Laserfiche WebLink
REF. <br />T <br />FC <br />-2 <br />T <br />FC <br />-4 <br />TFC-3 <br />T FC-1 <br />T <br />FC <br />-5 <br />1 <br />2 <br />3 <br />A B C D E F <br />FC <br />1 <br />FC <br />5 <br />16"x16" <br />14"x14" <br />12"x12" <br />12"x12" <br />10"ø <br />10"ø <br />14"x14"16"x18" <br />10"x8" <br />12"x12" <br />12"ø <br />12"ø <br />FC <br />3 <br />8"x8" <br />14"x8" <br />8"x8"8"x8" <br />10"x8" <br />8"ø <br />6"x6"8"x8" <br />10"x8" <br />6"ø <br />250 <br />CD-1 <br />(TYP. OF 3) <br />250 <br />CD-1 <br />(TYP. OF 3) <br />(TYP. OF 2) <br />217 <br />CD-2 <br />(TYP. OF 3) <br />1005 <br />RG-2 <br />390 <br />SD-1 <br />(TYP. OF 3) <br />1059 <br />RG-2 <br />130 <br />TG-1 <br />130 <br />TG-2 <br />160 <br />CD-3 <br />(TYP. OF 2) <br />54 <br />EG-2 <br />12"x12" <br />300 <br />SD-1 <br />(TYP. OF 4) <br />273 <br />RG-1 <br />12"x10" <br />OUTSIDE AIR <br />DUCT. <br />10"x8" OUTSIDE AIR <br />DUCT. <br />10"x8" OUTSIDE AIR <br />DUCT. <br />10"x8" OUTSIDE AIR <br />DUCT UP THRU THE <br />ROOF. <br />6"x6" OUTSIDE AIR <br />DUCT UP THRU THE <br />ROOF. <br />10"ø <br />14"x12"12"x14"12"x14"14"x12" <br />TRAINING ROOM <br />B <br />03 <br />MULTI-PURPOSE <br />ROOM A <br />02 <br />ENTRY / CHECK <br />IN OFFICE <br />01 <br />HALLWAY <br />04 <br />TRAINING ROOM <br />C <br />05 <br />HALLWAY <br />06 <br />WOMENS <br />07 <br />MENS <br />09 <br />OFFICE AND <br />BREAKROOM <br />10 <br />RESTROOM <br />11 <br />JANITOR <br />12 <br />8"ø CU <br />1 <br />41 <br />2 <br />3 <br />5 <br />200 <br />CD-1 <br />14 <br />" <br />x <br />1 <br />4 <br />" <br />(TYP. OF 4) <br />6"x6" <br />80 <br />CD-3 <br />150 <br />EG-1 <br />(TYP. OF 4) <br />2 <br />M2.0 <br />150 <br />TG-2 <br />8"ø <br />10"ø <br />8"ø <br />8"ø <br />12 <br />" <br />ø <br />8" <br />ø <br />8"ø <br />6 <br />EF <br />2 <br />7 <br />6"ø <br />570 <br />RG-2 <br />12"ø <br />10"x8" <br />10"ø <br />30"x30" CEILING ACCESS PANEL <br />550 <br />RG-2 <br />12"ø <br />10"ø <br />10"ø <br />10"ø <br />CU <br />4 <br />CU <br />2FC <br />4FC <br />2 <br />CU <br />3 <br />ROOF ACCESS <br />MULTI-PURPOSE <br />ROOM A <br />02 <br />FINISH FLOOR <br />0" <br />ROOF <br />15' -0" <br />3 <br />FINISH FLOOR <br />0' -0" <br />FINISH FLOOR <br />0' -0" <br />ROOF <br />15' -0" <br />ROOF <br />15' -0" <br />3 <br />CU <br />4 <br />CU <br />3 <br />CU <br />2 <br />CU <br />1 <br />Scale <br />Project number <br />Date <br />Drawn by <br />Jen Dunbar, AIA <br />phone: 310.435.3928 <br />12314 La Maida Street <br />Valley Village, CA 91607 <br />jen@dunbararchitecture.com <br />DUNBAR <br />ARCHITECTURE <br />As indicated <br />4/ <br />4 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />1 <br />1 <br />: <br />5 <br />1 <br />: <br />4 <br />7 <br /> <br />A <br />M <br />M2.0 <br />MECHANICAL NEW <br />FLOOR PLAN <br />23004 <br />CYPRESS STREET <br />FIRE STATION <br />REHABILITATION <br />CITY OF SANTA ANA <br />1/15/2025 <br />RM/EG <br />625 S. CYPRESS <br />1/4" = 1'-0"M2.0 <br />1 MECHANICAL FIRST FLOOR PLAN <br />KEY NOTES <br />1 OUTSIDE AIR VOLUME DAMPER SET @ 635 CFM <br />2 OUTSIDE AIR VOLUME DAMPER SET @ 290 CFM <br />3 OUTSIDE AIR VOLUME DAMPER SET @ 320 CFM <br />4 OUTSIDE AIR VOLUME DAMPER SET @ 300 CFM <br />5 OUTSIDE AIR VOLUME DAMPER SET @ 120 CFM <br />6 12"X12" EXHAUST AIR DUCT UP THRU THE ROOF TO EXHAUST FAN EF-1 <br />7 6"⌀EXHAUST DUCT UP THRU THE ROOF. TERMINATE WITH ROOF CAP. <br />1/4" = 1'-0"M2.0 <br />2 OUTDOOR UNITS LAYOUT SECTION <br />No. Description Date <br />1 75% CD 3/15/2024 <br />2 90% CD 5/02/2024 <br />3 PERMIT SET 5/17/2024 <br />4 BACK CHECK SET 1/15/2025 <br />5 BACK CHECK SET_V2 4/08/2025 <br />GENERAL NOTES <br />1. CONTRACTOR SHALL PROVIDE NEMA 3R WEATHERPROOF WIREMOLD OR EQUAL, <br />WITH SCREW COVER TO PROTECT REFRIGERANT PIPING. COORDINATE LAYOUT <br />AND LOCATIONS WITH ARCHITECT PRIOR TO ROUGH-IN, INSTALLATION, AND <br />PURCHASING OF MATERIAL. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR <br />LAYOUT FOR APPROVAL. <br />2. IN ADDITION TO TESTING AND ADJUSTING, BEFORE A NEW SPACE-CONDITIONING <br />SYSTEM SERVING A BUILDING OR SPACE IS OPERATED FOR NORMAL USE, <br />BALANCETHE SYSTEM IN ACCORDANCE WITH THE PROCEDURES DEFINED BY THE <br />TESTING ADJUSTING AND BALANCING BUREAU NATIONAL STANDARDS; <br />ASSOCIATED AIR BALANCE COUNCIL NATIONAL STANDARDS OR AS APPROVED BY <br />THE ENFORCING AGENCY. <br />3. HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS ( INCLUDING HYDRONIC <br />SYSTEMS) SHALL BE BALANCED IN ACCORDANCE WITH ONE OF THE FOLLOWING <br />METHODES; AABC,ACCA MANUAL B, ASHRAE 111, NEBB PROCEDURAL STANDARDS <br />OR SMACNA SYSTEMS TESTING.