Laserfiche WebLink
625 Cypress Avenue <br />Limited Geotechnical Investigation <br /> <br />Project No. W1895-88-01 April 23, 2024 <br />LIMITATIONS AND UNIFORMITY OF CONDITIONS <br /> <br />1. The firm that performed the geotechnical investigation for the project should be retained to <br />provide testing and observation services during construction to provide continuity of <br />geotechnical interpretation and to check that the recommendations presented for <br />geotechnical aspects of site development are incorporated during site grading, construction of <br />improvements, and excavation of foundations. If another geotechnical firm is selected to <br />perform the testing and observation services during construction operations, that firm should <br />prepare a letter indicating their intent to assume the responsibilities of project geotechnical <br />engineer of record. A copy of the letter should be provided to the regulatory agency for their <br />records. In addition, that firm should provide revised recommendations concerning the <br />geotechnical aspects of the proposed development, or a written acknowledgement of their <br />concurrence with the recommendations presented in our report. They should also perform <br />additional analyses deemed necessary to assume the role of Geotechnical Engineer of Record. <br />2. The recommendations of this report pertain only to the site investigated and are based upon <br />the assumption that the soil conditions do not deviate from those disclosed in the investigation. <br />If any variations or undesirable conditions are encountered during construction, or if the <br />proposed construction will differ from that anticipated herein, Geocon Incorporated should be <br />notified so that supplemental recommendations can be given. The evaluation or identification <br />of the potential presence of hazardous or corrosive materials was not part of the scope of <br />services provided by Geocon Incorporated. <br />3. This report is issued with the understanding that it is the responsibility of the owner or his <br />representative to ensure that the information and recommendations contained herein are <br />brought to the attention of the architect and engineer for the project and incorporated into <br />the plans, and the necessary steps are taken to see that the contractor and subcontractors <br />carry out such recommendations in the field. <br />4. The findings of this report are valid as of the date of this report. However, changes in the <br />conditions of a property can occur with the passage of time, whether they be due to natural <br />processes or the works of man on this or adjacent properties. In addition, changes in applicable <br />or appropriate standards may occur, whether they result from legislation or the broadening of <br />knowledge. Accordingly, the findings of this report may be invalidated wholly or partially by <br />changes outside our control. Therefore, this report is subject to review and should not be relied <br />upon after a period of three years.