My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
322 N Harbor Blvd - Plan
PBA
>
Building
>
ProjectDox
>
H
>
Harbor Blvd
>
322 N Harbor Blvd
>
322 N Harbor Blvd - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 11:14:40 AM
Creation date
2/24/2026 11:13:50 AM
Metadata
Fields
Template:
Plan
Permit Number
20183983
20183984
20183985
30147771
30147772
30147773
40139523
40139524
101120841
101120842
Full Address
322 N Harbor Blvd
Street Number
322
Street Direction
N
Street Name
Harbor
Street Suffix
Blvd
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
714
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 Corporate Park, Suite 270, Irvine, California 92606 <br />Office (949) 221-0900 <br />Email: global@globalgeo.net <br /> <br /> <br /> <br /> <br /> <br />June 11, 2024 <br />Project 9230-04 <br /> <br />DMS Consultants, Inc. <br />12377 Lewis Street, Suite 101 <br />Garden Grove, California 92840 <br /> <br />Attention: Mr. Surender Dewan, P. E. <br /> President <br /> <br />Subject: Geotechnical Report Update <br />Proposed 4-story Mixed-Use Building <br /> 322 N. Harbor Boulevard <br /> Santa Ana, California <br /> <br />Reference: Global Geo-Engineering, Inc. – Supplemental Geotechnical Investigation, <br />Proposed 4-story Mixed-Use Building, 322 N. Harbor Boulevard, Santa Ana, <br />California Project 9230-04 dated December 17, 2021 <br /> <br />Dear Mr. Dewan: <br /> <br />1. INTRODUCTION <br /> <br />a) At your request, we are providing this report update for the proposed development <br />in the city of Santa Ana, California. <br /> <br />b) The subject site was investigated, from a geotechnical point of view, by our firm <br />in 2021. The investigation included drilling three borings to depths ranging from <br />25 feet to 51.5 feet below the existing grade, collecting and testing representative <br />samples to determine the engineering properties and providing design and <br />construction related geotechnical recommendations. The results of our <br />investigation were provided in the referenced report dated December 17, 2021. <br /> <br />2. Existing Site Conditions <br /> <br />We understand that the conditions have not changed significantly since our field <br />exploration in December 2021. <br /> <br />3. Conclusions and Recommendations <br /> <br />a) The recommendations provided in the referenced report generally remain <br />applicable. <br /> <br />GLOBAL GEO-ENGINEERING, INC.
The URL can be used to link to this page
Your browser does not support the video tag.