My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
625 S Cypress Ave - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Cypress Ave
>
625 S Cypress Ave
>
625 S Cypress Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 11:14:09 AM
Creation date
2/24/2026 11:13:50 AM
Metadata
Fields
Template:
Plan
Permit Number
20183537
30147573
40139358
101120230
Full Address
625 S Cypress Ave
Street Number
625
Street Direction
S
Street Name
Cypress
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
625 Cypress Avenue <br />Geotechnical Investigation <br /> <br />Project No. W1895-88-01 - 16 - April 23, 2024 <br />7.1.11 Excavations up to 7 feet in vertical height may be required for the construction of new <br />foundations for proposed improvements. Performing open excavations adjacent to or deeper <br />than the existing foundation system could potentially remove lateral support and/or <br />undermine the existing foundation. Excavation for construction of new foundations <br />immediately adjacent to existing foundations may require special excavation measures in <br />order to maintain lateral support of the existing adjacent foundation. Recommendations for <br />Temporary Excavations are provided in Section 7.10. <br />7.1.12 Based on the results of the percolation testing, a stormwater infiltration system is considered <br />feasible for this project. Recommendations for infiltration are provided in the Stormwater <br />Infiltration section of this report (see Section 7.12). <br />7.1.13 Once the design and foundation loading configuration for the proposed structure proceeds <br />to a more finalized plan, the recommendations within this report should be reviewed and <br />revised, if necessary. Based on the final foundation loading configurations, the potential for <br />settlement should be re-evaluated by this office. <br />7.1.14 Any changes in the design, location or elevation, as outlined in this report, should be <br />reviewed by this office. Geocon should be contacted to determine the necessity for review <br />and possible revision of this report. <br />7.1.15 The most recent ASTM standards apply to this project and must be utilized, even if older <br />ASTM standards are indicated in this report. <br />7.2 Soil and Excavation Characteristics <br />7.2.1 The in-situ soils can be excavated with moderate effort using conventional excavation <br />equipment. Some caving should be anticipated in unshored excavations, especially where <br />granular soils are encountered. <br />7.2.2 It is the responsibility of the contractor to ensure that all excavations and trenches are <br />properly shored and maintained in accordance with applicable OSHA rules and regulations to <br />maintain safety and maintain the stability of existing adjacent improvements. <br />7.2.3 All onsite excavations must be conducted in such a manner that potential surcharges from <br />existing structures, construction equipment, and vehicle loads are resisted. The surcharge <br />area may be defined by a 1:1 projection down and away from the bottom of an existing <br />foundation or vehicle load. Penetrations below this 1:1 projection will require special
The URL can be used to link to this page
Your browser does not support the video tag.