Laserfiche WebLink
SCALE: <br />SCALE: <br />SCALE:SCALE: <br />SCALE: <br />SCALE: <br />SWITCH, OUTLET, <br />CONTROL <br />TOP OF THERMOSTAT, <br />24" MAX. <br />34 <br />" <br /> <br />M <br />A <br />X <br />. <br />48 <br />" <br /> <br />M <br />A <br />X <br />. <br />OUTLET OR SWITCH <br />BOTTOM OF <br />15" MIN. <br />F.F.L. <br />46 <br />" <br /> <br />M <br />A <br />X <br />. <br /> <br />S <br />I <br />D <br />E <br /> <br />A <br />P <br />P <br />R <br />O <br />A <br />C <br />H <br />44 <br />" <br /> <br />M <br />A <br />X <br />. <br /> <br />F <br />R <br />O <br />N <br />T <br /> <br />A <br />P <br />P <br />R <br />O <br />A <br />C <br />H <br />SWITCH, OUTLET, <br />CONTROL <br />TOP OF THERMOSTAT, <br />NOTES <br />1. SUPPORTS SHALL BE INSTALLED A MAXIMUM 8'-0" O.C. AND AT <br />EACH CHANGE OF DIRECTION OF PIPING. <br />ROOF <br />MOUNTED <br />PIPING <br />"DURA-BLOCK" <br />SUPPORT SYSTEM <br />4" MIN. A.F.R. <br />RUBBER BASE <br />LOW VOLTAGE WIRING WIRING <br />LOW VOLTAGE <br />THERMOSTAT <br />NOTES: <br />DISCONNECT <br />208V-1Ø <br />FURNISHED & INSTALLED BY <br />INSTALLED BY ELECT. CONTRACTOR. <br />FURNISHED BY MECH. CONTRACTOR & <br />FURNISHED & INSTALLED BY <br />ELECT. CONTRACTOR <br />MECH. CONTRACTOR <br />IN 1/2" CONDUIT <br />1. MECHANICAL CONTRACTOR SHALL FIELD COORDINATE WITH <br />ELECTRICAL CONTRACTOR CONDUIT ROUTING AND INSTALLATION <br />DISCONNECT <br />208V-1Ø <br />USE VIBRATION ISOLATORS <br />MASON TYPE SLF WITH <br />APPROPRIATE SEISMIC <br />RESTRAINTS. <br />UNISTRUT CHANNEL <br />OIL TRAP <br />RETURN AIR <br />RETURN <br />PLENUM LINED <br />RETURN AIR <br />TRAP <br />FAN COIL ACCESS <br />DOOR MIN 30"x30" <br />3/4" SECONDARY CONDENSATE <br />DRAIN IN VISIBLE LOCATION. <br />CONTRACTOR TO COORDINATE <br />LOCATION WITH OWNER/ARCHITECT <br />3/4" PRIMARY <br />CON. DRAIN <br />COND. DRAIN TO LAVATORY <br />TAILPIECE OR APPROVED RECEPTOR <br />SUPPLY AIR <br />SUPPLY <br />PLENUM LINED <br />ONE HOUR RATING <br />ANCHOR PTS "A" <br />UNISTRUT CHANNEL <br />BRACKET <br />JOIST <br />1/4"Ø x 1-1/4" <br />HEX HEAD LAG BOLT <br />USE VIBRATION ISOLATORS <br />1/2" THICK ARMSTRONG <br />ARMAFLEX TYPE CLOSED <br />CELL FOAM WITH A STEEL <br />JACKET AT ALL <br />PENETRATIONS AND <br />SUPPORT POINTS. <br />REFRIGERANT SUCTION <br />AND LIQUID LINES <br />RS <br />RS <br />RL <br />RL <br />FLEXIBLE <br />CONNECTION <br />FC <br />- <br />CU <br />- <br />(FOR REFERENCE) <br />CU <br />-- <br />NONE <br />SQUARE TO ROUND <br />STEEL LOCKING STRAP <br />CEILING <br />DUCT <br />TRANSITION <br />S.M. DUCT <br />STRAP <br />4" WIDE SHEET <br />OPPOSED BLADE <br />DAMPER <br />SQUARE TO ROUND <br />ADAPTER <br />CSD <br />ACOUSTICAL FLEX. TO STRUCTURE <br />12GA. WIRE <br />NONE <br />ANCHORED TO <br />ROOF LEVEL PAD <br />(TYP. OF 4) <br />TO FAN COIL UNIT <br />REFRIGERANT LINES <br />LEVEL PAD GROUND <br />NOTE: <br />EXTERIOR GAS LINE TO HAVE 3/4" ARMAFLEX INSULATION WRAPPED <br />WRAPPED W/ ALUMINUM JACKETING AND VAPOUR SEALED. <br />M <br />M <br />M <br />E <br />E <br />E <br />E <br />WIRING LEGEND <br />ME <br />M <br />E <br />E <br />E <br />E <br />E <br />NONENONE <br />NONE <br />NONE <br />CEILING DIFFUSER1 <br />CONDENSING UNIT DETAIL ON THE GROUND4 <br />SPLIT SYSTEM WIRING DIAGRAM3REFRIGERANT PIPING SUPPORT DETAIL5 <br />THERMOSTAT MOUNTING DETAIL6 HORIZONTAL FAN COIL UNIT DETAIL2 <br />Scale <br />Project number <br />Date <br />Drawn by <br />Jen Dunbar, AIA <br />phone: 310.435.3928 <br />12314 La Maida Street <br />Valley Village, CA 91607 <br />jen@dunbararchitecture.com <br />DUNBAR <br />ARCHITECTURE <br />As indicated <br />4/ <br />4 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />1 <br />1 <br />: <br />5 <br />1 <br />: <br />4 <br />8 <br /> <br />A <br />M <br />M4.2 <br />MECHANICAL <br />DETAILS <br />23004 <br />CYPRESS STREET <br />FIRE STATION <br />REHABILITATION <br />CITY OF SANTA ANA <br />1/15/2025 <br />RM/EG <br />625 S. CYPRESS <br />No. Description Date <br />1 75% CD 3/15/2024 <br />2 90% CD 5/02/2024 <br />3 PERMIT SET 5/17/2024 <br />4 BACK CHECK SET 1/15/2025 <br />5 BACK CHECK SET_V2 4/08/2025