Laserfiche WebLink
Scale <br />Project number <br />Date <br />Drawn by <br />Jen Dunbar, AIA <br />phone: 310.435.3928 <br />12314 La Maida Street <br />Valley Village, CA 91607 <br />jen@dunbararchitecture.com <br />DUNBAR <br />ARCHITECTURE <br />As indicated <br />5/ <br />1 <br />6 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />3 <br />: <br />3 <br />0 <br />: <br />1 <br />7 <br /> <br />P <br />M <br />P0.1 <br />PLUMBING <br />GENERAL NOTES, <br />ABBREIVIATIONS <br />AND SYMBOLS23004 <br />CYPRESS STREET <br />FIRE STATION <br />REHABILITATION <br />CITY OF SANTA ANA <br />5/17/2024 <br />Author <br />625 S. CYPRESS <br />GENERAL NOTES <br />1. ALL WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLE CODES: <br />• 2022 CALIFORNIA PLUMBING CODE (CPC) <br />• 2022 CALIFORNIA BUILDING CODE <br />• 2022 CALIFORNIA MECHANICAL CODE <br />• 2022 CALIFORNIA ELECTRICAL CODE <br />• 2022 CALIFORNIA FIRE CODE <br />• CALIFORNIA STATE FIRE MARSHAL <br />• NFPA STANDARDS <br />• 2022 CALIFORNIA ENERGY CODE <br />• 2022 CALIFORNIA GREEN BUILDING STADARDS CODE (CGBSC) <br />• 2010 ADA STANDARS <br />• CALIFORNIA ADMINISTRATIVE CODES, TITLE 17 AND 24. <br />2.EXISTING CONDITIONS ARE BASED ON "AS-BUILT" DRAWINGS AND/OR LIMITED FIELD <br />VERIFICATIONS. THE CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS AT NO <br />ADDITIONAL EXPENSE TO THE PROJECT. NO ADDITIONAL COMPENSATION WILL BE <br />PROVIDED FOR ANY EXTRAS DUE TO THE CONTRACTO'S FAILURE TO VISIT THE PROJECT <br />SITE AND/OR PDETERMINATION OF EXISTING CONDITIONS PRIOR TO SUBMITTING THE BID. <br />ANY DISCREPANCIES SHALL BE IMMEDIATELY REPORTED TO THE OWNER FOR <br />RESOLUTION. <br />3.CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE INCIDENTAL DEMOLITION WORK <br />PRIOR TO BIDDING AND COMMENCEMENT OF WORK. THE CONTRACTOR IS RESPONSIBLE <br />FOR DEMOLITION OF ALL EXISTING EQUIPMENT AS REQUIRED FOR THE <br />INSTALLATION/CONSTRUCTION OF NEW WORK. <br />4.CONTRACTOR SHALL COORDIANTE WITH ALL OTHER TRADES FOR CLEARANCES AND <br />WORK INCLUDED PRIOR TO START OF WORK. <br />5.KEEP ALL PIPING CLEAR FROM LOAD BEARING FOOTINGS. <br />6.REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS, MOUNTING HEIGHTS, AND <br />COLORS OF ALL PLUMBING FIXTURES. <br />7.2019 CALIFORNIA GREEN BUILDING STADARDS CODE 5.303.6. PLUMBING FIXTURES AND <br />FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2019 CALIFORNIA PLUMBING <br />CODE AND SHALL MEET THE APPLICABLE STANDARDS REFERENCED IN TABLE 1701.1 OF <br />THE 2019 CPC AND IN CHAPTER 6 OF THE 2019 CGBSC). <br />8.ALL VENT THRU ROOF SHALL BE PLACED AT A MINIMUM OF THREE FEET VERTICALLY AND <br />TEN FEET HORIZONTALLY FROM FRESH AIR INTAKES, WINDOWS, DOORS OR OTHER <br />OPENINGS. <br />9.ALL SHUT OFF MECHANICAL/PLUMBING CONTROL SHUT OFF VALVES NEED TO BE <br />CONVENIENTLY LOCATED ABOVE THE CORRIDOR. <br />10.PROVIDE AND INSTALL ACCESS PANELS TO ALLOW ACCESS TO VALVES, EQUIPMENT, ETC. <br />LOCATED ABOVE INACCESSIBLE CEILINGS AND WALL CAVITIES. ALL WALL MOUNT ACCESS <br />PANELS SHALL BE STAINLESS STEEL DOORS AND ALL CEILINGS PAINTED. <br />• PANELS TO BE 12" X 12" OR AS REQUIRED. <br />11.ALL SANITARY LINES AND PLUMBING FIXTURES ON THE PROJECT SHALL HAVE AN <br />APPROVED MEANS OF SEWAGE BACKFLOW PREVENTION. FIXTURE SPECIFIC BACKFLOW <br />PREVENTION INCLUDING AIR GAPS AND VACUMM BREAKERS ARE AN ACCEPTABLE MEANS <br />OF BACKFLOW PREVENTION. <br />12.CLEANOUTS SHALL BE INSTALLED PER 2019 CALIFORNIA PLUMBING CODE SECTION 707, <br />719, AND 803. <br />13.INSTALL SANITARY PIPING 3" OR SMALLER AT A SLOPE OF 1/4" PER FOOT AND SANITARY <br />PIPING 4" AND LARGE AT A SLOPE OF 1/8" PER FOOT. SLOPE OF BUILDING SEWERS SHALL <br />NOT BE LESS THAN 2% UNLESS OTHERWISE NOTED. <br />14.FLOOR AND TRENCH DRAINS SHALL BE IN ACCORDANCE WITH ASME A112.6.3. <br />15.ALL FAUCETS IN PUBLIC RESTROOMS SHALL BE SELF-CLOSING OR SEL=CLOSING <br />METERING FAUCETS. <br />16.PUBLIC LAVATORIES SHALL HAVE CONTROLS TO LIMIT THE WATER TEMPERATURE TO 100 <br />DEGREES FAHRENHEIT. <br />17.WATER PIPE AND FITTINGS WITH A LEAD CONTENT WHICH EXCEEDS 0.25% SHALL BE <br />PROHIBITED IN SYSTEMS CONVEYING POTABLE WATER. <br />18.ALL HOSE BIBBS,WALL HYDRANTS AND JANITORIAL SERVICE SINKS SHALL BE EQUIPPED <br />ITH AN APPROVED,PROPERLY INSTALLED ATMOSPHERIC TYPE VACUUM BREAKER. <br />19.ALL WATER CONNECTIONS TO HVAC EQUIPMENT SHALL BE PROTECTED BY AN APPROVED, <br />REDUCEDUCED PRESSURE BACKFLOW PREVENTION DEVICES. DEVICES SHALL BE <br />ACCESSIBLE FOR TEST AND MAINTENANCE. PROVIDE FUNNEL DRAIN AND INDIRECT <br />WASTE PIPING FOR BACKFLOW DEVICES AND DISTANT FROM FLOOR SINKS. <br />20.ALL AFFECTED POTABLE WATERPIPING SHALL BE DISINFECTED USING PROCEDURES <br />PRESCRIBED IN THE 2019 CALIFORNIA PLUMBING CODE SECTIONS 609.9(1) THROUGH <br />609.9(4). THE METHID TO BE FOLLOWED SHALL BE THAT PRESCRIBED BY THE OWNER OR IN <br />CASE NO METHOD IS PRESRIBED BY IT, THE FOLLOWING. <br />(1)THE PIPE SYSTEM SHALL BE FLUSHED WITH CLEAN, POTABLE WATER UNTIL <br />POTABLE WATER APPEARS AT THE POINTS OF THE OUTLET. <br />(2)THE SYSTEM OR PARTS THEREOF SHALL BE FILLED WITH A WATER CHLORINE <br />SOLUTION CONTAINING NO LESS THAN 50 PARTS PER MILLION OF CHLORINE, AND <br />THE SYSTEM OR PART THEREOF SHALL BE VALVED-OFF AND ALLOWED TO STAND <br />FOR 24 HOURS; OR, THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A <br />WATER-CHLORINE SOLUTION CONTAINING NOT LESS THAN 200 PARTS PER MILLION <br />OF CHLORINE AND ALLOWED TO STAND FOR 3 HOURS. <br />(3)FOLLOWING THE ALLOWED STANDING TIME, THE SYSTEM SHALL BE FLUSHED WITH <br />CLEAN, POTABLE WATER UNTIL THE CHLORINE RESIDUAL IN THE FLUSHING WATER. <br />(4)THE PROCEDURE SHALL BE REPEATED WHERE IT IS SHOWN BY A <br />BACTERIOLOGICAL EXAMINATION MADE BY AN APPROVED AGENCY THAT <br />CONTAMINATION PERSISTS IN THE SYSTEM. <br />21.ALL DOMESTIC HOT WATER PIPING SHALL BE INSULATED AS REQUIRED BY CALIFORNIA <br />ENERGY COMMISSION TABLE 123-A OF THE BUILDING ENERGY EFFICIENCY STANDARDS, <br />INSULATION SHALL HAVE A FIRE HAZARD CLASSIFICATION 25/30 COMPOSITE RATING. <br />PIPE SIZE INSULATION THICKNESS INSULATION VALUE <br /><1"1" K FACTOR = 0.25 <br />1 1/4"1 1/2" K FACTOR = 0.25 <br />1 1/2"1 1/2" K FACTOR = 0.25 <br />2">2" K FACTOR = 0.25 <br />22.CIRCULATING HGOT WATER SYSTEMS SHALL BE EQUIPPED WITH A CONTROL CAPABLE OF <br />AUTOMATICALLY TURNING OFF THE CIRCULATING PUMPS WHEN HOT WATER IS NOT <br />REQUIRED (TIMECLOCK). <br />23.ALL SERVICE WATER HEATING EQUIPMENT TO BE IN COMPLIANCE WITH THE CALIFORNIA <br />ENERGY COMMSSION (CEC) REQUIREMENTS AND BE SO LABELED. <br />24.COORDINATE WITH ELECTRICAL TRADE PRIOR TO ORDERING EQUIPMENT FOR AVAILABLE <br />VOLTAGES AT EQUIPMENT LOCATIONS. <br />25.DO NOT USE METALLIC GAS LINES TO GROUND ELECTRICAL SYSTEM. <br />26.COORDINATE ALL SLAB PENETRATIONS WITH GENERAL CONTRACTOR PRIOR TO <br />CONSTRUCTION. MAINTAIN A MINIMUM OF 2" CLEARANCE FROM THE EDGE OF THE SLAB <br />OPENING TO ANY STRUCTURAL MEMBERS AND PIPES. <br />27.UNLESS SPECIFICALLY SHOWN ON THE STRUCTURAL PLANS, NO STRUCTURAL MEMBER <br />SHALL BE CUT, NEITHER DRILLED, NOR NOTCHED WITHOUT PRIOR WRITTEN <br />AUTHORIZATION FROM THE STRUCTURAL ENGINEER AND OWNER. <br />28.SLEEVE OR CORE-DRILL FLOOR SLABS, WALLS, ETC. AS REQUIRED FOR PIPING AND FIRE <br />STOP OPENING AROUND PIPE. VERIFY LOCATION OF STRUCTURAL BEAMS, JOISTS, ETC. <br />BEFORE DRILLING. <br />29.FOR LOCATION OF PIPING SLEEVES AND FLOOR OPENINGS THROUGH STRUCTURAL FLOOR <br />SLABS. REFER TO DETAILS INDICATED IN STRUCTURAL DRAWINGS. <br />30.DEFERRED SUBMITTAL ITEMS SHALL BE SUBMTTED TO THE OWNER WHO SHALL REVIEW <br />AND PROVIDE NOTATION INDICATING DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO <br />BE IN GENERAL CONFORMANCE WITH BUILDING DESIGN SUBMITTAL MATERIALS SHALL <br />INCLUDE PLANS, DETAILS, CALCULATIONS PREPARED AND SIGNED BY A STATED <br />REGISTERED ENGINEER. <br />A.SUPPORTS AND SEISMIC BRACING -DESIGN LOADS FOR THE ANCHORAGE TO BE <br />COMPUTED USING STATE OF CALIFORNIA STANDARDS AND REQUIREMENTS. <br />31.CONTRACTOR SHALL PATCH AND REPAIR ALL SURFACE AREAS DAMAGED BY <br />CONSTRUCTION OPERATION. <br />32.PROVIDE TEMPORARY COVERS, CAPS, OR PLUGS ON SANITARY SEWER SYSTEM <br />THROUGHOUT THE DURATION OF THE CONSTRICTION. RAG, W ADS, DUCT TAPE, OR OTER <br />SIMILAR METHODS OF TEMPORARY COVERS SHALL NOT BE UTLIZED. UPON COMPLETIONG <br />OF CONSTRUCTION, COMPLETELY REMOVE ANY AND ALL OBSTRUCTIONS INSIDE THE <br />ENTIRE SYSTEM BY SNAKING, RODING, OR JETTING THE SYSTEM IMMEDIATELY PRIOR TO <br />PROJECT TURNOVER TO THE OWNER. <br />33.ALL VALVES, UNIONS, ETC. TO BE LINE SIZE UNLESS OTHERWISE INDICATED ON DRAWINGS. <br />34.UNIONS SHALL BE PROVIDED AND INSTALLED AFTER EACH THREADED TYPE VALVE AND <br />PRIOR TOP EQUIPMENT CONNECTIONS. <br />35.ALL INTERIOR CONDENSATE PIPING SHALL BE INSULATED W ITH CLOSED CELL FOAM <br />INSULATION; WITH FIRE HAZARD CLASSIFICATION 25/50 COMPOSITE RATING. <br />36.ANY DEVIATION FROM THE DRAWINGS OR SPECIFICATIONS SHALL BE BROUGHT TO THE <br />ATTENTION OF THE OWNER PRIOR TO INSTALLATION. <br />37.THE ENTIRE AREA UNDER CONSTRUCTION SHALL BE PROVIDED WITH A COMPLETE FIRE <br />SPRINKLER SYSTEM IN ALL RESPECTS. RELOCATED/ADD NEW SPRINKLER DROPS TO <br />EXISTING SYSTEMS WHERE REQUIRED TO PROVIDE COMPLETE COVERAGE THROUGHOUT <br />THE AREA OF CONSTRUCTION. COORDINATE FIRE SPRINKLER PIPING AND HEAD <br />LOCATIONS WITH ALL TRADES PRIOR TO FABRICATION AND/OR INSTALLATION. IF <br />CONFLICTS OCCUR BETWEEN FIRE SPRINKLER PIPING/HEADS AND LIGHTS, DIFFUSRES, <br />DUCTWORK, ETC. THE FIRE SPRINKLER PIPINGHEADS SHALL BE RELOCATED OR <br />REROUTED AT NO ADDITIONAL EXPENSE TO THE PROJECT. AN ADEQUATE SUPPLY OF <br />EXTRA PIPING AND FITTINGS SHALL BE MAINTAINED ON SITE TO ALLOW FOR FIELD <br />MODIFICATIONS. PERFORM HYDRAULIC CALCULATIONS AS REQUIRED BY NFPA, LOCAL, <br />STATE CODES AND THE OWNER'S INSURANCE AGENCY. APPROVED SHOP DRAWINGS DO <br />NOT PRECLUDE REROUTING IF SO REQUIRED BY THE OWNER. <br />38.FOR PURPOSE OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSNTIALLY <br />DIAGRAMMTIC AND ALTHOUGH SIZES AND LOCATION OF EQUIPMENT IS DRAIN TO SCALE <br />WHEREVER POSSIBLE. THE CONTRACTOR SHALL MAKE USE OF ALLDATA IN ALL OF THE <br />CONTRACTOR DOCUMENTS AND VERIFY THIS INFORMATION BEFORE ORDERING, <br />FABRICATING OR INSTALLING ANY MATERIALS. <br />39.CONTRACTOR SHALL PROVIDE AS-BUILT CONDITIONS CAREFULLY AND NEATLY RECORDED <br />USING METHODS ACCEPTABLE TO THE OWNER. THEY SHALL BE KEPT UP TO DATE DURING <br />THE ENTIRE PROGRESS OF THE WORK MADE AVAILABLE TO THE OWNER AT ANY TIME. <br />FINAL DRAWINGS SHALL BE SUBMITTED IN PDF FORMAT, SHALL MATCH SIZE OF THE <br />ORIGINAL CONTRACT DRAWINGS, AND SHALL COMPLY WITH THE FOLLOWING. <br />a.OWNER DESIGN PROFESSIONALS NAME AND STAMP SHALL BE REMOVED FROM <br />EACH DRAWING. <br />b.ADD CONTRACTOR'S NAME AND CONTACT INFORMATION ON EACH DRAWING. <br />c.ADD"AS-BUILT" TO THE LOWER RIGHT AREA OF EACH DRAWING. <br />40.PROVIDE WRITTEN WARRANT TO REPLACE ALL FAULY MATERIALS AND/OR LABOR, AT NO <br />COST TOTHE OWNER, FOR A PERIOD OF ONE YEAR FROM DATE OF THE OWNER'S <br />ACCEPTANCE. <br />GENERAL NOTES <br />1. COVERED EXPOSED HOT AND COLD WATER PIPING AND WASTE PIPING AT ALL LAVATORIES <br />WITH NEATLY PRE-FORMED PIPE INSULATION, MCGUIRE OR APPROVED EQUIVALENT. <br />2. ALL PIPING UNDER LAVATORIES SHALL BE INSULATED OR OTHERWISE COVERED. THERE <br />SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER LAVATORIES. <br />3. FAUCET CONTROLS AND OPERATING MECHANISMS SHALL BBE OPERABLE WITH ONE <br />HANDED AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE <br />WRIST. <br />4. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER THAN 5 LBF. <br />LEVER OPERATED, PUSH TYPE, AND ELECTRONICALLY CONTROLLED MECHANISMS ARE <br />EXAMPLES OF ACCEPTABLE DESIGNS. SELF-CLOSING VALVES ARE ALLOWED IF THE <br />FAUCET REMAINS OPEN FOR AT LEAST 10 SECONDS. <br />5. ACCESSIBLE PLUMBING FIXTURES SHALL COMPLY WITH ALL OF THE REQUIREMENTS OF <br />THE 2019 CALIFORNIA BUILDING CODE CHAPTER 11B-DIVISION 6. HEIGHTS AND LOCATION <br />OF ALL FIXTURES SHALL BE ACCORDING TO THE 2019 CBC TABLE 11B-604.9. FIXTURE <br />CONTROLS SHALL COMPLY WITH CHAPTER SECTION 11B-309.4. <br />ADA COMPLIANCE NOTES <br />- A - <br />ABV ABOVE <br />A.P.ACESS PANEL <br />- B - <br />BEH.BEHIND <br />- C - <br />CLG CEILING <br />CO CLEANOUT <br />CONT.CONTINUATION <br />CW COLD WATER <br />- D - <br />DN DOWN <br />DWG DRAWING <br />- E - <br />(E)EXISTING <br />- F - <br />FCO FLOOR CLEAN OUT <br />FD FLOOR DRAIN <br />FLR FLOOR <br />- H - <br />HB HOSE BIBB <br />HW HOT WATER <br />PLUMBING ABBREVIATIONS <br />- A - <br />ABV ABOVE <br />A.P.ACESS PANEL <br />- B - <br />BEH.BEHIND <br />- C - <br />CLG CEILING <br />CO CLEANOUT <br />CONT.CONTINUATION <br />CW COLD WATER <br />- D - <br />DN DOWN <br />DWG DRAWING <br />- E - <br />(E)EXISTING <br />- F - <br />FCO FLOOR CLEAN OUT <br />FD FLOOR DRAIN <br />FLR FLOOR <br />- H - <br />HB HOSE BIBB <br />HW HOT WATER <br />PLUMBING SYMBOLS <br />PIPING RISE OR DROP <br />PIPING DOWN <br />PIPING UP <br />BRANCH CONNECTION <br />BRANCH BOTTOM CONNECTION <br />SANITARY SEWER BELOW GROUND <br />SANITARY SEWER ABOVE GROUND <br />SANITARY VENT <br />DOMESTIC COLD WATER <br />DOMESTIC HOT WATER <br />DOMESTIC HOT WATER RETURN <br />EXISTING FIXTURE <br />TO BE REMOVED <br />FLOOR DRAIN <br />FLOOR CLEANOUT <br />CLEANOUT <br />SHUT OFF VALVE <br />DIRECTION OF FLOW <br />PLUGGED OUTLET <br />PIPING BREAK <br />EXISTING TO REMAIN <br />EXISTING TO BE REMOVED <br />POINT OF CONNECTION <br />POINT OF DISCONNECTION <br />DETAIL NUMBER <br />DETAIL DESIGNATION <br />DRAWING NUMBER <br />X <br />P-X <br />EQUIPMENT DESCRIPTION <br />EQUIPMENT DESIGNATION <br />EQUIPMENT NUMBER <br />PLUMBING SHEET INDEX <br />SHEET <br />NUMBER SHEET NAME <br />No. Description Date <br />1 90% CD 5/02/2024 <br />2 PERMIT SET 5/17/2024 <br />NO.NAME <br />P0.1 PLUMBING GENERAL NOTES, ABBREIVIATIONS AND SYMBOLS <br />P0.2 PLUMBING SCHEDULES <br />P1.1 PLUMBING DOMESTIC WATER FLOOR PLAN <br />P1.2 PLUMBING SANITARY AND VENT FLOOR PLAN <br />P3.1 PLUMBING DETAILS