My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
625 S Cypress Ave - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Cypress Ave
>
625 S Cypress Ave
>
625 S Cypress Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 11:14:09 AM
Creation date
2/24/2026 11:13:50 AM
Metadata
Fields
Template:
Plan
Permit Number
20183537
30147573
40139358
101120230
Full Address
625 S Cypress Ave
Street Number
625
Street Direction
S
Street Name
Cypress
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
625 Cypress Avenue <br />Geotechnical Investigation <br /> <br />Project No. W1895-88-01 - 1 - April 23, 2024 <br />GEOTECHNICAL INVESTIGATION <br />1. PURPOSE AND SCOPE <br />This report presents the results of a geotechnical investigation for the proposed structural retrofit <br />improvements to the existing fire station located at 625 Cypress Avenue in the City of Santa Ana, <br />California (see Vicinity Map, Figure 1). The purpose of the investigation was to evaluate subsurface soil <br />and geologic conditions underlying the site and, based on conditions encountered, to provide <br />conclusions and recommendations pertaining to the geotechnical aspects of proposed design and <br />construction. <br />The scope of this investigation included a site reconnaissance, field exploration, laboratory testing, <br />engineering analysis, and the preparation of this report. The site was explored on March 4, 2023, by <br />excavating two 8-inch-diameter borings using a truck-mounted hollow-stem auger drilling machine to <br />depths of approximately 25 and 61 feet beneath the ground surface. In addition, a 4-inch-diameter <br />boring was excavated to a depth of approximately 5 feet below ground surface using hand auger <br />equipment. Percolation testing was performed in borings B2 and B3 to determine the infiltration rate <br />of site soils. The site was further explored on March 13 and 14, 2024, by excavating two test pits to <br />depths of approximately 15½ feet below the ground surface using hand tools and mechanical <br />equipment. The test pits were excavated at the existing building foundations to verify footing depth <br />and dimensions. The approximate locations of the exploratory borings and test pits are depicted on the <br />Site Plan (see Figure 2). A detailed discussion of the field investigation, including boring and test pits <br />logs, is presented in Appendix A. <br />Laboratory tests were performed on selected soil samples obtained during the investigation to <br />determine pertinent physical and chemical soil properties. Appendix B presents a summary of the <br />laboratory test results. <br />The recommendations presented herein are based on analysis of the data obtained during the <br />investigation and our experience with similar soil and geologic conditions. References reviewed to <br />prepare this report are provided in the List of References section. <br />If project details vary significantly from those described herein, Geocon should be contacted to <br />determine the necessity for review and possible revision of this report.
The URL can be used to link to this page
Your browser does not support the video tag.