ensuring the information and recommendations <br />contained in this report are brought to the attention of the project engineers and architects, incorporated <br />into the project plans, and implemented by project contractors. This report should be reflected on project <br />grading plans as a part of the project specifications. <br /> <br />We request and recommend notification should any of the following occur: <br />1. Final plans for site development indicate utilization of areas not originally proposed for construction. <br />2. Structural loading conditions vary from those utilized for evaluation and preparation of this report. <br />3. The Site is not developed within 12 months following the date of this report. <br /> <br />If changes or delays do occur, this office should be notified and provided with finalized plans of site <br />development for our review to enable us to provide the necessary recommendations for additional work <br />and/or updating of the report. Any charges for such review and necessary recommendations would be at <br />the prevailing rate at the time of performing review work. <br /> <br />The findings contained in this report are based upon our evaluation and interpretation of the information <br />obtained from the limited number of test borings and the results of laboratory testing and engineering <br />analysis. As part of the engineering analysis, it has been assumed and is expected that the geotechnical <br />conditions existing across the area of study are similar to those encountered in the test excavations. <br />However, no warranty is expressed or implied as to the conditions at locations or depths other than those <br />excavated. Should conditions encountered during construction differ significantly from those described in <br />this report, this office should be contacted immediately for recommendations prior to continuation of <br />work. Our findings and recommendations were obtained in accordance with generally accepted current <br />professional principles and local practice in geotechnical engineering and reflect our best professional <br />judgment. We make no other warranty, either express or implied. <br />
The URL can be used to link to this page
Your browser does not support the video tag.