Laserfiche WebLink
HORIZONTAL ASSEMBLY <br />ROOF TYPE C3: <br />BUILDING B ROOF 01 <br />LAYER 1: RF-01 <br />LAYER 2: 1/4" DENSDECK <br />LAYER 3: 2.6" SARNATHERM <br />POLYISOCYANURATE INSULATION <br />LAYER 4: 2.6" SARNATHERM <br />POLYISOCYANURATE INSULATION <br />LAYER 5: PLYWOOD PER STRUCTURAL <br />LAYER 6: FRAMING PER STRUCTURAL <br />LAYER 7: 5/8" TYPE X GWB WHERE OCCURS <br />NOTES: <br />1' - 10 3/4" <br />HORIZONTAL ASSEMBLY <br />ROOF TYPE C4: <br />BUILDING B ROOF 02 <br />LAYER 1: RF-01 <br />LAYER 2: 1/4" DENSDECK <br />LAYER 3: 2.6" SARNATHERM <br />POLYISOCYANURATE INSULATION <br />LAYER 4: 2.6" SARNATHERM <br />POLYISOCYANURATE INSULATION <br />LAYER 5: PLYWOOD PER STRUCTURAL <br />LAYER 6: FRAMING PER STRUCTURAL <br />LAYER 7: 5/8" TYPE X GWB WHERE OCCURS <br />NOTES: <br />1' - 6 1/2" <br />2' - 0" <br />2' - 0" <br />LIGHT <br />FITTING PER <br />SCHEDULE <br />TO REPLACE <br />FULL <br />CEILING TILE HVAC <br />REGISTER PER <br />SCHEDULE <br />TO REPLACE <br />FULL CEILING <br />TILE <br />VELUX <br />DIFFUSER TO <br />REPLACE <br />CEILING TILE <br />HORIZONTAL ASSEMBLY <br />ROOF TYPE C2: <br />BUILDING A ROOF <br />LAYER 1: RF-01 <br />LAYER 2: 1/4" DENSDECK <br />LAYER 3: 2.6" SARNATHERM <br />POLYISOCYANURATE INSULATION <br />LAYER 4: 2.6" SARNATHERM <br />POLYISOCYANURATE INSULATION <br />LAYER 5: PLYWOOD PER <br />STRUCTURAL <br />LAYER 6: FRAMING PER STRUCTURAL <br />LAYER 7: IF-01 WHERE OCCURS <br />NOTES: <br />HORIZONTAL ASSEMBLY <br />CEILING TYPE B4: <br />PLYWOOD CEILING <br />LAYER 1: FRAMING PER <br />STRUCTURAL <br />LAYER 2: FURRING STRIPS <br />FASTENED WITH GRK FIN TRIM <br />SCREWS <br />LAYER 3: MW-01 <br />NOTES: <br />HORIZONTAL ASSEMBLY <br />ROOF TYPE C1: <br />BUILDING A ROOF AT MPR <br />LAYER 1: RF-01 <br />LAYER 2: 1/4" DENSDECK <br />LAYER 3: 2.6" SARNATHERM <br />POLYISOCYANURATE INSULATION <br />LAYER 4: 2.6" SARNATHERM <br />POLYISOCYANURATE INSULATION <br />LAYER 5: PLYWOOD PER STRUCTURAL <br />LAYER 6: FRAMING PER STRUCTURAL <br />LAYER 7: PET CLIPS PER POLYSORB <br />MANUFACTURER INSTALLED @ 24" <br />OC <br />LAYER 7: FC-01 <br />NOTES: <br />POLYSORB WHERE OCCURS <br />RUN CONDUIT <br />CLOSE TO TOP <br />OF CEILING <br />HORIZONTAL ASSEMBLY <br />CEILING TYPE B2: <br />EXTERIOR TILE SOFFIT <br />LAYER 1: FRAMING PER <br />STRUCTURAL <br />LAYER 2: WRB-01 <br />LAYER 3: 1/2" CEMENT <br />BACKERBOARD <br />LAYER 4: WRB-02 <br />LAYER 5: THIN SET MORTAR <br />LAYER 6: TI-01 <br />NOTES: <br />6 3/4" <br />HORIZONTAL ASSEMBLY <br />CEILING TYPE B3: <br />ACT CEILING <br />LAYER 1: ACT-01 <br />NOTES: <br />HORIZONTAL ASSEMBLY <br />ROOF TYPE C5: <br />BUILDING B ELEVATOR ROOF <br />LAYER 1: RF-01 <br />LAYER 2: 1/4" DENSDECK <br />LAYER 3: 2.6" SARNATHERM <br />POLYISOCYANURATE INSULATION <br />LAYER 4: 2.6" SARNATHERM <br />POLYISOCYANURATE INSULATION <br />LAYER 5: PLYWOOD PER STRUCTURAL <br />LAYER 6: FRAMING PER STRUCTURAL <br />NOTES: <br />HORIZONTAL ASSEMBLY <br />CEILING TYPE B1: <br />GWB CEILING <br />LAYER 1: FRAMING PER <br />STRUCTURAL <br />LAYER 2: 5/8" TYPE X GWB, <br />NOTES: <br />FINISH PER PLANS, IF-03 WHERE <br />OCCURS <br />6 1/8" <br />HORIZONTAL ASSEMBLY <br />FLOOR TYPE A1: <br />CONCRETE SLAB ON GRADE <br />LAYER 1: CONCRETE AND <br />UNDERLAYMENT PER <br />STRUCTURAL <br />NOTES: FINISH PER PLANSTHICKNESS PER STRUCTURAL <br />HORIZONTAL ASSEMBLY <br />FLOOR TYPE A2: <br />CONCRETE METAL DECK AT <br />LEVEL 02 <br />LAYER 1: FINISH PER PLANS <br />LAYER 2: LIGHT WEIGHT <br />CONCRETE PER STRUCTURAL <br />LAYER 3: METAL DECK PER <br />STRUCTURAL <br />NOTES: FINISH PER PLANS <br />6 1/4" <br />PROJECT <br />COPYRIGHT LOC, INC <br />ORIGINAL SHEET SIZE: 42" X 30" <br />LOC <br />CLIENT: <br />ARCHITECT: <br />CONSULTANTS: <br />PREPARED UNDER THE SUPERVISION OF: <br />ALI JEEVANJEE <br />LOC ARCHITECTS DATE <br />REVIEWED FOR CONSTRUCTABILITY: <br />SEAN THOMAS <br />PRINCIPAL CIVIL ENGINEER <br />RCE NO.: 80470 <br />DATE <br />RECOMMENDED FOR CONSTRUCTION: <br />JASON GABRIEL <br />PRINCIPAL CIVIL ENGINEER <br />RCE NO.: 62968 <br />DATE <br />3/28/2025 6:02:04 PM <br />2308 <br />TYPICAL <br />ASSEMBLIES <br />MARCH 28, 2025 <br />PLAN CHECK <br />SUBMITTAL 02 <br />A8.2 <br />SANTA ANA ZOO <br />1821 & 1823 E CHESTNUT AVE, SANTA <br />ANA, CA 92701 <br />KPFF <br />STRUCTURAL ENGINEER <br />LOC ARCHITECTS <br />KPFF <br />CIVIL ENGINEER <br />BORDER <br />LANDSCAPE ARCHITECT <br />ABRARI AND ASSOCIATES <br />MEP ENGINEER <br />ASSOCIATED SOILS ENGINEERING <br />GEOTECHNICAL ENGINEER <br />700 S. FLOWER, SUITE 2100 <br />LOS ANGELES, CA 90017 <br />213 372 5111 <br />Ramzi.hodali@kpff.com <br />700 S. FLOWER, SUITE 2100 <br />LOS ANGELES, CA 90017 <br />213 372 5111 <br />Sharad.Ganju@kpff.com <br />724 S. SPRING ST, SUITE 701 <br />LOS ANGELES, CA 90014 <br />213 372 5111 <br />Darren@border-la.com <br />1713 S. STANDARD AVE <br />GLENDALE, CA 91201 <br />818 956 1900 <br />Telma@abrari.com <br />2860 WALNUT AVE. <br />SIGNAL HILL, CA 90755 <br />562 897 2749 <br />Ted@associatedsoils.com <br />3203 E. 4TH ST <br />LOS ANGELES, CA 90063 <br />213 537 0480 <br />Office@loc-arch.com <br />1801 E. CHESTNUT AVE. <br />SANTA ANA, CA 92701 <br />714 647 6575 <br />Efisher@santa-ana.org <br />SANTA ANA ZOO <br />EDUCATION HUB <br />MARCH 28, 2025 <br />25 <br />3" = 1'-0"9ROOF TYPE C3 <br />3" = 1'-0"10ROOF TYPE C4 <br />1/2" = 1'-0"12ACT-01 PATTERN DETAIL <br />3" = 1'-0"8ROOF TYPE C2 <br />3" = 1'-0"5CEILING TYPE B3 <br />3" = 1'-0"7ROOF TYPE C1 <br />3" = 1'-0"6SOFFIT TYPE B4 <br />3" = 1'-0"4CEILING TYPE B2 <br />3" = 1'-0"11ROOF TYPE C5 <br />3" = 1'-0"3CEILING TYPE B1 <br />No.Description Date <br />3" = 1'-0"1FLOOR TYPE A1 <br />3" = 1'-0"2FLOOR TYPE A2