Laserfiche WebLink
Standard: <br />Hazard Level: <br />E/W VERTICAL SEISMIC FORCE DISTRIBUTION (Equivalent Lateral Force Procedure) <br />Input Parameters <br />Cs = Diaphragm Force @ each Level <br />WTotal =kips (Eqn 12.10-1, ASCE 7-16) <br />EBF =existing building reduction factor <br />kips (LRFD) <br />Vbase =kips (ASD)0.2SDSIwpx (Eqn 12.10-2, ASCE 7-16) <br />T =sec 0.4SDSIwpx (Eqn 12.10-3, ASCE 7-16) <br />k = per ASCE 41 sections 4 & 7 <br />SDS = <br />Ie = <br />Lateral Force @ each Level <br />Fx LRFD <br />R <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />S = <br />0 0.0 0.0 0.0 0.0 0.0 <br />126.0 2016 15.8 11.1 126.0 <br />0.0 Fx 0 0.0 <br />0 Fx 0 0 <br />0.0 Fx 0 0.0 <br />0 <br />0 <br />0 0 0 <br />0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 <br />0 00.0 <br />0 Fx <br />0 <br />0 0 <br />0.0 0.0 0 0 0 0 0 0 0 <br />0.0 0.0 0 0 0 0 0 0 0 <br />0 Fx 0 <br />0 Fx 0 0 <br />Fx 0 0 <br />0.0 0.0 0 0 0 0 0 <br />0.0 0 0 0 0 0 0 0 0 <br />0 <br />0 0 <br />0 00 Fx <br />kips <br />16 Min 27 19 <br />00 <br />0 0 <br />Fx <br />Fx <br />0 <br />55 <br />0 Fx 0 0 <br />00 0 0 0 <br />Input Parameters Lateral Force Diaphragm Force to ASCE 7-16 <br />Le <br />v <br />e <br />l <br />hSTORY hx wx wxhx <br />k Fx ASD wpx Fpx,min Fpx,max Fpx Control Fd ASD <br />kips kips Force kips <br />0 <br />wpx0.75 S wi <br />Vbase =16 <br />ft feet kips kip-ft kips kips kips kips <br />11 (Fpx)min = <br />0.15 (Fpx)max = <br />1.00 <br />1.09 <br />1.00 <br />Cvx = wxhx <br />k <br />Fx = CvxV <br />Cypress Fire Station <br /> No: 23005.00 <br />By: CHP/JS <br />Date: 5/17/23 Page: <br />Project : <br />0.0 0.0 0 <br />0 0 0 <br />0 <br />0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 0.0 <br />0.0 0.0 0 <br />0 <br />ASCE 7-16 <br />BSE-2E <br />2016 16 11 126 27 <br />0 0 0 0 0 <br />0.2 W <br />126 Fpx = S Fi <br />S wihi <br />k <br /> (without ρ or Ωo) <br />0 0 0 <br />Fd <br />16.0 126 <br />Seismic Force Distribution <br />0.0 0 0 0 0 0 <br />0.0 0.0 0 <br />16.0 <br />Printed on: 5/14/2024 at 3:07 PM 23005.10_Project Calculations_2021 IBC1.xlsx <br />19