Laserfiche WebLink
WATER HAMMER ARRESTOR <br />SCHEDULE FIXTURE UNIT TABULATION <br />PIPE SIZE IN <br />INCHES <br />MAXIMUM SPAN BETWEEN <br />SUPPORT HANGERS O.C.HANGER ROD <br />DIAMETER SIZE <br />MAX. LENGTH <br />FOR RODS <br />LONGITUDINAL <br />ANGLE BRACE <br />VERTICAL <br />HANGER ANGLE <br />(STIFFNER) <br />TRANSVERSE <br />ANGLE BRACE BOLT SIZE <br />HORIZONTAL VERTICAL <br />COPPER TUBE AND PIPE <br />1/2" AND 3/4"6'-0" 10'-0" 3/8" 37"1-1/2 X 1-1/2 X 18 <br />GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18 <br />GA. AT 40'-0" O.C.3/8" <br />1' THRU 1-1/2"6'-0" 10'-0" 3/8" 37"1-1/2 X 1-1/2 X 18 <br />GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18 <br />GA. AT 40'-0" O.C.3/8" <br />2"10'-0" 10'-0" 3/8" 37"1-1/2 X 1-1/2 X 18 <br />GA. AT 80'-0" O.C.1 X 1 X 18 GA.2-1/2 X 2-1/2 X 16 <br />GA. AT 40'-0" O.C.3/8" <br />STEEL PIPE FOR GAS <br />1/2" AND 3/4"6'-0" 6'-0" 3/8" 37"1-1/2 X 1-1/2 X 18 <br />GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18 <br />GA. AT 40'-0" O.C.3/8" <br />1' THRU 1-1/2"8'-0" 8'-0" 3/8" 37"1-1/2 X 1-1/2 X 18 <br />GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18 <br />GA. AT 40'-0" O.C.3/8" <br />2"10'-0" 10'-0" 3/8" 37"2-1/2 X 2-1/2 X 16 <br />GA. AT 80'-0" O.C.1 X 1 X 18 GA.2-1/2 X 2-1/2 X 16 <br />GA. AT 40'-0" O.C.3/8" <br />SCHEDULE 40 PVC AND ABS DWV <br />1/2" AND 3/4"4'-0" 10'-0" 3/8" 37"1-1/2 X 1-1/2 X 18 <br />GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18 <br />GA. AT 40'-0" O.C.3/8" <br />1' THRU 2"4'-0" 10'-0" 3/8" 37"1-1/2 X 1-1/2 X 18 <br />GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18 <br />GA. AT 40'-0" O.C.3/8" <br />CAST IRON HUBLESS (NO-HUB) <br />1-1/2" AND 2"15'-0" 3/8" 37"1-1/2 X 1-1/2 X 18 <br />GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18 <br />GA. AT 40'-0" O.C.3/8" <br />3" THRU 6"REFER TO SMACNA GUIDELINES IN SCHEDULE BELOW <br />SUPPORT EVERY JOINT, SUPPORT SHALL BE WITHIN 18 INCHES OF JOINT ON BOTH SIDES. (SUPPORT ALSO REQUIRED AT EACH HORIZONTAL JOINT <br />CONNECTION.) <br />ALL PIPING 2-1/2" AND LARGER PER THE FOLLOWING SMACNA GUIDELINES <br />2-1/2"10'-0" 10'-0" 1/2" 25"2-1/2 X 2-1/2 X 16 <br />GA. @ 80'-0" O.C.2 X 2 X 16 GA.2-1/2 X 2-1/2 X 16 <br />GA. AT 40'-0" O.C.3/8" <br />3"10'-0" 10'-0" 1/2" 25"2-1/2 X 2-1/2 X 16 <br />GA. @ 80'-0" O.C.2 X 2 X 16 GA.2-1/2 X 2-1/2 X 16 <br />GA. AT 40'-0" O.C.3/8" <br />4"10'-0" 10'-0" 5/8" 31"2-1/2 X 2-1/2 X 16 <br />GA. @ 80'-0" O.C.2 X 2 X 16 GA.2-1/2 X 2-1/2 X 16 <br />GA. AT 40'-0" O.C.1/2" <br />5"10'-0" 10'-0" 5/8" 31"2-1/2 X 2-1/2 X 16 <br />GA. @ 80'-0" O.C.2 X 2 X 16 GA.2-1/2 X 2-1/2 X 16 <br />GA. AT 40'-0" O.C.1/2" <br />6"10'-0" 10'-0" 5/8" 37"2-1/2 X 2-1/2 X 16 <br />GA. @ 80'-0" O.C.2 X 2 X 16 GA.2-1/2 X 2-1/2 X 16 <br />GA. AT 40'-0" O.C.1/2" <br />NOTES: <br />1. VERTICAL ANGLE ONLY REQUIRED WHEN ROD MAXIMUM LENGTH IS EXCEEDED. STIFFENER SHALL BE FULL LENGTH OF ROD LESS 2" ON EACH SIDE. <br />2. BRACING MAY BE OMITTED WHERE TOP OF PIPE IS 12" OR LESS FROM BOTTOM OF HANGER SUPPORT CONNECTED TO STRUCTURE. <br />3. ALLOW FOR EXPANSION EVERY 30'-0". <br />4. PROVIDE UPPER ATTACHMENT AS REQUIRED FOR CASES NOT SHOWN HERE. DO NOT INSTALL HANGER INSIDE INSULATION OR OTHERWISE PENETRATE VAPOR BARRIER. <br />DO NOT HANG ONE PIPE FROM ANOTHER. TRAPEZE HANGERS MAY BE USED FOR MULTIPLE PARALLEL PIPES. <br />HANGER SPACING FOR PIPE SIZE: <br />COPPER: 4"=12', 3"=11', 2-1/2"=10', 2"=9'. 1-1/2"=8', 1-1/4"=7', 1"=6', 3/4"=6', 1/2"=5'. <br />CAST IRON: 10' AND ONE NEAR ALL JOINTS. <br />STEEL: 4"=14', 3"=12', 2-1/2"=11', 2"=10', 1-1/2"=9', 1"=7', 3/4"=6', 1/2"=5'. <br />LOCATE HANGERS AS CLOSE AS POSSIBLE TO TURNS AND TEES OF PIPE. PROVIDE SUPPLEMENTARY STEEL STRUTS BETW EEN JOISTS IF REQUIRED. LOCATE HANGERS TO <br />TAKE LOAD OFF EQUIPMENT CONNECTIONS. ANCHOR WATER PIPE AGAINST SWAYING DUE TO CHANGES IN WATER VELOCITY. PROVIDE SEISMIC BRACING AS REQUIRED. <br />CHAIN OR PERFORATED STRAP IRON OR STEEL IS NOT ACCEPTABLE. <br />PDI <br />SIZE <br />PIPE <br />SIZE <br />FIXTURE <br />UNIT <br />LOAD <br />A 1/2" 1-11 <br />B 3/4" 12-32 <br />C 1" 33-60 <br />D 1 1/4" 61-113 <br />E 1 1/2" 114-154 <br />F 2" 155-330 <br />FIXTURE COLD HOT <br />WATER CLOSET - VALVE 8 - <br />WATER CLOSET - TANK 5 - <br />URINAL - VALVE 4 - <br />LAVATORY / SINK 1.5 1.5 <br />SERVICE SINK 3 3 <br />COMB. FIXTURE 3 3 <br />FOR EQUIPMENT AND FIXTURES NOT LISTED <br />ABOVE, SIZE IN ACCORDANCE WITH LOAD <br />VALUES (WSFU) ASSIGN THE SAME. <br />IN COMPLIANCE WITH PDI WH201-06 <br />PIPE 2-1/2" O.D. AND LARGER <br />PIPE 2" O.D. AND SMALLER <br />INDIRECT DRAIN TO FLOOR SINK DETAIL <br />VENT THROUGH ROOF DETAIL <br />WALL CLEANOUT DETAILS <br />FLUSH VALVE TRAP PRIMER <br />MULTIPLE FIXTURESSINGLE FIXTURES <br />FOR CONNECTION <br />TO STRUCTURE <br />SEE STRUCTURAL <br />DRAWINGS <br />LONGITUDINAL <br />DIAGONAL ANGLE <br />(SLOPE 1 TO 1). FOR <br />SIZE AND SPACING. SEE <br />SCHEDULE ALT. SIDES <br />EACH BRACE. <br />ATTACH BOLT. <br />SEE SCHEDULE <br />FOR SIZE <br />"B-LINE" B327 <br />SHORT ANGLE <br />OR EQUAL <br />INSULATION PER <br />CEC TABLE 123-A <br />TYPICAL PIPE. SEE <br />PLAN FOR SIZE <br />AND LOCATION <br />HANGER ROD. <br />ADD VERTICAL ANGLE <br />STIFFENER IF LENGTH IS <br />GREATER THAN MAX. <br />LENGTH SHOWN ON PIPE <br />SUPPORT SCHEDULE <br />TRANSVERSE ANGLE BRACE. <br />ALTERNATE SIDES EVERY <br />BRACE <br />PIPE SLEEVE WITH I.D. 1/4" <br />LARGER THAN O.D OF BOLT <br />"B-LINE" B3100 CLEVIS <br />HANGER OR EQUAL. <br />SEE SCHEDULE FOR SPACING <br />"BLINE" B3162 OR EQUAL <br />PIPE SADDLE <br />FOR CONNECTION <br />TO STRUCTURE <br />SEE STRUCTURAL <br />DRAWINGS <br />THREADED HANGER ROD. <br />ADD VERTICAL ANGLE <br />STIFFENER IF LENGTH IS <br />GREATER THAN MAX. LENGTH <br />SHOWN ON PIPE SUPPORT <br />SCHEDULE. <br />NUT AND WASHER <br />TOP AND BOTTOM TRANSVERSE ANGLE BRACE. <br />ALTERNATE SIDES EVERY <br />BRACE <br />STIFFENER SHALL BE <br />SPOT WELDED. <br />"BLINE" B3162 OR EQUAL <br />PIPE SADDLE <br />INSULATION PER <br />CEC TABLE 123-A <br />TYPICAL PIPE. SEE <br />PLAN FOR SIZE <br />AND LOCATION <br />"B-LINE" - B3690 <br />ADJUSTABLE "J" <br />HANGER <br />1 <br />23 <br />4 <br />5 <br />6 <br />FINISHED FLOOR FLOOR DRAIN <br />P-TRAP <br />PPA1/2" MINIMUM FRESH <br />WATER MAKE-UP LINE <br />(TRAP PRIMER LINE) <br />1/2" TP LINE <br />1-1/2" X 12" 17 GAUGE FLUSH <br />VALVE PRIMER TUBE WITH 1/2" <br />COMPRESSION FITTING <br />3-1/4" MIN. <br />FLUSH VALVE <br />TAIL PIECE <br />FLOWB <br />6" <br />A <br />12 <br />" <br />VACUUM BREAKER <br />PORTS <br />POSITION BEVELED END OF <br />PRIMER LINE FACING UP <br />TO CATCH WATER THAT <br />PASSES THROUGH THE <br />TAILPIECE <br />1 1/2" 17 GAUGE <br />2" <br />5/8" SHALLOW ESCUTCHEON <br />1/2" CHROME PLATED <br />TRAP PRIMER LINE 1/2" X 12" <br />1/2" COMPRESSION X 3/8" NPT. <br />CHROME PLATED <br />1/4" PER 1'-0" <br />SLOPE <br />BA <br />CLEANOUT AND ACCESS COVER. <br />TOP OF COVER TO BE FLUSH W/ TOP <br />OF FLOOR. <br />FLOOR LINE <br />1/8" C.I. BEND BALANCE OF PIPING SAME <br />AS CLEANOUT TO GRADE. <br />THREADED CLEANOUT PLUG <br />CLEANOUT TEE <br />CHROME PLATED STEEL <br />COVER PLATE WITH <br />SECURING SCREW <br />FINISHED WALL SURFACE <br />SCALE <br />NONE <br />SCALE <br />NONE <br />SCALE <br />NONE <br />SCALE <br />NONE <br />SCALE <br />NONE <br />SCALE <br />NONE <br />PIPING SUPPORT DETAIL <br />FLUSH VALVE TRAP PRIMER ASSEMBLYWATER HAMMER ARRESTOR DETAIL <br />DIA. <br />DRAIN LINE TO <br />DISCHARGE INDIRECTLY <br />PIPE PENETRATIONS IN <br />CABINETRY TO BE SEALED <br />WITH FLEXIBLE SEALER <br />AIR GAP = 2x DIA <br />1" MINIMUM <br />FLOOR SLAB <br />WASTE <br />FINISHED FLOOR <br />FLOOR GRATE <br />NOTE: <br />1. A AND B DIMENSIONS WILL VARY DEPENDING <br />UPON FLUSH VALVE HEAD USED. <br />2. PRIMING TUBE MAY BE CUT OFF TO ADJUST <br />FOR THE ROUGH-IN OF A FRESH WATER <br />MAKE-UP LINE TO FLOOR DRAIN TRAP. <br />3. THE FURTHEST RECOMMENDED DISTANCE <br />OF MAKE-UP LINE IS 20 FEET TO THE FLOOR <br />DRAIN. <br />TO FIXTURE UNITS <br />(TYP.) <br />HOT OR COLD <br />WATER SUPPLY <br />IF HORIZONTAL BRANCH <br />IS LESS THAN 20' LONG, <br />PROVIDE ONE WHA AT <br />END OF THE LINE <br />IF BRANCH IS GREATER <br />THAN 20' LONG, PROVIDE <br />ANOTHER WHA IN <br />MIDDLE, EACH SIZED FOR <br />HALF THE FIXTURE UNITS <br />PDI SIZE <br />"A" <br />CONTRACTOR SHALL PROVIDE WATER HAMMER <br />ARRESTERS BY PRECISION PLUMBING PRODUCTS, JAY <br />R SMITH, OR APPROVED EQUAL WITH PISTON AND <br />O-RING CONSTRUCTION, HAVING PDI #WH-201, ASSE <br />1010 AND ANSI a112.261M CERTIFICATION. INSTALL IN <br />HORIZONTAL OR VERTICAL POSITION, BUT NEVER <br />UPSIDE DOWN. INSTALL IN LINE WITH WATER FLOW <br />DIRECTION IF POSSIBLE. SIZE THE UNITS AS SHOWN ON <br />THE DRAWINGS AND/OR PER THE TABLES SHOWN. <br />RISER <br />ISOLATION VALVE <br />FITTING ADAPTER <br />THREADED END <br />CONNECTION <br />WATER HAMMER <br />ARRESTOR <br />3 3/8"∅ <br />3 <br />1 <br />/ <br />2 <br />" <br /> <br />M <br />I <br />N <br />. <br />8 <br />1 <br />/ <br />2 <br />" <br /> <br />M <br />A <br />X <br />. <br />WATER HAMMER <br />ARRESTORS <br />LOCATED ABOVE <br />CEILING <br />FLOOR CLEANOUT <br />WALL CLEANOUT <br />NOTE: <br />CLEANOUT NOT TO BE <br />LOCATED IN CARPETED <br />AREA. <br />6" MIN. <br />PER CPC 906.1 <br />FIN. ROOF <br />MIN. 12" <br />FROM A VERTICAL SURFACE <br />PARAPET OR <br />OTHER VERTICAL <br />SURFACE ABV. <br />ROOF <br />SEE ARCHITECTURAL <br />FOR VENT PIPE <br />FLASHING. <br />VENT TERMINATION <br />(LOCATE AT LEAST 10 FEET <br />FROM OUTSIDE AIR INTAKE) <br />A <br />A <br />3 <br />2 1 2 <br />A <br />Scale <br />Project number <br />Date <br />Drawn by <br />Jen Dunbar, AIA <br />phone: 310.435.3928 <br />12314 La Maida Street <br />Valley Village, CA 91607 <br />jen@dunbararchitecture.com <br />DUNBAR <br />ARCHITECTURE <br />As indicated <br />4/ <br />4 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />1 <br />1 <br />: <br />4 <br />2 <br />: <br />4 <br />4 <br /> <br />A <br />M <br />P3.1 <br />PLUMBING <br />DETAILS <br />23004 <br />CYPRESS STREET <br />FIRE STATION <br />REHABILITATION <br />CITY OF SANTA ANA <br />1/15/2025 <br />RM/EG <br />625 S. CYPRESS <br />No. Description Date <br />1 90% CD 5/02/2024 <br />2 PERMIT SET 5/17/2024 <br />3 BACK CHECK SET 1/15/2025